Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P2061999-10-26026 October 1999 Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified ML20217N3851999-10-20020 October 1999 Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr ML20217N2321999-10-15015 October 1999 Requests NRC Approval to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).Licensee Requests Extension to Specified Schedule for Implementing Updates to IST Program ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20217F8371999-10-0808 October 1999 Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV ML20217A5641999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Davis-Besse on 990901.Informs That NRC Plans to Conduct Addl Insps to Address Questions Raised by Issues Re Operator Errors & Failure to Commit to JOG Topical Rept on MOV Verification ML20212L0691999-09-30030 September 1999 Forwards,For Review & Comment,Copy of Preliminary ASP Analysis of Operational Condition Discovered at Unit 1 on 981014,as Reported in LER 346/98-011 ML20216J6701999-09-24024 September 1999 Forwards Post Examination Documentation for Written Operator Initial License Examination Administered at Davis-Besse Nuclear Power Station on 990920.Without Encls ML20212D3501999-09-21021 September 1999 Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006 05000346/LER-1998-001, Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached1999-09-0909 September 1999 Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached ML20216E5961999-09-0707 September 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20211P3001999-09-0707 September 1999 Forwards FEMA Transmitting FEMA Evaluation Rept for 990504 Emergency Preparedness Exercise at Davis-Besse Nuclear Power Plant.No Deficiencies Identified.One Area Requiring C/A & Two Planning Issues Identified ML20211K6681999-08-30030 August 1999 Forwards Copies of Certified Personal Qualification Statement - Licensee (NRC Form 398) for Operator Candidates Listed Below.Without Encls ML20211K6611999-08-30030 August 1999 Forwards Copies of Operator License Renewal Applications for Individuals Listed.Operators Have Successfully Completed Appropriate Operator Requalification Training Program at Dbnps.Without Encls ML20211K0951999-08-30030 August 1999 Forwards Request for Addl Info Re Fire & Seismic Analyses of IPEEE for Davis-Besse Nuclear Power Station,Unit 1. Response Requested within 60 Days ML20211H0201999-08-25025 August 1999 Forwards semi-annual FFD Rept for 990101-0630 for DBNPS, Unit 1,IAW 10CFR26.71(d) ML20211D1171999-08-20020 August 1999 Forwards Insp Rept 50-346/99-09 on 990623-0802.Violations Identified & Being Treated as Noncited Violations ML20211G3911999-08-20020 August 1999 Forwards Update to Estimated Info for Licensing Action Requests Through 010930,re Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20211J9201999-08-13013 August 1999 Urges NRC to Find Funds for Stockpiling Radiation Pills for Residents Living Near Plant ML20211B0161999-08-13013 August 1999 Forwards SE Accepting Evaluation of Second 10-year Interval Inservice Insp Program Request for Relief Numbers RR-A16, RR-A17 & RR-B9 for Plant,Unit 1 ML20210T1061999-08-12012 August 1999 Forwards Preliminary NRC Forms 398 & 396 for Listed Candidates,Per Operator License Exam Scheduled for Week of 990913.Encl Withheld ML20210S6071999-08-11011 August 1999 Provides Final Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Systems at Npps ML20210P8051999-08-0909 August 1999 Forwards Insp Rept 50-346/99-15 on 990712-16.No Violations Noted.However,Several Deficiencies Were Identified with Implementation of Remp,Which Collectively Indicated Need for Improved Oversight of Program IR 05000346/19980211999-08-0606 August 1999 Refers to NRC Insp Rept 50-346/98-21 Conducted on 980901- 990513 & Forwards Nov.Two Violations Identified Involving Failure to Maintain Design of Valve & Inadequate C/A for Degraded