Text
_ _ _ _ _ - _ - _ _ _ _ - _ _ _ - _
July 1,1987 l
i DI3TRIBUTION
! Docket Filea NRC PDR Docket No. 50-285 Local"PDR' PD4 Reading D. - Crutchfield F. Schroeder 3
Mr. R. L. Andrew J. Calvo P. Noonan Division Manager - Nuclear Production A. Bournia 0GC-Bethesda Omaha Public Power District E. Jordan J. Partlow 1623 Harney Street ACRS (10)
PD4 Plant File Omaha, Nebraska 68102 I
Dear Mr. Andrews:
l
SUBJECT:
GENERIC LETTER 83-28, ITEMS 4.2.3 and 4.2.4 - LIFE TESTING AND PERIODIC REPLACEMENT OF BREAKERS (TAC NO. 53911)'
RE:
FORT CALHOUN STATION, UNIT 1 The staff and its consultants, Idaho National Engineering Laboratory, have completed their review of Item 4.2 Reactor Trip System Reliability (Preventing l
Maintenance and Surveillance Program for Reactor Trip Breakers) for the Fort Calhoun Station, Unit No. 1.
Our review was based on your November 4, 1983 i
l letter in response to Generic Letter 83-23 entitled, " Required Actions Based on Generic Implications of Salem ATWS Events."
Based upon our review of the above referenced submittal, we find that Item 4.2 of Generic Letter 83-28 is not applicable to the Fort Calhoun Station, Unit No. 1, because the plant uses contactors in the Reactor Trip System rather than breakers.
We, therefore, find your response to be acceptable.
Our safety evaluation is enclosed.
Sincerely, 1
1 l S Anthony Bournia, Project Manager Project Directorate - IV Division of Reactor. Projects - III IV V and Special Projects
Enclosure:
As Stated I
cc w/ enclosure:
See next page b-PNooa/(/tys PD-G PD-4 PI-n ABournia VJACalvo Oy/' 87 06/2 /87 0$/0l/86
/
h
[
K P
Mr. R. L. Andrews Fort Calhoun Station Omaha Public Power District Unit No. 1 1
l CC:
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D.C.
20036 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Mr. Phillip Harrell, Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations C-E Power Systems 7910 Woodmont Avenue Bethesda, Maryland 20814 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Harold Borchert, Director Division of Radiological Health l
Department of Health 301 Centennial Mall, South j
P.O. Box 95007 Lincoln, Nebraska 68509 j
l W. G. Gates, Manager I
Fort Calhoun Station P. O. Box 399 l
Fort Calhoun, Nebraska 68023 l
l 4
j