ML20235H527

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-424/87-54 on 870908-11.No Violations or Deviations Noted
ML20235H527
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 09/25/1987
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20235H529 List:
References
NUDOCS 8710010091
Download: ML20235H527 (2)


See also: IR 05000424/1987054

Text

- - -_

__

_

---

. - - - - - - - - .

- - -

- - - - - - - - - - -----

-

OtaQ

N

-

.

(

SEP 2 51987

'

" .

i

Docket No. 50-424

I

. License No. NPF-68

i

Georgia Power Company'Reilly

.

-

ATTN: Mr. James P. O

Senior Vice President-

Nuclear Operations

P.- 0. Box 4545

Atlanta, GA -30302

Gentlemen:

SUBJECT:

NRC INSPECTION' REPORT NO. 50-424/87-54

f

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

P. T. Burnett on -September 8-11, 1987.

The inspection included a review of

activities authorized for your Vogtle facility.

At the conclusion'of the

inspection, the findings were discussed with those members of your staff-

,

identified in the enclosed inspection report.

~

'

Areas examined during' the inspection are identified in the report.

Within

. these areas, the .' inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

q

1

Within the scope of the inspection, no violations 'or deviations were

'!

identified.

I

i

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

l

Title 10, Code of Federal- Regulations, a copy of this letter and its enclosure

'will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

%

8710010091 870925-

ADOCK 05000424

g *j Alan R. Herdt, Chief

PDR

PDR

T4

g

Engineering Branch

Di ision of Reactor Safety

i

' Enclosure:

NRC Inspection Report

cc w/ enc 1:

(See page 2)

I

l

.

!

i

I

^

M

. .. _ _ _ _ - _ _ . _ _ _ _ - _ _ .

._

-

4

, $EP 2 5 y

'

'

Georgia Power Company

2

.

cc w/ enc 1:

P. D. Rice, Vice President, Project

Director

C. W. Hayes, Vogtle Quality

Assurance Manager

. G. Bockhold, Jr. , General Manager,

Nuclear Operations

L. Gucwa, Manager, Nuclear Safety

and Licensing

J. A. Bailey, Project Licensing

Manager

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

J. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

M. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

Dr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

G. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

bec w/ enc 1:

E. Reis, OGC

M. Miller, NRR

M. Sinkule, RII

' NRC Resident Inspector

'

Document Control Desk

State of Georgia

I

RII

RII

RII

P&6Fnett: 1b

FJane

MSinkule

09//8/87

094p/87

09/y)/87

~

i

_

-

--

--

)