Condition Cited in Encl NOV 05000346/LER-1998-009, Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl1999-08-0606 August 1999 Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl ML20210H6101999-07-30030 July 1999 Informs That Region III Received Rev 21 to Various Portions of Davis-Besse Nuclear Power Station Emergency Plan.Revision Was Submitted Under Provisions of 10CFR50.54(q) in Apr 1999 ML20210H0491999-07-28028 July 1999 Forwards Application for Amend to License NPF-3,revising TS 3/4.7.5.1, Ultimate Heat Sink, to Allow Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G5521999-07-28028 July 1999 Provides Addl Response to 980923 OL Licensing Exam Rept 50-346/98-301 Re OL Exam Administered in Aug 1998.Results of Root Cause Investigation & Corrective Actions,Discussed ML20210G3831999-07-27027 July 1999 Forwards Application for Amend to NPF-3,changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20211P3071999-07-26026 July 1999 Forwards Final Rept for 990504 Biennial Radiological Emergency Preparedness Exercise for David-Besse Power Station.No Deficiencies Identified for Any Jurisdiction During Exercise ML20210G4391999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1, Safety Features Actuation Sys Instrumentation, & Associated Bases 3/4.3.1 & 3/4.3.2, Reactor Protection Sys & Safety Sys Instrumentation ML20210G7151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising TSs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrument - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs for Implementation of 10CFR50,App J,Option B for Type B & C Containment Leakage Rate Testing ML20210G3211999-07-26026 July 1999 Forwards Written OL Exam & Supporting Matl for Exam to Be Administered at DBNPS During Week of 990913.Listed Encls Withheld from Public Disclosure Until After Exam Complete ML20210C4381999-07-20020 July 1999 Forwards Insp Rept 50-346/99-08 on 990513-0622.Unidentified RCS Leak Approached TS Limit of 1 Gallon Per Minute Prior to Recently Completed Maint Outage.Three Violations of NRC Requirements Identified & Being Treated as NCVs ML20209G3681999-07-15015 July 1999 Advises That Info Submitted in & 990519 Affidavit Re Design & Licensing Rept,Davis-Besse,Unit 1 Cask Pit Rack Installation Project,Holtec Intl, HI-981933,marked Proprietary,Will Be Withheld from Public Disclosure ML20207H6401999-07-0909 July 1999 Discusses Closure of TAC MA0540 Re Util Responses to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Staff Has Revised Info in Rvid & Releasing It as Rvid Version 2 ML20209D1341999-07-0808 July 1999 Forwards Notice of Withdrawal of Application for Amend to Operating License.Proposed Change Would Have Modified Facility TSs Pertaining to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves 05000346/LER-1998-012, Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached1999-07-0707 July 1999 Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached ML20209C3981999-07-0101 July 1999 Responds to NRC Re Violations Noted in Insp Rept 50-346/98-21.Corrective Actions:Developed Rev to Boric Acid Control Program & Work Process Guideline on Plant Leakage ML20209B5821999-06-24024 June 1999 Provides Justification for Rev to Completion Date for One of Insp follow-up Items Cited in Insp Rept 50-346/98-03, Designated as Inspector follow-up Item 50-346/97-201-10 ML20196G1251999-06-23023 June 1999 Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196E5321999-06-17017 June 1999 Forwards Addl Info Re Relief Request RR-A16 to Support NRC Approval of Relief Request ML20195K2751999-06-16016 June 1999 Forwards Safety Evaluation Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 ML20195F9071999-06-10010 June 1999 Forwards Application for Amend to NPF-3,changing Tech Specs 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.7.6.1, Crevs ML20195F8851999-06-0707 June 1999 Withdraws 950929 License Amend Application,Proposing Mod to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves ML20207G0751999-06-0707 June 1999 Forwards Insp Rept 50-346/99-04 on 990323-0513.Violations Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy 1999-09-09
