Discusses Operational Team Assessment of Selected Operating Crews Scheduled to Begin Wk of 871019,per 870902 Telcon. Assessment Objective Is to Evaluate Effectiveness of Util Shift Manager & Operating Crew Team Training
ML20235G048
Person / Time
Site: Peach Bottom  
Issue date: 09/21/1987
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Gallagher J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 8709290417
Download: ML20235G048 (2)


Text

1 7C8 0

SEP 21 Ei Docket Nos.

50-277 50-278 Philadelphia Electric Company ATTN: Mr. J. W. Gallagher Vice President Nuclear Operations 2301 Market Street Philadelphia, Pennsylvania 19101 l

l Gentlemen:

SUBJECT:

OPERATIONAL TEAM ASSESSMENT During a September 2, 1987, telephone conversation between Mr. R. Gallo of this office, and Mr.

G.

Leitch of your staff, arrangements were made for an operational assessment of selected Peach Bottom operating crews.

The assess-ment is scheduled to begin the week of October 19, 1987, and will include all crews expected to be on-shift for the restart of Peach Bottom. The assessment will measure overall crew interaction and will include use of the Peach Bottom procedures and Technical Specifications.

Communication, and the capability of the Shift Manager to supervise the operating crew will also be assessed.

l The objective of the operational assessment is to evaluate the effectiveness of l

the PECO Shift Manager training and the operating crew team training provided l

by you to ensure their readiness to function effectively during preparation of l

the plant for startup and power ascension.

To accomplish this objective, the NRC will conduct an independent review of the operational readiness of the crews concurrently with PECO's shift team training.

In order to adequately prepare for this assessment, it will be necessary for the facility to furnish the NRC with the evaluation objectives to be used by

PECO, specific performance objectives developed for the team training exercises, a description of the capabilities of the Limerick simulator when using Peach Bottom procedures including a simulator malfunction list, and simulator scenarios suitable for the Limerick simulator.

The NRC will select the scenarios for use during the concurrent assessment from those furnished.

Mr. Leitch has been advised of our reference material requirements and where they are to be sent.

Thank you for your consideration in this matter.

If you have any questions on the assessment process, please contact Mr.

R.

Gallo, Chief, Operations Branch at 215-337-5291.

Sincerely, 92%{ ho 7

Original Signed Bn p

William T. Russell Regional Administrator 0FFICIAL RECORD COPY OL EVAL PEC0 - 0001.0.0 09/17/87

.c t:

Philadelphia Electric Company 2

cc.w/ enc 1:

Dickinson M. Smith, Manager, Peach Bottom Atomic Power Station John S. Kemper, Senior Vice President, Engineering and Production-Thomas S. Shaw, Jr.,. Vice President, Production Troy B. - Conner, Jr., Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric G.-Leitch, Nuclear Generation Manager Eugene.J. Bradley, Esquire, Assistant General Counsel Raymond L. Hovis,. Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations W. M. Alden, Engineer in Charge, Licensing Section Dnris Poulsen, Secretary of Harford County Council R. Andrews, Training Manager Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center'(NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania bec w/ enc 1:

Region I Docket Room (with concurrences)

Section Chief, DRP D. Lange Examiner OL File Chief,.0LB, NRR RI:DRS[

WM copy RI:DRS Q

RI RI, S

NRR 9 P

I Lange lie We inger GatHo Hannon e

Johnston 9/h7 9/)7/87

)

9/

87 9/

7 9/ /87 9/4/87 9////87 RA[ll DRA Allan Russe l

1 9/ /87 9/ /87 0FFICIAL RECORD COPY OL EVAL PECO - 0002.0.0 09/16/87 i

_ - _ - _ _ _ _ -