j T Commonwealth Edison I
/ Ore First N1tional Plaza, Chicago, Illinois m
l
\\
7 Address R ply to: Post Office Sox 767
d Chicago, Illinois 60690 0767 l
July 8, 1987 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 i
Subj ect. : Zion Nuclear Power Station Units 1 and 2 Emergency Response Facilities NRC Docket Nos. 50-295 and 50-304
Reference:
January 19, 1987 letter from P.C. LeBlond to H.R. Denton Gentlemen:
The referenced letter outlined the human factors findings regarding Zion Station's Technical Support Center (TSC).
It also stated that resolution of these findings did not appear to be practical within the constraints of the existing TSC's size and committed to providing a construction schedule for a new TSC by July 1, 1987. This schedule is discussed below.
Enclosed with this letter is a copy of a report containing a description of the proposed TSC, implementation schedule, and 'otal cost estimate. This report contains the following estimated duration schedule; Engineering Award process: 4 Month 5, Engineering / Design duration: 9 Months Construction duration: '3 Months Total elapsed duration: 22 Months Commonwealth Edison Company will promptly advise the NRC Staff of any changes in these estimates.
If any further questions arise, please direct them to this office.
Very truly yours, P.C. LeBlond Nuclear Licensing Administrator Enclosure cc:
J. A. Norris - NRR Resident Inspector - Zion Regional Administrator - Region III 3272K 8707150128 870708 0 i)
ADOCK0500g5 f
PDR F
_9
' Unned Engineers.
Opus West it 312 960 9200
& Constructors Inc.
1011 Opus PlacJ FAX 318 960 2523 Downers Grove IL 60515 UnitedEngineers
& Constructors A BeyHeeen Company June 15, 1987 UE-8112.010-2 Mr. S. L. Oppegaard Commonwealth Edison Company P.O. Box 767 - SNED 35 FNW Chicago, Illinois 60690
Subject:
United Engineers & Constructors Project No. 8112.010 Zion Nuclear Generating Station Technical Support Center DRAFT REPORT & TOTAL INSTALLED COST ESTIMATE
Reference:
Letter from R. I. Patel to S. L. Oppegaard Dated May 29, 1987 SCOPE OF WORK DOCUMENT 1
Dear Mr. Oppegaard:
We have prepared a description and Total Installed Cost Estimate for the
-Technical Support Center which you are evaluating for installation at Zion Station. A draft of our report and backup material is attached for your i
review and coment. We are prepared to assist you in your review and evaluation of this estimate, if you require further assistance.
I inferred from our telephone conversation of last week that we can anticipate receiving your comments within the next few days so that we will be able to issue the final Report before the end of June, 1987.
If you have any questions or if you require any further assistance, please contact either Mr. Al Dufault or me at (312) 960-9200. We will be happy to respond expeditiously.
Very truly yours, uw R. E. Basso Manager - Midwest Operations l
I
Enclosure:
Zion Nuclear Generating Station Technical Support Center Total Installed Cost Estimate 4032M