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARML20206H4511988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App U Documents.App U Documents Also Available in Pdr.App U Document Withheld (Ref FOIA Exemption 5) ML20207D1121988-07-0505 July 1988 Partial Response to FOIA Request for Documents.Forwards App M Documents.App L Documents Maintained in Pdr.Apps N & O Documents Partially & Totally Withheld,Respectively (Ref FOIA Exemption 5) ML20155K0211988-06-13013 June 1988 Partial Response to FOIA Request for Documents.Forwards App D Documents.App C Documents Available in Pdr.App E Documents Completely Withheld (Ref FOIA Exemption 5) ML20147C0801988-02-26026 February 1988 Final Response to FOIA Request for Records Re Davis-Besse Refueling Outage & Nrc/Util Meeting.Forwards App a Documents.Documents Available in PDR ML20236D7861987-10-27027 October 1987 Final Response to FOIA Request for Documents.App a Documents Completely Withheld (Ref FOIA Exemptions 5,6 & 7) IA-87-612, Final Response to FOIA Request for Documents.App a Documents Completely Withheld (Ref FOIA Exemptions 5,6 & 7)1987-10-27027 October 1987 Final Response to FOIA Request for Documents.App a Documents Completely Withheld (Ref FOIA Exemptions 5,6 & 7) ML20236D8191987-10-26026 October 1987 Final Response to FOIA Request for Rept Entitled, Pcaq 86-0663. Forwards App a Document.Document Also Available in PDR ML20235G5861987-09-28028 September 1987 Final Response to FOIA Request for Documents.App C Documents Encl & Available in PDR ML20235G6451987-09-25025 September 1987 Final Response to FOIA Request for Documents Re Reactor Trip Due to Loss of Feedwater.Forwards App D Documents.App C & D Documents Available in PDR ML20235B6911987-09-22022 September 1987 Partial Response to FOIA Request for Info Re Facility Event. App a Document Available in Pdr.App B Records Being Made Available in PDR & Forwarded.Records Requested Under FOIA 87-584 Also Pertinent to Current Request ML20235B9201987-09-22022 September 1987 Partial Response to FOIA Request for Documents Re Plant. Forwards Documents Listed in App B.Documents Listed in Apps a & B Available in PDR ML20236K0401987-08-0303 August 1987 Responds to Expressing Concerns Re Decision on Disposal of Waste,Per J Glenn Request.Addl Approvals Required by Util Based on Conclusion That Negligible Environ Hazard or Risk to Public Health Exists.W/O Stated Encl ML20214K9821987-05-27027 May 1987 Partial Response to FOIA Request for Documents Re Allegation of Employee Entering Facility Under Influence of Alcohol. Forwards App a & B Documents.App B Documents Partially Withheld (Ref FOIA Exemption 6).App a Documents Also in PDR ML20209H0531987-04-29029 April 1987 Partial Response to FOIA Request for Documents Re INPO Accreditation of Training Programs.Forwards App B Document. Document Also Available in PDR ML20212K3121987-01-16016 January 1987 Further Response to FOIA Request for Seven Categories of Records Re Radiation.App B,C,D & F Documents & One Document from App E Available in PDR IA-86-548, Responds to FOIA Request for Three Categories of Documents Re Deaths Resulting from Accidents at Chernobyl,Davis-Besse & Perry.Forwards App Documents.Documents Also Available in PDR1986-10-0606 October 1986 Responds to FOIA Request for Three Categories of Documents Re Deaths Resulting from Accidents at Chernobyl,Davis-Besse & Perry.Forwards App Documents.Documents Also Available in PDR ML20215D8551986-10-0606 October 1986 Responds to FOIA Request for Three Categories of Documents Re Deaths Resulting from Accidents at Chernobyl,Davis-Besse & Perry.Forwards App Documents.Documents Also Available in PDR ML20202E3771986-07-0202 July 1986 Partial Response