ML20235C004
| ML20235C004 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 09/17/1987 |
| From: | Forney W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20235C005 | List: |
| References | |
| NUDOCS 8709240317 | |
| Download: ML20235C004 (2) | |
See also: IR 05000483/1987025
Text
_
__ _ ___ __- - ___ _ __
. _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _
_
_
__ _ - _
-
%
p 5
,
SEP 171987
Docket No. 50-483
Union Electric Company
ATTN: Mr. Donald F. Schnell
Vice President - Nuclear
Post Office Box 149 - Mail Code 400
St. Louis, M0 63166
Gentlemen:
This refers to the special safety inspection conducted by Mr. B. H. Little
of this office on August 12 through 21, 1987, of activities at Callaway Plant,
Unit 1, authorized by NRC Operating License No. NPF-30 and to the discussion
of our findings with Mr. J. D. Blosser and others of your staff at the
.
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination _of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice. This violation appears
to be a result of inadequate reviews of surveillance ~ instructions for unreviewed
safety questions as required by 10 CFR 50.59. While the effect on the safety
of the unit was low due to the very short duration of the violation the
significance of. this is increased by the failure of subsequent reviews of a-
surveillance procedure to identify an unreviewed safety question. A written
response is required and in your response you should document your determina-
tion of the cause for the inadequacy of-your reviews and the corrective
l
actions taken.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
l
this letter, the enclosures, and your response to this letter will be placed
'
in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
50r.1 1nal Signed by L L. y m n
4
,
8709240317 870917
l
ADOCK 05000403
G
'
W. L. Forney, Chief
Reactor Projects Branch 1
Enclosures:
1.
2.
Inspection Report
No. 50-483/87026(DRP)
,h
p
-See Attached Distribution
^^
RIII
g RIII
R' II;
RIII +
t
j
Lerch/jp
H,ind
y
FornefA
\\
'
j
g#
DY
_
_
__ . _ _ _ _
_ _ _ _ _ - _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _
..
%
Union Electric Company
2
SEP 1719T1
Distribution
cc w/ enclosures:
. G. L. Randolph, General
Manager, Nuclear Operations
A. P. Neuhalfen, Manager,
Quality Assurance
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Technical Support Section.-DRP-RIII
'
Region IV
Resident Inspector, Wolf Creek
K. Drey
Chris R. Rogers, P. E.
Utility Division, Missouri
Public Service Commission
SNVPPS
_ _ - _ _ _