Forwards Safety Insp Rept 50-483/87-25 on 870812-21 & Notice of Violation
ML20235C004
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/17/1987
From: Forney W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20235C005 List:
References
NUDOCS 8709240317
Download: ML20235C004 (2)


See also: IR 05000483/1987025

Text

_

__ _ ___ __- - ___ _ __ . _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ __ _ - _ -

% p 5

,

SEP 171987

Docket No. 50-483

Union Electric Company

ATTN: Mr. Donald F. Schnell

Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, M0 63166

Gentlemen:

This refers to the special safety inspection conducted by Mr. B. H. Little

of this office on August 12 through 21, 1987, of activities at Callaway Plant,

Unit 1, authorized by NRC Operating License No. NPF-30 and to the discussion

of our findings with Mr. J. D. Blosser and others of your staff at the .

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination _of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice. This violation appears

to be a result of inadequate reviews of surveillance ~ instructions for unreviewed

safety questions as required by 10 CFR 50.59. While the effect on the safety

of the unit was low due to the very short duration of the violation the

significance of. this is increased by the failure of subsequent reviews of a-

surveillance procedure to identify an unreviewed safety question. A written

response is required and in your response you should document your determina-

tion of the cause for the inadequacy of-your reviews and the corrective l

actions taken.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of l

this letter, the enclosures, and your response to this letter will be placed '

in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

4 1nal Signed by L L. y m n

50r.1

,

8709240317 870917

l

'

PDR ADOCK 05000403

G PDR

W. L. Forney, Chief

Reactor Projects Branch 1

Enclosures:

1. Notice of Violation

2. Inspection Report

No. 50-483/87026(DRP)

-See Attached Distribution ^^ p

,h

RIII g RIII R' II; RIII + t j

Lerch/jp

'

H,ind j y FornefA \

g# DY

_

_ __ . _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _

..

%

Union Electric Company 2 SEP 1719T1

Distribution

cc w/ enclosures:

. G. L. Randolph, General

Manager, Nuclear Operations

A. P. Neuhalfen, Manager,

Quality Assurance

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

'

Technical Support Section.-DRP-RIII

Region IV

Resident Inspector, Wolf Creek

K. Drey

Chris R. Rogers, P. E.

Utility Division, Missouri

Public Service Commission

SNVPPS

_ _ - _ _ _