Monthly Operating Rept for Jan 1989 for McGuire Nuclear Station
ML20235J687
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 01/31/1989
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20235J689 List:
References
NUDOCS 8902240375
Download: ML20235J687 (11)


Text

_ _-

.' de j

l OPERATINB DATA REPORT i

DDCKET'ND 50-369' l

DATEFebruary 15. 1989

'0PERATING STATUS CDMPLETED BY R.A. Williaes TELEPHONE 704-373-5987

1. Unit Naeet McGuire 1
2. Reporting Period: January 1,1989-January 31,1989
3. Licensed Thermal Power (MWt):

3411

4. Naseplate Rating (Bross MWe):

13054 Notes aNaseplate Rating

5. Design Electr2tal Rating (Net Mwel:

!!B0 (Gross MWel calculated as-

6. Maximus Dependable Capacity (Stoss MWe):

1171 1450.000 MVA x.90 power

7. Maxiaus Dependable Capacity (Net Mde):

1129 factor per Page lii,

8. If Changes Occur in Capacity Ratings (Itess Nuater 3 Through 7) Since List NUREG-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):
10. Feason For Restrictions, if any:

This Month Yr.-to-Date Cusulative

11. Hours In Reporting Period 744.0 744.0 62856.0
12. Nutber Of Hours Reactor Was Critical 744.0 744.0 44391.4
13. Reactor Reserve Shutdoun Hours

--0-- -

--0--

14. Hours Generator On-Line 741.4 741.4 43851.2
15. Unit Reserve Shutdown Hours

- --0--

--0---

1L 6 toss Thersal Energy Benerated (MWH) 2245259 2245259 129868784

17. Gross Electrical Energy Generated (MWH) 780644 780644.

44B79601

18. Net Electrical Energy Generated (MWH) 749756 749756 42803364
19. Unit Service Factor 99.'7 99.7 69.8 20.- Unit Availability Factor 99.7 99.7 69.8 j
21. Unit Capacity Factor (Using MDC Net) 89.3 89.3 59.5
22. Jnit Capacity Factor (Using DER Net) 85.4 85.4 57.7

'23. Unit Forced Outage Rate 0.0 0.0 11.2

24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

.None j

i

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to teasercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL DPERATION I

l 8902240375 890131 i

PDR ADOCK 05000369

%.,1h R

PDC I

L

.l OPERATING DATA REPORT DOCKET NO 50-369 l! NIT '

McGuire 1 DATEFebruary 15, 1989 COMPLETEDBY R.A. Willlaes TELEPHONE 704-373-5987~

' MONTH

' January,1989 D

MERA6E DAILY POWER LEVEL DE AVERAGE DAILY POWER LEVEL E

(MWe-Net)

(MWe-Net) 1 132 17 1157 2'

301 18 1159 3-321 19 1147 4

361 20

!!59 5

714 21 1160 6

876 22

!!60 7

944 23 1158 8

'1074 24 1159 9

1074 25 1158 10 1142 26 1159 11 1150 27 1158 12 1154 28 1157 13 1158 29

!!58 14 1159 30 1157 15 1158 31 1158 16 1157 I-a

(

E8M3 E

E T

E I

M Ii 0

9R/

V E

E S

G F

L T

' tst -

.)

I C

P E

N C

I A

E

- atrG 6I5 3U1J4 T

N S

T A

O L

H reoE G/

0 C

E R

R E

A T

G a e pR 0C2 7

E R

E P

V C

C M

pheU 5M0J(

ROR V

I E

L I

S NE t eSRN RTU O

R T

A L

E OT i r

(

O C

T A

V U

S b P yt

.EEYE CNE E

I A

R KY i

rne OMTBN OR N

D D

R R

E RS h r t el NAA O

DI I

E E

E D

W O

xonvi EfEEF NDDH NTT B

E M

T Y

O WR

)

