Forwards Safety Insp Repts 50-454/87-12 & 50-455/87-11 on 870304-0630.No Violations Noted
ML20235H260
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/08/1987
From: Shafer D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20235H264 List:
References
NUDOCS 8707150074
Download: ML20235H260 (2)


See also: IR 05000454/1987012

Text

1

_,

JUL 0 81987

!

-

Docket No. 50-454

Docket No. 50-455  ;

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen: i

This refers to the routine safety inspection conducted by Mr. W. B. Grant.of

this office during the period March 4 through June 30, 1987, of activities

at Byron Nuclear Power Station, Units'1 and 2, authorized by NRC Operating

Licenses No. NPF-37 and No. NPF-66 and to the discussion of our findings with

Messrs. R. Querio, R. Ward and others at the conclusion of the inspection.

The enclosed copy.of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed.in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

~

moriginar signea by T A m emJr

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosure: Inspection Reports

No. 50-454/87012(DRSS); D

No. 50-455/87011(ORSS) Q

1

See Attached Distribution [J-

-

%

0"$b

B70715007A B7070B'

i$ R hf 1/Yt1

$!

In1

Ih -\E

H }r

$DR ADock 05o00434

PDR-

'

.

Commonwealth Edison Company 2

g g i

l

Distribution

cc w/ enclosure:

D. L. Farrar, Director

l

of Nuclear Licensing j

V. I. Schlosser, Project Manager i

Gunner Sorensen, Site Project

-Superintendent i

R. E. Querio, Plant Manager

DCS/RSB (RIDS) i

Licensing Fee Management Branch i

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood i

D. W. Cassel, Jr. , Esq.

l Richard Hubbard

J. W. McCaffrey, Chief, Public

'

Utilities Division

Diane Chavez, DAARE/ SAFE  ;

Steve Lewis, OGC '

L. 01shan, NRR LPM

H. S. Taylor, Quality Assurance

Division

!

l

I

l

l

l

l l

- _ - - - - - - _ - - _ - - - - - -