ML20235G627
| ML20235G627 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 07/08/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20235G630 | List: |
| References | |
| NUDOCS 8707140324 | |
| Download: ML20235G627 (2) | |
See also: IR 05000498/1987033
Text
_ _ - _ _ _ _ _
E'
JUL
6 1987
i
i
I
'
l
l
In Reply Refer To:
Dockets:
50-498/87-33
l
50-499/87-33
l
l
1
Houston Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
President, Nuclear
P. O. Box 1700
i
Houston, Texas
77001
Gentlemen:
This refers to the inspection conducted by Mr. H. D. Chaney of this office
during the period June 8-12, 1987, of activities authorized by NRC Construction
Permits CPPR-128 and CPPR-129 for Units 1 and 2 of the South Texas Project
Electrical Generating Station, and to the discussion of our findings with
Mr. W. H. Kinsey and other members of your staf f at the conclusion of the
inspection.
Areas examinea during the inspection involved the radiation protection program
including: management controls and organization, training and qualification,
external radiation exposure control, internal radiation exposure control,
respiratory protection, radiological posting program, radiological survey
"
program, ALARA and radiation work control program, radiation protection
instrumentation and calibration, radiation protection facilities, radiation
protection equipment and expendable supplies, radiation protection program
audits and reviews, and the post-accident sampling system. Within these areas,
the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the NRC
inspector. The inspection findings are documented in the enclosed inspection
report.
Within the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragra
of the er,cio d report.
C:RPB/C[$
RIV:FRPS
C:FRPS
C:RPSB
IDChaney dp M Murra
LAYandell
GLConstable
MEmerson
&/$ /87
/
4/% /87
(QfQ/87
7/ / /87
1/d,/87
C:RPB
JEGacjliardo
']/g/87
p707140324 s7ofoe,
fa
amcxoswoes
4
V
-
- - - - -
-
!
,
,
Houston Light ng & Power Company
-2-
~
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Y, acL/
-
J. E. Gagliardo,
hief
Reactor Projects Branch
Enclosure:
Appendix - NRC Inspection Report
50-498/87-33
50-499/87-33
cc w/ enclosure:
Houston Lighting & Power Company
ATTN:
M. Wisenberg, Manager,
Nuclear Licensing
P. O. Box 1700
Houston, Texas
77001
Houston Lighting & Power Company
ATTN: Gerald E. Vaughn, Vice President
Nuclear Operations
P. O. Box 1700
Houston, Texas
77001
Texas Radiation Control Program Director
bec to DMB (IE06)
bcc distrib. by RIV:
- RPB
DRSP
- RRI-OPS
R. D. Martin, RA
- RRI-CONST.
- Section Chief (RPB/C)
RPSB
- MIS System
- RIV File
- D. Weiss, RM/ALF
- RSTS Operator
R. Pirfo, OGC
- R. G. Taylor, RPB/C
- RSB
- Project Inspector, RPB
- R. Hall
NRR Project Manager
- H. D. Chaney
- B. Murray
R. L. Bangart
M. E. Emerson (2)
- w/766
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _
_ _ _ - _
__
. _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _
_