Forwards Safety Evaluation of Util 870527 & 0824 Safety Analysis Info Re Onsite Storage of Liguid Hydrogen & Oxygen for Implementation of Hydrogen Water Chemistry.Permanent Hydrogen Water Installation Acceptable
ML20235D109
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/22/1987
From: Martin R
Office of Nuclear Reactor Regulation
To: Bauer E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20235D112 List:
References
TAC-64537, TAC-64538, NUDOCS 8709250121
Download: ML20235D109 (3)


Text

I September 22, 1987 Docket Nos.: 50-277/50-278 Mr. Edward G. Bauer, Jr.

Vice President and General Counsel Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101  ;

Dear Mr. Bauer:

SUBJECT:

STORAGE OF HYDROGEN AND OXYGEN ONSITE FOR IMPLEMENTATION OF HYDROGEN WATER CHEMISTRY (TAC N05. 64537 AND 64538)

RE: Peach Bottom Atomic Power Station, Units 2 and 3 By letters dated May 27 and August 24, 1987, the Philadelphia Electric Company submitted safety analysis information for the storage of liquid hydrogen and oxygen onsite and other information related to the implementation of hydrogen water chemistry at the Peach Bottom Atomic Power Station (PBAPS).

We have evaluated this information and find that the permanent hydrogen water installation is acceptable. Our evaluation is provided in the enclosure. A related amendment application dealing with the setpoint for the main steamline radiation monitor is being reviewed separately.

Sincerely,

/s/

l((2$0h$

p

$ Oh PDR h Robert E. Martin, Project Manager Project Directorate I-2 Division of Reactor Projects

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION:

Docket File ~ RMar tin /RClark NRC:PDR/LPDR OGC-Bethesda PDI-2 Reading EJordan SVarga/BBoger JPartlow Wautler ACRS(10)

M0'Brien FWitt p p @JH PDI-2/D Ma'rtin:c]a WButler v

/2)/87 / zJ87 '

e o

  1. ps Rtc UNITED STATES i9 -!" ' o,j NUCLEAR REGULATORY COMMISSION g  : E WASHINGTON, D. C. 20555

%n . . . . . $ September 22, 1987 Docket Nos.: 50-277/50-278 Mr. Edward G. Bauer, Jr.

Vice President and General Counsel Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101

Dear Mr. Bauer:

SUBJECT:

STORAGE OF HYDROGEN AND OXYGEN ONSITE FOR IMPLEMENTATION OF HYDR 0 GEN WATER CHEMISTRY (TAC N05. 64537 AND 64538)

RE: Peach Bottom Atomic Power Station, Units 2 and 3 By letters dated May 27 and August 24, 1987, the Philadelphia Electric Company submitted safety analysis information for the storage of liquid hydrogen and oxygen onsite and other information related to the implementation of hydrogen water chemistry at the Peach Bottom Atomic Power Station (PBAPS).

We have evaluated this information and find that the permanent hydrogen water installation is acceptable. Our evaluation is provided in the enclosure. A related amendment application dealing with the setpoint for the main steamline radiation monitor is being reviewed separately.

Sincerely, kC/)?ada Robert E. Martin, Project Manager Project Directorate I-2 Division of Reactor Projects

Enclosure:

As stated cc w/ enclosure:

See next page

n.

Mr. E. G. Bauer, Jr. Peach Bottom Atomic Power Station, Philadelphia Electric Company Units 2 and 3 cc:

Troy B. Conner, Jr. , Esq. Mr. R. A. Heiss, Coordinator 1747 Pennsylvania Avenue, N.W. Pennsylvania State Clearinghouse Washington, D.C. 20006 Governor's Office of State Planning and Development Philadelphia Electric Company _ P. O. Box 1323 ATTN: Mr. D. M. Smith, Manager Harrisburg, Pennsylvania 17120 Peach Bottom Atomic Power Station Route 1, Box 208 Mr. Thomas M. Gerusky, Directnr Delta, Pennsylvania 17314 Bureau of Radiation Protection Pennsylvania Department of Mr.-J. W. Gallagher, Vice President Environmental Resources Nuclear Operations P.O. Box 2063 Philadelphia Electric Company Harrisburg, Pennsylvania ?7120 2301 Market Street Philadelphia, Pennsylvania 19201 Mr. Albert R. Steel, Chairman J Board of Supervisors l Mr. W. M. Alden Peach Bottom Township Engineer-In-Charge-Licensing R. D. #1 Philadelphia Electric Company Delta, Pennsylvania _17314 2301 Market Street Philadelphia, Pennsylvania 19101 Mr. Gary Mock P.O. Box 09181 Morgan J. Morris, III Columbus, Ohio 43209 General Manager - Operating Services Atlantic Electric Mr. Thomas S. Shaw, Jr.

P. O. Box 1500 Vice President Production 1199 Black Horse Pike Delmarva Power and Light Company Pleasantville, New Jersey 08232 800 King Street Wilmington, Delaware 19899 Resident Inspector U. S. Nuclear Regulatory Commission Mr. Tom Magette Peach Bottom Atomic Power Station Power Plant Research Program P. O. Box 399 Department of Natural Resources Delta, Pennsylvania 17314 B-3 Tawes State Office Building Regional Administrator Annapolis, Maryland 21401 U. S. Nuclear Regulatory Commission 631 Park Avenue Mr. Roland Fletcher King of Prussia, Pennsylvania 19406 Department of Environment 201 -est Preston Street Baltimore, Maryland 21201 l

1