to FOIA Requests Dtd 860203,10,17,24,0303, 10,17,24 & 31 for All Documents Generated or Prepared by V Stello.Forwards App a Documents.Documents Also Available in Pdr.App B Documents Addressed in Listed FOIAs ML20206P8151986-06-26026 June 1986 Responds to J Glenn Forwarding Jh Angel Re Ongoing Adjudicatory Hearing on Util Request to Dispose of Low Level Radwaste.Hearing Scheduled to Provide Public Opportunity to Make Statement.Served on 860630 ML20199B2861986-06-13013 June 1986 Discusses Greater Cleveland Boating Assoc 860409 Resolution Opposing Burial of Radioactive Sludge at Facility & Requesting That NRC Review Decision to Permit Burial.W/O Stated Encl.Served on 860616 ML20136E2811985-11-0404 November 1985 Further Response to FOIA Request for Documents Re Davis- Besse Plant.Documents Listed in App B Available in Pdr.Nrc Unable to Identify Documents Re Number 5 of Request IA-85-611, Further Response to FOIA Request for Documents Re Davis- Besse Plant.Documents Listed in App B Available in Pdr.Nrc Unable to Identify Documents Re Number 5 of Request1985-11-0404 November 1985 Further Response to FOIA Request for Documents Re Davis- Besse Plant.Documents Listed in App B Available in Pdr.Nrc Unable to Identify Documents Re Number 5 of Request ML20133D3571985-09-26026 September 1985 Partial Response to FOIA Request for Specified Documents Re Facility.App a Documents Available in Pdr.Notice of Charges & Procedures for Obtaining Records from PDR Encl.W/O Encl ML20134E1271985-08-0909 August 1985 Forwards NRC Investigative Rept Re 850609 Loss of Feedwater Event.Conclusions Will Be Used as Input to Decisions Re Restart.Supporting Technical Info Available in Lpdr.W/O Encl IA-85-445, Responds to FOIA Request for Vol III of Evaluation of Transient Behavior & Small RCS Breaks in 177 Fuel Assembly Plant, Re Facility.Document Available in PDR for Insp1985-08-0505 August 1985 Responds to FOIA Request for Vol III of Evaluation of Transient Behavior & Small RCS Breaks in 177 Fuel Assembly Plant, Re Facility.Document Available in PDR for Insp ML20134F7481985-08-0505 August 1985 Responds to FOIA Request for Vol III of Evaluation of Transient Behavior & Small RCS Breaks in 177 Fuel Assembly Plant, Re Facility.Document Available in PDR for Insp ML20137D3361985-07-22022 July 1985 Further Response to FOIA Request for Eight Categories of Documents Re Seismic Design & Earthquake Research.Fowards Documents Listed in Apps C & D.Documents Also Available in PDR ML20137S4891985-07-18018 July 1985 Responds to Encl 850708 Request for Hearing Re 850609 Event. No Proceeding for Plant in Progress.Ltr Will Be Referred to Staff for Further Response.Pertinent Correspondence Between NRC & Util Also Encl ML20125B1281979-10-11011 October 1979 Responds to T Hamrick Expressing Concern Re Decommissioning of Nuclear Power Plants.Forwards Info Included in Des.Also Forwards AEC Safety Evaluation of Piqua Decommissioning ML20062F5411978-12-14014 December 1978 Forwards Final Environ Statements,Ser,Pamphlet & Conference Paper Re Subj Facil in Response to 781004 Request to EPA 1988-07-05
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217P2061999-10-26026 October 1999 Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified ML20217N3851999-10-20020 October 1999 Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes ML20217F8371999-10-0808 October 1999 Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV ML20217A5641999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Davis-Besse on 990901.Informs That NRC Plans to Conduct Addl Insps to Address Questions Raised by Issues Re Operator Errors & Failure to Commit to JOG Topical Rept on MOV Verification ML20212L0691999-09-30030 September 1999 Forwards,For Review & Comment,Copy of Preliminary ASP Analysis of Operational Condition Discovered at Unit 1 on 981014,as Reported in LER 346/98-011 ML20212D3501999-09-21021 September 1999 Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006 ML20211P3001999-09-0707 September 1999 Forwards FEMA Transmitting FEMA Evaluation Rept for 990504 Emergency Preparedness Exercise at Davis-Besse Nuclear Power Plant.No Deficiencies Identified.One Area Requiring C/A & Two Planning Issues Identified ML20211K0951999-08-30030 August 1999 Forwards Request for Addl Info Re Fire & Seismic Analyses of IPEEE for Davis-Besse Nuclear Power Station,Unit 1. Response Requested within 60 Days ML20211D1171999-08-20020 August 1999 Forwards Insp Rept 50-346/99-09 on 990623-0802.Violations Identified & Being Treated as Noncited Violations ML20211B0161999-08-13013 August 1999 Forwards SE Accepting Evaluation of Second 10-year Interval Inservice Insp Program Request for Relief Numbers RR-A16, RR-A17 & RR-B9 for Plant,Unit 1 ML20210P8051999-08-0909 August 1999 Forwards Insp Rept 50-346/99-15 on 990712-16.No Violations Noted.However,Several Deficiencies Were Identified with Implementation of Remp,Which Collectively Indicated Need for Improved Oversight of Program IR 05000346/19980211999-08-0606 August 1999 Refers to NRC Insp Rept 50-346/98-21 Conducted on 980901- 990513 & Forwards Nov.Two Violations Identified Involving Failure to Maintain Design of Valve & Inadequate C/A for Degraded Condition Cited in Encl NOV ML20210H6101999-07-30030 July 1999 Informs That Region III Received Rev 21 to Various Portions of Davis-Besse Nuclear Power Station Emergency Plan.Revision Was Submitted Under Provisions of 10CFR50.54(q) in Apr 1999 ML20210C4381999-07-20020 July 1999 Forwards Insp Rept 50-346/99-08 on 990513-0622.Unidentified RCS Leak Approached TS Limit of 1 Gallon Per Minute Prior to Recently Completed Maint Outage.Three Violations of NRC Requirements Identified & Being Treated as NCVs ML20209G3681999-07-15015 July 1999 Advises That Info Submitted in & 990519 Affidavit Re Design & Licensing Rept,Davis-Besse,Unit 1 Cask Pit Rack Installation Project,Holtec Intl, HI-981933,marked Proprietary,Will Be Withheld from Public Disclosure ML20207H6401999-07-0909 July 1999 Discusses Closure of TAC MA0540 Re Util Responses to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Staff Has Revised Info in Rvid & Releasing It as Rvid Version 2 ML20209D1341999-07-0808 July 1999 Forwards Notice of Withdrawal of Application for Amend to Operating License.Proposed Change Would Have Modified Facility TSs Pertaining to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves ML20195K2751999-06-16016 June 1999 Forwards Safety Evaluation Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20207G0751999-06-0707 June 1999 Forwards Insp Rept 50-346/99-04 on 990323-0513.Violations Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207G0621999-06-0404 June 1999 Forwards Insp Rept 50-346/98-21 on 980901-1201 & 990425-0513.Violations Identified & Licensee Being Provided Opportunity to Either Respond to Violations within 30 Days or Inform NRC That LER Rept Already Contain Info Requested ML20207B8161999-05-25025 May 1999 Confirms Discussion Between Members of Staffs to Have Mgt Meeting on 990608 in Oak Harbor,Oh to Discuss Recent Performance at Davis-Besse as Described in Plant Performance Review ML20207B3141999-05-24024 May 1999 Informs That in September 1998,Region III Received Revision 20 to Various Portions of Davis-Besse Nuclear Power Station Emergency Plan.Rev Submitted Under Provisions of 10CFR50.54(q) ML20206T0881999-05-18018 May 1999 Confirms 990517 Telcon Between Lindsey & M Bielby Re Arrangements Made for Administration of Licensing Exam at Facility for Week of 990913 ML20206N5311999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Aj Mendiola Will Be Section Chief for Davis-Besse Npp.Organization Chart Encl ML20206H2291999-05-0707 May 1999 Forwards Proposed Change to Plant,Unit 1,TS Bases Section 2.2.1, Limiting Safety Sys Settings - Reactor Protection Sys Instrumentation Setpoints - Rc Pressure - Low,High & Pressure Temp ML20206B8171999-04-27027 April 1999 Forwards Insp Rept 50-346/99-05 on 990405-09.No Violations Noted.Purpose of Insp Was to Examine on-line Maint Risk Assessment Program Recently Implemented in Response to Maint Work Control Weaknesses ML20205G5681999-03-26026 March 1999 Advises of Completion of Plant Performance Review on 990202 to Develop Integrated Understanding of Safety Performance. Overall Performance of Plant Acceptable.Plant Issues Matrix & Insp Plan Encl ML20207G1701999-03-0505 March 1999 Forwards Insp Rept 50-346/99-01 on 990102-0212.No Violations Noted ML20207D4351999-02-25025 February 1999 Forwards Insp Rept 50-346/99-02 on 990202-05.No Violations Noted.Examples of Deficiencies with Station Procedures, Similar to Those Identified Through Staff self-assessments & in Previous NRC Insps,Were Noted IR 05000346/19960141999-02-17017 February 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-346/96-14 on 970225.Ack That Due to Plant Events,There Has Been Delay in Completion of C/As for Violation 50-346/96-14c ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20206S0811999-01-22022 January 1999 Forwards Insp Rept 50-346/98-18 on 981110-990102.No Violations Identified.Conduct of Activities at Davis-Besse Generally Characterized by Conservative Plant Operations, & Effective Engineering Involvement in Plant Issues ML20199H5821999-01-20020 January 1999 Forwards SE Re Ampacity Derating Issues Due to Application of Thermo-Lag Fire Barrier Matl at Plant ML20198E6821998-12-17017 December 1998 Forwards Insp Rept 50-346/98-20 on 981116-20.No Violations Noted.Implementation of Licensed Operator Requalification Program Was Generally Characterized by Safety Conscious Operations & Sound Evaluation of Operator Performance ML20198C9881998-12-15015 December 1998 Informs That as Part of NRC PRA Implementation Plan, Commission Assigned Two SRAs to Each Regional Ofc.Sras Will Routinely Assess Licensee Event Repts,Plant Event,Insp Findings & EAs from Risk Perspective ML20198B5391998-12-0909 December 1998 Forwards Insp Rept 50-346/98-17 on 980918-1109 & NOV Re Inadequate Maint Work Order Used by Electrician During Removal of Primary Water Storage Tank Temp Indicator ML20196G1621998-12-0303 December 1998 Submits Response to Request for TS Interpretation Re Surveillance Interval Extension Allowances ML20196H4411998-12-0303 December 1998 Confirms Plans to Hold Meeting on 981216 in Lisle,Il,To Discuss Recent Performance at Davis-Besse & Actions Being Implemented by Licensee ML20198B1511998-12-0202 December 1998 Forwards Insp Activity Plan for Next 6 Months & Plant Issues Matrix.Infor Provided to Minimize Resource Impact on Staff & to Allow for Scheduling Conflicts & Personnel Availability to Be Resolved in Advance of Inspector Arrival Onsite ML20196J5111998-12-0101 December 1998 Fowards Year 2000 Readiness Audit Rept,Which Documents Results of NRR Audit Conducted at Facility from 981027-29 ML20196D4371998-11-25025 November 1998 Discusses Concerns Re Announced Asset Transfer Between Firstenergy Corp & Duquesne Light Co ML20196C6491998-11-20020 November 1998 Forwards Insp Rept 50-346/98-19 on 981014-23.No Violations Noted.Inspectors Reviewed Circumstances Surrounding Events Leading Up to & Following Reactor Trip IR 05000346/19983011998-11-0909 November 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-346/98-301OL Issued on 980923.Effectiveness of C/A Will Be Reviewed Following Submittal of Root Cause Investigation Results ML20155J1471998-11-0303 November 1998 Informs That on 981007,NRC Administered GFE Section of Written Operator Licensing Exam to Employees of Facility. Exam Answer Key for Forms a & B,Grading Results & Individual Answer Sheets Encl.Without Encl ML20155B6641998-10-28028 October 1998 Forwards Safety Evaluation Re Request for Reduction in Commitment Changes in QA Program Matl Receipt Insp Process ML20154Q6711998-10-16016 