ML20235G713
| ML20235G713 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 06/29/1987 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20235G715 | List: |
| References | |
| NUDOCS 8707140352 | |
| Download: ML20235G713 (3) | |
See also: IR 05000254/1987001
Text
.
_ _ _ _ _ - _ - - _ _
50 Cic
UMITED STATES
NUCLEAR REGULATORY COMMISSION
'g
P
g. [
S
REGION W
$-
f
799 ROOSEVELT ROAD
o
f
cLEN ELLYN, ILLINOIS 60137
.....
JUN 291987
,
Docket No. 50-154
Docket No. 50-265
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, Illinois 60690
Gentlemen:
Enclosed for your review, prior to our scheduled meeting on July 20, 1987, is
the SALP 6 Board Report for the Quad Cities Nuclear Power Station, Units 1 & 2,
covering the period October 1, 1985 through March 31, 1987.
Overall, your performance was found acceptable and directed toward safe
facility operation.
In addition, your overall performance has shown improve-
ment since the last SALP assessment period.
This was demonstrated by improved
ratings in two areas and an improving trend noted in a third area.
In accordance with NRC policy, I have reviewed the SALP Board Report and
accepted the Board's findings. We note the strides you have made at Quad Cities
in the areas of surveillance activities.
The fact that no missed surveillance
were identified during the assessment period at Quad Cities is noteworthy.
Other areas where notable efforts were made included plant housekeeping, where
management involvement effected positive results, and initiation of the Safety
System Functional Inspection concept at Quad Cities and other facilities.
The
Board noted an increase in the rate of LERs and personnel errors during this
SALP period and we draw this to your attention as a possible negative indicator
which you may wish to review.
Additional highlights of the report are set
forth below:
1.
The functional areas of Radiological Controls and Surveillance had
improved ratings from Category 2 in the previous SALP to Category 1 in
this SALP period.
8707140352 870629
.
ADOCK 05000254
,1
G
Z(\\
j/
\\/\\
_ - - - - - _ - _
_ _ - _ _ _
_
.
.
>
Commonwealth Edison Company
2 JUN 291987
2.
The functional areas of Security and Licensing Activities sustained
Category 1 ratings with continued high levels of performance in these
areas.
3.
The functional area of Outages received a Category 2. rating with an
improving trend indicating that, if the trend continues, a change in
performance level may result.
4.
The functional area of Fire Protection was not rated this assessment
period due to limited inspection in this area which the Board determined
was insufficient to support'a basis for evaluation.
5.
One decline in rating occurred in the functional area of Emergency
Preparedness which went from a Category 1 in the last SALP to a Category
2 this SALP period.
While you will have sufficient opportunity to present your comments at the
meeting on July 20, 1987, we also request written comments within 30 days
after the meeting.
Upon receipt, your comments will be evaluated and our
conclusion relative to them will be provided to you.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the SALP
Report will be placed in the NRC's Public Document Room.
No reply to this letter is required at this time; however, should you have
any questions concerning the SALP report, we would be pleased to discuss them
with you.
Sincerely.
O
dC>A JJ G
'
A. Bert Davis
Regional Administrator
Enclosure:
SALP 6 Board Report
No. 50-254/87001; 50-265/87001
See Attached Distribution
_ - _ - _ _
--
._
_
_-
-_
_
.
f
. .
-
JUN 2 91987
V
Commonwealth Edison Company
3
J
,
I
i
Distribution
cc w/ enclosure:
.
D. L. Farrar, Director
-
i
of Nuclear Licensing
'
R.- L. Bax, Plant Manager
i
DCS/RS81(RIDS)
l
Licensing Fee Management Branch
'
,
Resident Inspector, RIII
Richard Hubbard
,
'J. W. McCaffrey, Chief, Public
Utilities Division.
T. E. Murley,. Director, NRR
Regional Administrators
RI, RII, RIV, RV.
L. W. Zech, Chairman
J. K. Asselstine, Commissioner
F. M. Bernthal, Commissioner
T.=M. Roberts, Commissioner
K. M. Carr, Commissioner
T. Ross, NRR Project Manager
D. Muller, NRR Project Director
J. Lierberman, Director, Office
of Enforcement
D. E. Hickman, SALP Coordinator, NRR
RIII PRR
RIII SGA
State Liaison Officer, State
of Illinois
INP0
Section Chiefs &
Branch Chiefs