T EP ACN R

P R

A H

P O

4 ET TE AE U

S E

W OT

(

KI EL E

V T

R T

D E

R TC CN LE S

E E

N E

N O

E OU PT U

R R

V I

E I

F DT D

M A

P O

O F

B LE O

C F

ES R

P OD m)

C E

TT N

U AG H

an E

N AN O

T MN E

ri C

I UE I

RR mca UT B

LR K

N XT EO aSl DS R

AR R

I US WC r

p EE U

VU O

A LE ON ccx RT T

EC W

M FT PI SiEt(

S lla aamr N

O T

duuoe I

N N

N x

X N

U U

onnth E

I I

x E

I R

R haaut T

)

C 9

5 NE B

B x

V B

T T

tMMAO OD R

R x

L R

S S

e-U 8

(

M1234 D

9 PO U

U x

A U

N N

)

E 1

MC T

T x

V T

I I

3 R

O

(

y C

R r

E a

E

)

S MD A

A E

H A

C E

W u

O n

4 Y EO H

H I

H H

R I

S TC P

a

(

J DNA E

S T

S NT R N

EN O W

H CE PO

)

O T

IV EN n

D N

LE R i

T O

a U

M l

H T N p

n TD U WX x

o S

T

)

R 3EO FH O/

4 E

i t

t&

MH OS DR T

O

(

(

I P

s c

ee i

N E

)

U R

2 B

B A

A A

B A

rt r

REASON u

ti

(

l r s

io e

N 3

a R

O 6

Fe c

y IS TR 2

tngr AU nanort RO enitoso UH mel ati ptelanar D

ninuurire ouif gemeh s q a e e p

)

1 TYPE S

S S

F F

S F

aEMRROA e-(

RABCDEFG

)

2 2

1 1

1 1

1 2

4

(

fo E

1 1

1 1

1 1

1 d

1 T

e A

l e

D 9

9 9

9 9

9 9

du g

8 8

8 8

8 8

8 ed a

ce P

rh P

P P

P P

P oc FS 1

1 2

3 4

5 6

NO FS

)

1 l

1

(

E8M?

E Ii 0

9R/

V E

tst -

6I5

.)

I C

N

- atrG 3U1J4 T

N O

reoE

- G/

0 C

E I

GaepR 7

E R

T ph e U 0C2 5MOJ(

ROR A

teSRN RTU R

ir

(

O C

B b P yt.

.EEYE CNE I

i rne OMTBN OR L

hrtel NAA O

DI A

xon5i NDDH NTT C

EfEEF

)

T EP ACN 4

ET TE A E E

(

KI EL E

V R

CN LE S

E O

OU PT U

R C

D M

A P

X O

C E

m)

C

/

an E

ri R

mca O

aSl C

r p

N ccx I

SiEt(

S ll a aamr N

O T

duuoe I

N U

onnth E

R haaut T

)

C 9

5 N E T

tMMAO O D S

e-U 8

(

M1234 D

9 P O N

)

E 1

M C I

3 R

O

(

y C

R r

E a

E SM D E

W u

)

O n

4 YE O I

ST C P

a

(

J DNA E

S T

S NTR N

ENO W

H CEP O

)

O T

IVE N n

D N

LER i

T O

a U

M l

H TN p

ni TD UW X x

oL S

T

)

R 3EO FHO /

E i

t t&

T O

MH OSD R

(

(

I P

s c

ee i g N

E

)

U R

2 B

rt r

REASON u

ti

(

lr s

io ei N

a Ra O

Fe IS c

yT TR tngr AU nanortrE RO enitoso UH mel atit pt el ana D

ninuurire ouif gemeh s q a e e pd

)

1 TYPE S

aEMRROAO e-(

RABCDEFG

)

2 2

5

(

fo E

1 d

2 T

e A

l e

D 9

du g

8 ed a

ce P

rh P

oc FS NO 7

FS

)

1

(

J L

DOCKET N0:

50-369 l

i UNIT:

McGuire 1 l

1 DATE:

02/15/89 NARRATIVE

SUMMARY

1 I

Month:

January, 1989 i

McGuire Unit 1 began the month of January at reduced power in preparation for a Post Refueling Outage Turbine Overspeed Trip Test. The unit was removed from service at 0129 on 01/01 for the test, and returned to service at 0406 the same day. The unit then increased power to 25% at 0625 on 01/01, where power was held to evaluate Intermediate Range Excore Nuclear Instrumentation Currents.