October 1998 Forwards Insp Rept 50-346/98-15 on 980914-18.No Violations Noted.Emergency Preparedness Program Effectively Implemented During 980624 Tornado Event & Station Personnel Responded Well to Event ML20154Q5891998-10-14014 October 1998 Forwards Insp Rept 50-346/98-14 on 980808-0918.No Violations Noted.Online Safety Equipment Outages Were Performed Well & IAW Established Procedures ML20154H0241998-10-0606 October 1998 Discusses Arrangements Made During 980924 Telcon for Insp of Licensed Operator Requalification Program at Davis Besse Nuclear Power Station During Wk of 981116 ML20154D1801998-09-30030 September 1998 Forwards Insp Rept 50-346/98-16 on 980831-0904.No Violations Noted 1999-09-07
[Table view] |
Text
- - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - - - _ _
-. U.S. NUCLEAR REGULATORY COMMISSION NRc solA REQUEST NUMBER ($1 s** **%
\ ,
(0 1~ A - [f 7 $ YRESPONSE TYPE
! . RESPONSE TO FREEDOM OF N \ N^""^' I l" "
INFORMATION ACT (FOIA) REQUEST 3 SEP 2 81987 l
- DOCKET NUMSERLS) ur oppacaber i
REQUESTER '
M '
PART 1.-RECORDS RELEASED OR NOT LOCATED (See checked boxes)
No agency records subject to the request have been located.
No additonal agency records subject to the request have been located.
Agency records subject to the request that are identifed in Appendix are already available for public snspection and copying in the NRC Public Document Room, 1717 H Street, N W., Washington, DC.
Agency records subject to the request that are identified in Appendix b are being made available for public inspection and copying in the NRC Public Document Room,1717 H St eet, N W., Washington, DC, in a folder under this FOIA number and requester name.
The nonpropnetary version of the proposal (s) that you egreed to accept m a te6ephone conversation with a member of my staff is now being med availabs t)r public inar.actiG.1 and coying at the NRC Public Document Room,1717 H Street, N W., Washington. DC, m o tolder under the FOIA number and requester name.
Enclosed is information on how you may obtain eccess to and the charges for copying records placed in the NRC Public Document Room,1717 H Street, N.W., Washington, DC.
Agency records subsect to the request are enclosed. Any applicable charge for copies of the records provided and payment procedures are noted in the comments section.
Records subject to the request have been referred to another Federal agency (ies) for review and direct respor se to you.
Its vow of NRC's response to this request, no furtner action is being taken on appeal letter dated PART ll.A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain informaton in the requested records is beitwJ withheld from public disclosure pursuant to the FOIA exemptions described in and for the reasons stated in Part II, sec-tons B, C, and D. Any released portons of the documents for which only part of the record a being withheld are being made available for public inspection and copying in the NRC Publec Document Room,1717 H Street, N W., Washington, DC, in a folder under the FOlA number and requester name Comments 8709300115 870928 WE -584 PDR Si A
' TIRE DIRECTOR. Dev St N Of RU E$ SAND RECORDS M# * /
- /c s
' r .;
1 NRC FORM 464 LPart H is es) j
_ ._ J
4 Re: F01 A- '37-584 '
.. APPENDIX C i
RECORDS MAINTAINED IN THE PDR UNDER THE ABOVE REQUEST NUMBER NUMBER DATE DESCRIPTION
- 1. 12/30/86 ' Preliminary Notification of Event or Unusual Occurrence--
PHO-III-86-156 (1 page) -
- 2. 12/31/86 Davis-Besse Daily Status (4 pages) f
}
}
j i
1 j
l 1
i l
l i
l
WTOL-TV .
730 N Surnmit Sueet i D.EDO V :: m s!! n is !'
cosmos steadusens corporadon fBfEDOM of gypfQ)T$
.. REQ ST i 7-Ss August 31, 1987 g Freedom of Information Officer U.S. Nuclear Regulatory Comission Washington, D.C. 20555 FREEDOM OF INFORMATION REQUEST f
Dear Sir or Madam:
This is a request for information under the provisions of the Freedom of l Information Act as amended (5 U.S.C. 552).
