ML20235G876

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec 5.4.2.2.a,reflecting Revised Proposed Min Inventory of 150 Gallons Per Fuel Storage Tank
ML20235G876
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 02/15/1989
From:
DAIRYLAND POWER COOPERATIVE
To:
Shared Package
ML20235G866 List:
References
NUDOCS 8902230395
Download: ML20235G876 (2)


Text

_ _ _ - - - - _ - .. . _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

  • -o v.

FIRE PROTECTION FIRE SUPPRESSION WATER SYSTEM SURVEILLANCE - (Cont'd)

2. Verifying that the high pressure pump starts to maintain the Fire Suppression Water System pressure 2 60 psig.
e. At least once per 3 years by performing a flow test of the system in accordance with Chapter 5, Section 11, of the Fire Protection Handbook, 14th Edition, published by the National Fire Protection Association.

5.4.2.2 Each fire pump diesel engine shall be demonstrated OPERABLE:

a. At least once per 31 days by verifying that the fuel storage tank for each diesel contains at least 150 gallons of fuel.
b. At least once per 31 days by starting the diesel from ambient conditions and operating for at least 20 minutes.
c. At least once per 92 days by verifying that a sample of diesel fuel from within three inches of the bottom of each fuel storage tank is within acceptable limits specified in Table 1 of ASTM D975-81 for water and sediment, and or viscosity.
d. At least once per 18 months, by:
1. Subjecting the diesel to the annual inspection in accordance with its manufacturer's recommendations for the class of service, and
2. Verifying the diesel starts from ambient conditions on the auto-start signal and operates for 1 20 minutes while loaded i with the fire pump.

i s902230395 890215 9 4_26 DR AIJOCK 0500

37e

...4.

t

. s.

'i.h:!T S)*ST)'.MS 1

(Y,}-

^

y I, .*,1,1?NE II,1,A!:s !: ; Fot;! hi::4E11TS (Continued) t: . . . _. ..-....- . . - --

] e. At least once per 3 years by performing a flow test of the nystem in accordance wi th Chapter 5, Section 11, of the j}

rire Protcetion llandbook, loth Edition, published by the-

., 1:ntionn) Fire Protection Association. '

l

! . '; . 2.18.1. 2 Ench fire pump diesel engine shall be. demonstrated. -

! Oi'URA131,E :

L I At least once per 31 days by verifying tha he fuel s 0 p2

! a.

storage tank for A unit contains at least ' gallons gallons i of fuel.and for B unit contains at least M of fuel.

b. J. ! Ivast once per 31 days on a STAGGERED TEST BASIS by starting the diesel from ambient conditions and operating for at 1 cast 20 minutes. .
c. Ist Joas.L one e per 92 days by verifying that a sample of diese) fue) from within three inches of the bottom of each fuel storage tank contains < 0.051 by volume of water and

- rediment .ind satisfies the viscosity requirements of Table 1 of AST!4 D975-60 for standard #2 fuel oil.

i [

d. At least once per 30 months, during shutdown, by:

~

2. Subjecting the diesel to the annual inspection in necordance with procedures prepared in conjunction with its manufacturer's recommen'dations for the class of service, and
' . Veri fying the diesel starts from ambient conditions on l the auto-start signal and operates for > 20 minutes ~

while loaded with the fire pump.

l .

'l lE,2.18.1.3 r;ach fire pump diesel starting 24-volt battery bank and

, charger 5,ha]1.la demonstrated OPERABT,E:

I

a. At least once per 7 days by verifying that:

u

1. The electrolyte level of each battery is above the ki f platos, and The overall battary voltage is >, 24 volts.

! ~...

l

(})

.- , + . . /. . .

.c. . . .

l eI *

. l

{

' endeg nt !!c, 10

_____ .- __ . _ _ r.

b