ML20235E168

From kanterella
Jump to navigation Jump to search
Advises That Issue Date for Insp Repts 50-327/87-37 & 50-328/87-37 Inadvertently Omitted on Copy Provided to Util. Cover Ltr,Dtd 870909,encl
ML20235E168
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/21/1987
From: Zech G
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8709280004
Download: ML20235E168 (2)


See also: IR 05000327/1987037

Text

- _ - - - . _ .

(3 f /

~

ll

'

f

,

)

i

)

!

.{

L/ ;

v

!

September 21, 1987

'

Docket Nos. 50-327, 50-328

USNRC-Db

License Nos. OPR-77, DPR-79

19n SEP 25 A 9 tih

.

1

Tennessee Valley Authority

j

LATTN: Mr. S. A. White

l

Manager of Nuclear Power

,

'

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Gentlemen:

.

l

SUBJECT: NOTICE OF VIOLATION

l

(NRC INSPECTION REPORT NOS. 50-327/87-37 AND 50-328/87-37)

!

i

Please note that the issue date of the subject report was inadvertently

'

omitted on the copy provided to you.

The issue date for this report was

September 9, 1987.

A dated copy of the cover letter is enclosed for update

of your files.

We appreciate your cooperation in this matter.

i

i

Sincerely,

)

(original signed by K. Barr)

Gary G. Zech, Assistant Director,

Inspection Programs

TVA Projects Division

Office of Special Projects

Enclosure:

Cover Letter dated September 9,1987,

for NRC Inspection Report Nos.

50-327, 328/87-37

cc w/ encl:

M. L. Abercrombie, Site Director

!

Sequoyah Nuclear Plant

Jr A. Kirkebo, Director,

Nuclear Engineering

tRT L. Gridley, Director

Nuclear Safety and Licensing

dh R. Harding, Site Licensing

M

v7(.anagerA. Ippolito, TVA Nuclear Regulatory

Consultant

]

)

8709280004 870921 E

PDR

ADOCK 05000327-

O

PDR

I

SEcl

._

_

________-_-Q

'

/

rx

t)

V

Tennessee Valley Authority

2

September 21, 1987

bec w/ encl:

J. N. Grace, RII

J.- G. Keppler, OSP

& D. Ebneter, OSP

t V A. Zwolinski, OSP

X D. Liaw, OSP

M D. Richardson, OSP

& R. Connelly, 01A

K. P. Barr, OSP/RII

F. McCoy, OSP/RII

R. Carroll

OSP/RII

J. Brady, OSP/RII

d4RC Resident Inspector

l

NRC Document Control Desk

State of Tennessee

l

RI

RI

RI .

'IJ

II

7

hatson:btm

MS ymlock

CJu 16n

FMcCoy

KB rr

'9/}g87

9//4/87

9/ /87

9/ /87

9/ /87

j


.------___j

.

.#

'

p.# REGuy[o[

UNITED STATES

,

'NUCLEhR REGULATORY COMMisslON

I

)

(

j

REGION il

y

-

n

$

,j

101 MARIETTA STRE ET, N.W.

I

'*

AT L ANT A, GEORGI A 30323

\\...../

i

September 9. 1987'

j

i

Docket Nos. 50-327, 50-328

,

License Nos. OPR-77, DPR-79

i

j

Tennessee Valley Authority

'

ATTN: Mr. S. A. White

l

l

Manager of Nuclear _ Power

'

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

)

Gentlemen:

SUBJECT: NOTICE OF VIOLAT' ~ 3

I

J

(NRC INSPECTION ..c ORT NOS. 50-327/87-37 AND 50-328/87-37)

l

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

j

L. Watson on June 15-July 31,1987.

The inspection included a review of

!

activities authorized for your Sequoyah facility.

At the conclusion of the

!

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

i

'

1

Areas examined during the inspection are identified in the report.

Within

j

these areas, the inspection consisted of selective examinations of procedures

!

and representative records, interviews with personnel, and observation of

i

activities in progress.

I

1

The inspection findings indicate that certain activities appeared to violate

I

!

NRC requirements.

The violation, references to pertinent requirements, and

l

elements to be included in your response are described in the enclosed ilotice

I

of Violation.

l

The enclosed Inspection Report documents an oral commitment (see paragraph 5)

{

made by a licensee representative and discussed in the exit interview.

If your .;

i

understanding of this commitment differs from the report statements, please

i

. ,

inform this office promptly.

l

l

.

l

In summary, the conclusions of this inspection reflect that, with the

- l

completion of corrective action programs for restart and establishment of the

details of the Maintenance Instruction Enhancement Program, the established

maintenance program will support restart of Sequoyah Unit 2.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

)

Title 10. Code of Federal Regulations, a copy of this letter and its enclosures

1

will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procediires 'of'the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

g , y_ ,

pg a :%

a

t

!

i

i

1

(~)

O)

-

i

1

'

/

G!

'</

Tennessee Valley Authority

2

September 9, 1987

j

i

Should you have any questions concerning this letter, please contact us.

1

-l

Sincerely,

j

i

f

.

'

Gary G. Zech, Assistant Director,.

Inspection Programs

TVA Projects Division

1

Office of Special Projects

)

1

Enclosures:

I

1.

Nctice of Violation

1

2.

NRC Inspection Report

!

cc w/encis:

H. L. Abercrombie, Site Director

i

Sequoyah Nuclear Plant

{

J. A. Kirkebo, Director,

Nuclear Engineering

R. L. Gridley, Director

Nuclear Safety and Licensing

M. R. Harding, Site Licensing

Manager

j

i

&

I

T

.)

!

. _ .

.. ._.

O