I request a complete and thorough search of all filing systems for all records or documents maintained by your agency concerning the operations and operating condicion of the Davis-Besse nuclear p6wer plant on Dec. 31, 1986.
These documents include, but are not limited to, daily operations reports ,
maintenance reports for Dec. 31, 1986, and any other documents that would describe the operations or operating condition of the plant on Dec. 31, 1986.
If daily documents are not available, then I would request that you send me documents ft- the month of December,1986, containing the type of operating information descrioed above.
I am making this request in my capacity as a news reporter for WTOL-TV.
I hope to use the requested information for a news story.
If all or any part of this request is denied, please cite the specific exemption (s) which you think justifies your refusal to release the information and inform me of your agency's administrative appeal procedures available to me under the law.
If there are any fees for searching for, or copying, the records I have requested, please supply the records without informing me if the fees do not exceed $50.00.
As you know, the Act permits you to reduce or waive the fees "if disclosure of the information is in the public interest becauee it is likely to contribute significantly to public understanding of the operations or activities of the government and is not primarily in the comercial interest of the requester."
I believe that my request fits this category, and I therefore ask that you waive any fees.
I would appreciate your handling this request as quickly as possible, and I look forward to hearing from you within 10 working days , as the, law atipulates.
Sincerely, Bruce Maxwell'
~L&Q f(.f) ]- .
PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURREhCE--PNO-III-86-156 30, 1986 Date This or preliminary public interest notification significance. constitutes EARLY notice of events of POSSIBLE safety The information is as initially received without O ver* ~~ nation or evaluation, and is basically all that is known by the Region III s t. n this date.
Facility: Toledo Edison Company Licensee Emergency Classification:
M )~{ W e1 N h'P1 h t Notification of an Unusual Event Cat H or, 0H 43449 Alert Site Area Emergency Docket No. 50-346 - General Emergency X Not Applicable ,
ubject: SMALL STEAM LEAKS I
G W U i M I E {Es f oT Dgimber 3071986, with the plant at 40 percent power, the icensee discovered a small steam lbak in one of four main steam lines. The leak was in j
connection between the main steam line and a capped instrument line. A similar leak ,
as then found in an adjacent main steam line. At 2:15 a.m. the licensee began to reduce !
ow3r to 10 percent in preparation for tripping the turbine, t 4:28 a.m. one approximately 1/2ofinch the in instrument diameter. lines broke off, leaving a hole in the main steam line At 6:12 a.m., the turbine was manually tripped as ;
lanned; the reactor remained at 10 percent power with steam being directed to the condenser. I ha licensee plans to replace the instrument lines in all four steam lines with plugs and to ondastructively ach steam pipe. test four small drain lines which are located near the instrument lines in i
The cause of the cracking is thought to be vibration which occurs when the li s operated at less than 50 percent power.
ha licensee estimates that the repairs will take about 24 hourn. The reactor will be 1
intained at low power levels. I h2 State of Ohio will be notified.
egion III (Chicago) was notified of this event by the Resident Inspector about 8:15 a.m.
EST). The problem is not required to be reported by the licensee. This infonnation is urrant as of 11 a.m. (EST), December 30, 1986.
ONTAC .
hI //
Te n /G. Wrigh FT 88-5543 FTS 388-5 95 DISTRIBUTION:
. St. ED0 NRR E/W Willste airman Zech PA Mail: ADM:DM8
, IE HMSS DOT:Trans only
. Roberts ELD OIA RES
. Asselstine .
. Bernthal AE0D NRC Ops Ctr -8 [,M
. Carr RS SPhA Regional Offices CY INP08*/$ NSAC3"/[
RIII Resident ffice N7gg74 F
Licensee: .2.lp (Corp. Office - Reactor Lic. Only) /
dL/ /
g Region III g Q- p g % -d L@ . Rev. November 1986
_ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ ~ _ _ _ _ _ .- - _m