The unit then held power at 32% on 01/01 to work on a Main Feedwater System At 2119 on.1/01, power was reduced.to 30% to repair a Main Turbine 0

Valve.

Hydraulic Oil System leak. The unit then experienced brief holds at 38% power I

on 01/02, for Power Escalation Testing, at 49% power on 01/04, to work on the l

moveable Incore Detector System and at 77% power on 01/05, for Nuclear j

Instrumentation Calibration. The unit then operated at or near 100% power the.

l remainder of the month, without any further significant reductions.

i l

Prepared by:

J. J. Mead Telephone: 704-373-5762 1

1 MONTHLY REFUELING INFORMATION REQUEST

1.. Facility name:-McGuire, Unit 1 2.

Scheduled' next refueling shutdown: February, 1990 3.

Scheduled restart'following refueling: April, 1990 4'. 'Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No If yes, what will-these be?

If no, has reload design and core conf.83uration been reviewed by Safety-Review Committee'regarding unreviewed safety questions? N/A 5.

' Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A

6. 'Important licensing-considerations (new or different' design or supplier, unreviewed design or. performance analysis methods, significant changes in design or new operating procedures).
7... Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool:

369 8.

Present' licensed fuel pool capacity:

1463

. Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 1

DUKE POWER COMPANY DATE:

February 15, 1989 Name of

Contact:

J. A. Reavis Phone 704-373-7567

)

I

. ' l[' s I

g l

b GPERATINGDATAREPORT

_ DOCKET NO 50-370 DATE February 15J 1989

'0PERATING STATUS COMPLETED BY.

R.A. Williges TELEPHONE '704-373-5937-

1. Unit Nase: McGuire 2 2.' Reporting.Pericdi January 1,-1989-January 31,-1989 KlicensedThermalPower.(MWt):

3411

'4. Naaeplate Rating (Broes MWe):

13054 Notes *Naseplate Rating.

5. Design Electrical Rating (Net MWe):

1180-(Gross MWe) calculated as:.

6.RaxinusDependableCapacity(6rossMWe):

1171 1450.000 MYA x.90 power

?7. Maximus Dependable Capacity (Net MWe):,

1129 factor per Page lii,

~B. If Changes Occur in Capacity Ratings (Iteas Nusber 3 Through 7) Gince Last NUREG-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, if any:

This Month Yr.-to-Date Cumulative

11. Hcurs In Reporting Period 744,0 744.0 43152.0
12. Number Of Hours Reactor Was Critical 744.0 744.0 32503.4
13. Reactor Reserve' Shutdown Hours

--0--

--0--

--0--

14. Hoars Benerator On-Line' 744.0 744.0 31602.8
15. Un'it Reserve Shutdown Hours

--0--

--0--

.16. Gross Thersal Energy Senerated (MWH) 2475080 2475080 103783184

17. Gross Electrical Energy Generated (MWH) 869524 869524 36323406
18. Net Electrical Energy Generated (MWH) 537720 637720 34827835
19. Unit Service Factor 100.0 100.0 73.7 20.UnitAvailabilityFactor 100.0

.100.0 73.7

21. Unit Capacity Factor (Using MDC Net) 99.7 99.7 69.8
22. Um t Capacity Facter (Using DER Net) 95.4 95.4 68.4 23.' unit Forced Outage Rate 0.0 0.0 11.8
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

-None

25. If Shut Down At End Of Repert Period. Estimated Date of Startup:
26. Un!ts In Test Status (Frior to Coesercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY l

COMERCIAL DPERATION

-.------_-_______-J

l Y

OPERATING DATA REPORT-DOCKET NO 50-370 j.

