Submits Revs to Responses to NRC Design Validation Program Insps.Open Items Re Civil/Structural Issues Completed. Mechanical/Fluid Sys Issues,Except for F-33 & F-37,will Be Completed by 890626
ML20235H389
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/15/1989
From: William Cahill, Walker R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-89059, NUDOCS 8902230585
Download: ML20235H389 (2)


Text

_ __._-

V: y.,, y

..t

'. l[ j 4

y

~7

Log #-TXX-89059 File #'10130 i

IR 87-19/87-15:

9 7UELECTRIC -

IR 87-37/87-28.

IR 88-29/88-25 Ref # 10CFR2.201(a)

W.J.CahW.

Executive Vke President pgy(yg(y }$, 39gg U. S. Nuclear Regulatory Commission Attn: Document' Control Desk-Washington,.D. C.

20555

SUBJECT:

. COMANCHE: PEAK STEAM ELECTRIC STATION'(CPSES)

DOCKET N05. 50-445 AND 50-446 REVISIONS REGARDING RESPONSES TO NRC DESIGN VALIDATION PROGRAM INSPECTIONS-4

REFERENCE:

1 TV Electric letter TXX--88303,' dated March 21, 1988 2.TU Electric letter TXX-88332, dated April 11, 1988

'3 TV Electric letter TXX-88413, dated May 27, 1988 4 TV Electric letter TXX-88510, dated June 20, 1988 5 TV Electric letter TXX-88601, dated August. 24, 1988-

.6 ?TV Electric letter.TXX-88875, dated December 21, 1988 r

7 TV Electric letter TXX-89057, dated February 1,1989 Gentlemen:

References (1) through (5) scheduled'a number of commitments with respect to open items to be implemented by December 31, 1988.

Reference (7) stated that-a revised schedule would be submitted by February 15, 1989.

The open items previously scheduled for' December 31, 1988 were:

o Mechanical / Fluid Systems - F-1, 13, 28, 33, 36, and 37.

o Civil Structural - C/S-25, 26, 28, 33, and 55.

The Mechanical / Fluid Systems open item' identified as F-1 in reference (6) was changed to F-13 by reference (7). However, both are applicable and included in this status report.

10 <

he 4

\\

400 North Olive Street LB 81. Dallas, Texas 75201

o TxX-89059 February 15, 1989 Page 2 of 2 All of the open items previously scheduled for December 31, 1988, have been completed with the exception of F-33 and F-37 which will be completed by June 26, 1989.

Documentation for the completed items is available for your review.

Sincerely, WNS,u & Erb-

&A William J. Cahill, Jr.

By:

60, '.N, #[

4 R. D., Walker Manager Nuclear Licensing CBC/cbc c - Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) l l