ML20235J439
| ML20235J439 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 09/24/1987 |
| From: | Russell W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Gallagher J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20235J442 | List: |
| References | |
| NUDOCS 8710010449 | |
| Download: ML20235J439 (4) | |
See also: IR 05000352/1986099
Text
f
__
n
MS
,
24 SEP 1987
~.
g.
-
Docket No. 50-352
.
.
Philadelphia Electric Company
!.
ATTN: Mr. J. W. Gallagher
m c:
Vice President
9 t2
'
Nuclear Operations
W 95
2301 Market Street
?~
'
Philadelphia, Pennsylvania 19101
) ca
m
-
".'I
Gentlemen:
v
a.
'
Subject:
Systematic Assessment of Licensee Performance (SALP); Report
No. 50-352/86-99 - Amended Report
This refers to the assessment we conducted of the activities at the Limerick
Generating Station, Unit 1, for the period February 1,1986 through January 31,
1987. This report was discussed with you at a meeting on July 2,1987 at your
Training Center in Limerick, Pennsylvania. The list of meeting attendees is
attached as Enclosure 1.
In response to your written comments (Enclosure 2)
on our report, no changes have been made to the SALP.
Some minor editorial
changes to the enclosed amended report (Enclosure 3) were made by my staff.
Our overall assessment confirmed a strong orientation toward safe plant
operation.
In particular, station management exhibited an ability to predict
problems by taking a proactive approach to critically self-evaluate performance
~
and institute effective corrective actions to prevent problems from occurring.
Your letter of August 14, 1987 addressed the corrective actions taken and
planned regarding the Operations, Radiological Controls, Security and
Safeguards, Training and Qualification Effectiveness, and Licensing areas.
No reply to this letter is required.
Your actions in response to the NRC
Systematic Assessment of Licensee Performance will be reviewed during future
inspections of your licensed facility.
We appreciate your cooperation.
Sincerely,
1
8710010449 870924
Original Signed By
ADOCK 0 % g2
WILLIAM T. BUSSELL
G
William T. Russell
Regional Administrator
Enclosures:
1.
Attendees at Limerick 1 SALP Management Meeting
2.
Response letter from PECO dated August 14, 1987
3.
Amended SALP Report
4.
Letter from NRC to PEC0 transmitting original Report dated June 5,1987
5.
SALP Board Report Errata Sheet
OFFICIAL RECORD COPY
LIMERICK 1 SALP/ LETTER - 0001.0.0
09/16/87
%o
_ _ _ - _ _ _ .
_ _ _
_
. _ .
_ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
g4
)
Philadelphia Electric Company
2
-
'
cc w/ enc 1:
John S. Kemper, Senior Vice President, Engineering and Production
G. Leitch, Nuclear Generation Manager
J. Franz, Manager Limerick Generating Station
'
Troy B. Conner, Jr. , Esquire
!
Eugene J. Bradley, Esquire, Assistant General Counsel
i
W. M. Alden, Engineer in Charge, Licensing Section
I
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
-
Commonwealth of Pennsylvania
Chairman Zech
Commissioner Roberts
Commissioner Bernthal
Commissioner Carr
Commissioner Rogers
K. Abraham, PA0 (12 copies)
'
bcc w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
Section Chief, DRP
Robert J. Bores, DRSS
Director, DRS
T. Martin, DRSS
J. Taylor, DEDO
W. Russell
J. Allan
D. Holody
K. Abraham, PA0 (2 copies)
Management Meeting Attendees
DRP WISHLIST Coordinators
J
Q4h
f b.
RIf.DRP
RI:D
f./
P,-
pRP
A
Linville/rbl/mlb
--GeHtrP/d!dW
'n s
-
U
A
n
/7/87
k/ /87
E/ N /87
9 / 16 / 8 7
/
87
0
p
RI:RAMd
Russell
/g/87
0FFICIAL RECORD COPY
LIMERICK 1 SALP/ LETTER - 0002.0.0
09/08/87
,
l
_ _ - _
_
.
.
ENCLDSURE 1
~
Attendees ~at' Limerick Generating Station Unit 1 SALP Management Meeting
(July 2, 198/)
NRC
E. Kelly:
Senior Resident Inspector, Limerick
J. Linville
Chief,-Reactor Projects Section EA, DRP
j
R. Gallo-
Chief, Projects Branch No. 2, DRP
W. Kane
Director, DRP
S. Kucharski
Resident Inspector, Limerick
Licensee:
J. Austin
President
J. Kemper
Senior Vice President Engineering and Production
J. Kowalski
Vice President Engineering and Research
J. Gallagher
Vice President Nuclear Operations
J. Cooney-
Manager Nuclear Support
J. Franz
Limerick Plant Manager
G. Edwards.
LGS Technical Engineer
N. Hunt-
Engineer Radwaste LGS
L. Hopkins
Operations Engineer
D. Wesley
Analyst LGS
L. Pyrih
Chief Mechanical Engineer
E. Kistner
Assistant to Vice President Engineering and Research
C. Nengers
Senior Engineer LGS Licensing Branch
W. Alden
Engineer-In-Charge - Licensing
C. Endries
Administrative Engineer LGS
~C. W'ler
Maintenance Engineer LGS
y
R. Moor
Superintendent QA Division
P. Pavlides
Director QA Engineering Department
N. McDermott
Manager - Public Information
R. Deneen
Director - Security
W. Shych
Chief Security Coordinator
W. Ullrich
Superintendent - Limerick 2 Project
'J.
Corcoran
E. Gibson
.
M. Roache
Site Emergency Planning Coordinator
W. Knapp
Corporate Director - Radioactive Waste
Manager Section
R. Kankus
Director, Emergency Preparedness Section
J. Ford
Superintendent Corporate to Chemistry Section
M. Cassada
Director Radiation Protection
R. Dubiel
Senior Health Physicist - Limerick
E. Firth
Training Coordinator - LGS
R. Bulmer
Superintendent Nuclear Training Section
G. Hunger, Jr.
Engineer-In-Charge - Nuclear Safety Section
_ _ - - _
_ _ _
-_
_ _ _ _ _ _ _ - .
-
-
_
. _ . . _ - _ - _ _ _ _ _ _ _ _ .
.-
.-_
_ - - _ _ _ _ _ _ - _ - _ - - - - _ _ _ - _ _ _ - _ _ _
O
2
.
R. Costagliola
Suptintendent Nuclear Station Section, Maintenance
Department
W. A. Texten
Supervising Engineer _ Nuclear Station Section
Maintenance Department
C. Reid
Senior Engineer - Mechanical Engineering
R. Lonabaugh
Fire Marshall - Safety Division
!
)
9
-
,
_ _ _ _ - .