UNIT McGuiro 2 l

.DATE February 15,1989 COMPLETED BY R.A. Williams.

(-

TELEPHONE 704-373-5987

'00 NTH' January.1989

. Of AVERAGE DAILY F0WER LEVEL.

DE AVERAGE DAILY F0WER LEVEL (MWe-Net)

(MWe-Net)-

1 1151 17 1155 2

1152 18 1155 3

1152~

19 1154

-4 1133 20 1138 5

1152 21 1152 6

1147 22 1155 7

1155 23 1155 0

1154 24 1156 9

1154 25 1157

~10 1153 26 1156 l

11 1153 27 1041 i

12 1156' 28 534 l

13 1157 29 1068 i

1

.14 -

1157 30 1143 15 1146 31 1158 l

16 1155 M

--1-.a

_.--.a-a.--.-

E8M3 E

T Ii 0

0R/

V E

F N

tst -

.)

I C

O E

- atrG 7I5 3U1J4 T

N M

reoE G/

0 C

E TS U

GaepR 0C2 7

E R

UK R

pheU 5M0J(

ROR OA T

teSRN RTU E

S i r

(

O C

YL N

b P yt

.EEYE CNE R

I i

rne OMTBN OR TE hrtel NAA O

DI SB R

xonvi EfEEF NDDH NTT IU A

)

T EP ACN MT E

4 ET TE A E E

L

(

KI EL E

V H R C

CN LE S

E C E UN OU PT U

R S

NO D

M A

P Y N I

O C

R E RT m)

C A D OA an D N FR ri N O B

mca O C DI aSl C

LL r

p E O OA ccx S T HC SiEt(

S lla aamr N

O T

duuoe I

N H

U onnth E

C R

haaut T

)

C 9

5 N E X

T tMMAO O D E

S e-U 8

(

M1234 D

9 P O T

N

)

E 1

M C H

I 3

R O

(

y C

'R r

E a

E SM D C

E W

u

)

O n

4 YE O H

I ST C P

a

(

J k

DNA E

S T

S NTR N

ENO

)

W H

CEP O O

T IVE N n

D N

LER i

T O

a U

M l

H TN p

ni TD UW X x

o S

T

)

R 3EO FHO /

E i

t t&

MH OSD R

(

T O

(

I P

s c

ee ig N

E

)

U R

2 A

B rt r

REASON u

ti

(

lr s

io e

N a

Ra O

Fe IS c

yT TR tngr AU nanortr RO enitoso UH melatit ptel ana D

ninuurire o uif g e m s q a e e p

)

1 TYPE F

S aEMRROA e-(

RABCDEF

)

2

(

7 9

2 2

E 1

1 d

T e

A l

D 9

9 du 8

8 ed ce rh P

P oc FS NO 1

2 FS

)

1

{

DOCKET NO:

50-370 UNIT:

McGuire 2 DATE:

02/15/89 NARRATIVE

SUMMARY

Month: January, 1989 McGuire Unit 2 began the month of January operating at 100% full power. On The unit 01/27, the unit reduced power to 40% due to Main Condenser Tube Leaks.

returned to 100% power at 1005 on 01/29, following a hold at 76% power for Nuclear Instrumentation Calibration. The unit then operated at 100% power for the remainder of the month.

Prepared by:

J. J. Mead.

Telephone: 704-373-5762

1 MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 2 2.

Scheduled next refueling shutdown: July, 1989 3.

Scheduled restart following refueling: September, 1989 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool:

518 8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 l

1 1

BUKE POWER COMPANY DATE:

February 15, 1989 Name of

Contact:

J. A. Reavis Phone:

704-373-7567 4

1

1 McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT December 1988 1.

Personnel Exposure For the month of December, no individual (s) exceeded 10 percent of their all'wable annual radiation dose limit.

2.

The total. station liquid. release for December has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for December has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.