ML20235K983

From kanterella
Jump to navigation Jump to search

Ack Receipt of Util Transmitting Proposed Amend to Physical Security Plan,In Response to Miscellaneous Amends & Search Requirements.Response to Encl Comments on Physical Security Plan Changes Requested within 30 Days
ML20235K983
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/22/1987
From: Paulson W
Office of Nuclear Reactor Regulation
To: Deddens J
GULF STATES UTILITIES CO.
References
TAC-65395, NUDOCS 8710050302
Download: ML20235K983 (3)


Text

-

d-...

Docket No. 50-458

'Mr.LJames'C. Deddens Senior Vice President,'(RBNG)

, Gulf States Utilities SEP 2 21981 P.O. Box 220 St. Francisv111e, LA 70775

Dear Mr. Deddens:

SUBJECT:

MISCELLANEOUS AMEN 9MENTS/ SEARCH' REQUIREMENTS RIVER BEND STATION (TAC #65395)

This is to' acknowledge receipt of the Gulf State Utilities letter, dated November 20, 1986, which transmitted a proposed amendment to the River Bend Station Physical Security Plan, in response to the Miscellaneous Amendments and Search Requirements.

The submitted document has been reviewed and we have determined that additional information and revisions _to the plan are required prior to our approval.

The enclosed comments are based upon pertinent NRC regulations and published guidance describing methods, acceptable to the NRC staff, for implementing specific parts of those regulations.

It is. requested that you provide your response to these comments within 30 days

'from receipt of this letter.

The reporting and/or record keeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Should you have any questions concerning the enclosed comments, please contact the reviewer, Robert Skelton, at (301) 492-4533.

Sincerely, l

'1 M

""U 8710050302 B70922 PDR ADDCM 05000458 Project Directorate W F

PDR Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

DISTRIBUTION W/ ENCLOSURES:

Physical Security Plan Comments RSGB rf Sec rf RSkelton CBuracker (2) cc w/ enclosure:

Region IV PNoonan See next page WPaulson CDocket. File;50.4581 1

Case File NRC PDR l

RErickson wo/ encl Local POR LBush wo/ enc 1 PStarcher l

0[

i. A 0 0FC
RSGB 1 p.
RSGB Qp....._.__.._.g-:.........gqp.......__g/g___...
RSGBf/
RSGB
PD I
PD NAME : C" ;;h 65Eard : CBura e
LBush
PNoonan
WPaulson

.......:.........................._.._.___..._... 4.:gErickson r....__............................._.._.....

f

.DATE :9/gf/88

9/# /87

/87

9/p87
9051/87
9/P/87

3 l

l Mr. James C. Deddens Gulf States Utilities Company River Bend Nuclear Plant cc:

Troy B. Conner, Jr., Esq.

Mr. J. E. Booker Conner and Wetterbahn-Manager-River Bend Oversight 1747 Pennsylvania Avenue, NW P. O. Box 2951 Washington, D.C.

20006 Beaumont, TX 77704 Mr. Eddie Grant Mr. William H. Spell, Administrator Director - Nuclear Licensing Nuclear Energy Division Gulf States Utilities Company Office of Environmental Affairs P. O. Box 220 P. O. Box 14690 St. Francisville, LA 70775 Baton Rouge, Louisiana 70898 Richard M. Troy, Jr., Esq.

Assistant Attorney General in Charge Mr. J. David McNeill, III State of Louisiana Department of Justice William G. Davis, Esq.

234 Loyola Avenue Department of Justice New Orleans, Louisiana 70112 Attorney General's Office 7434 Perkins Road Resident Inspector Baton Rouge, Louisiana 70808 P. O. Box 1051 St. Francisville, Louisiana 70775 H. Anne P1ettinger 3456 Villa Rose Drive Gretchen R. Rothschild Baton Rouge, Louisiana 70806 Louisianians.for Safe Energy, Inc.

1659 Glenmore Avenue Baton Rouge, Louisiana 70775 President of West Feliciana Police Jury Regional Administrator, Region IV P. O. Box 1921 U.S. Nuclear Regulatory Commission St. Francisville, Louisiana 70775 Office of Executive Director for Operations Mr. Frank J. Uddo I

611 Ryan Plaza Drive, Suite 1000 Uddo & Porter Arlington, Texas 76011 6305 Elysian Fields Avenue i

Suite 400

{

Philip G. Harris New Orleans, Louisiana 70122

)

Cajun Electric Power Coop. Inc.

10719 Airline Highway P. O. Box 15540 Baton Rouge, LA 70895 1

I

l*

Docket No. 50-458 ENCLOSURE I

COMMENTS ON PHYSICAL SECURITY PLAN CHANGES (MISCELLANE0US AMENDMENTS AND SEARCH REQUIREMENTS)

RIVER BEND STATION Provide a schedule for implementing the amended safeguards requirements within 180 days after Commission approval of the proposed security plan.

Reference 10 CFR 73.55.

State that vital area access controls will not be dropped for life threatening I

situations not involving public health and safety.

Reference 10 CFR 50.54(x) l and (y) and Generic Letter 87-08 (Q&A #3).

l 0

j.

Provide a commitment that the search requirements will be implemented within 60 days after Commission approval of the proposed revisions.

Reference 10 CFR 73.55(d)(1).

Provide a commitment that if security force members leave the protected area to perform official duties subsequent to their initial entry and search, they will l

be searched prior to re-entry into the protected area if they have not been under direct observation or accompanied by another member of the security force.

Reference 10 CFR 73.55(d)(1) and Generic Letter 87-08 (Q&A #11).

l Provide a commitment to ensure prompt access to vital equipment to accommodate the potential need for rapid ingress or egress of individuals during emergency l

conditions or situations.

Indicate how this prompt access will be ensured (e.g.,

by issuing override keys to appropriate operators and security force members at the start of each shift, or by other acceptable means).

Reference 10 CFR 73.55(d)(7)(ii) and Generic Letter 87-08 (Q&A #6).

Revise the commitment on page 14-1 to periodically (annually) review physical security and contingency plans and procedures including the statement " evaluate their potential impact on plant and personnel safety".

Reference 10 CFR 73.55(d)(7)(ii)(B) and Regulatory Guide 5.65.

Delete from the commitment on page 6-19 the 13 months regarding all keys, locks, combinations, and related access control devices used to control access to protected and vital areas shall be changed or rotated at least every 12 months.

Reference 10 CFR 73.55 (d)(9).

l t

I i

i l