ML20235B504
| ML20235B504 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 09/18/1987 |
| From: | Martin R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| References | |
| NUDOCS 8709240125 | |
| Download: ML20235B504 (7) | |
Text
_ - _ _ _ - - _ _ _ _ _ _ _ - _ - - _ - _ - _ _ _ _
E
.: w.y _
f.
SEP 181987 In Reply Refer'To:
Docket: 50-498-50-499 Houston Lighting & Power Company L
-ATTN:
J. H. Goldberg, Group Vice l-President, Nuclear l
P. O. Box 1700 Houston, Texas 77001 Gentlemen:
4 This-is to document the meeting and tour of the South Texas Project, Unit 1 on-July 28, 1987.
The primary' purpose was a visit by Chairman Zech to the South Texas Project.
No new commitments were made or agreements reached.
The licensee's list of attendees is attached, as are the agenda, the description of the briefing, and the details of the tour.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code'of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
Sincerely.
Ortginal 51gned by Paul S Check Robert D. Martin Regional Administrator
' Attachments:
(asstated) cc w/ attachments:
Houston Lighting & Power Company ATTN:
M. Wisenberg, Manager, Nuclear Licensing P. O. Box 1700 Houston, Texas 77001 Houston Lighting & Power Company ATTN:
Gerald E. Vaughn, Vice President Nuclear Operations 8709240125 070918
'P. O. Box 1700 PDR ADOCK 05000498 Houston.. Texas 77001 P
PDR Texas Radiation Control Program Director 4
i bec:
(see next page)
C b stable g' f
D:DRSPf k
/
PI f ardo p9//7/87 g87 JCallan a
n RG ay or:cs G
9//f /87 9/q/87 i 9/g1/87
Houston Lighting-&' Power !
Company bec.toDMB(IE45)
'bec distrib. by RIV:
RPB DRSP RRI-0PS R. D. Martin, RA RRI-CONST.
Section Chief (RPB/C)
RPSB MIS System RIV File D. Weiss, RM/ALF RSTS Operator R. Pirfo, 0GC R. G. Taylor, RPB/C RSB Project Inspector, RPB R. Hall P. Kadambi, NRR Project Manager
AGENDA FOR CHAIRMAN ZECH'S VISIT July 28, 1987 0800 Chairman Zech arrives at Training Center 0800 MANAGEMENT BRIEFING (Details in Attachment 2)
J. H. Goldberg Introduction D. D. Jordan Remarks J. H. Goldberg Project Overview Project Strengths Challenges G. E. Vaughn Plant Operations Operations Philosophy Staffing Training Performance Indicators Tour #1 of the Station (Details of Tour #1 and #2 in Attachment 3) 0830 - 0850 Training Center / Emergency Operations Facility Tour 0850 - 0900 Transit to Administration Building 0900 - 0910 Meet with operators in Administration Building (A1/A2) 0910 - 0945 Control Room 0945 - 1000 Fuel Handling Building:
Post Accident Sampling System / Fueling Operations.
1000 - 1020 Reactor Containment Building 1020 - 1100 Secondary Chemistry Lab Tour and address Chemists 1100 - 1200 Closing Remarks in Administration Building (A1/A2) 1200 - 1230 Lunch l
l
s Attachmsnt'2 i
. MANAGEMENT BRIEFING 0800:- 0830 1.
Introductory remarks Jerry Coldberg 2.
Historical perspective ' Don Jordan o
Project background
-o
-Turnaround.(1980-1982) o.
Management involvement 3.
Project Overview - Jerry Goldberg o'
Project Strengths -
Commitment to excellence-
-. Design Emphasis on quality Licensee and NRC relationship Fitness for duty.
SAFETEAM On site nuclear support o
Challenges
.First nuclear project Recruit and retain highly; skilled personnel Develop technical independence Security 4.
Plant Operations
- Gerald Vaughn Operations Philosophy o
Management priorities Strategy for excellence Commitment to professionalism
- Use of industry operating experience o
Staffing Total
- Operations experience o
Training Accreditation ~ status Simulator utilization NRC' license exam results o
Performance Indicators Industry, NRC and STP i
L I.
Attachmant 3 I
g
Page 1 of 2 Tour #1 Details 0830 - 0850 Training Center Speak with instructors at each stop Classrooms l
Simulator Elec Shop I & C Shop Mech Shop Chem Lab Emergency Operations Facility Overview talk Communications Space Allocations Capability of Facility 0850 - 0900 Van to Admin Building 0900 - 0910 Admin Building (Al/A2)
Chairman Zech to address Operators 0910 - 0945 Control Room Time for Chairman Zech to talk with operators on watch 0945 - 1000 Fuel Handling Building - Operating Deck Post Accident Sampling System Fuel Load Crew present Fuel pools Mention Emergency Core Cooling Systems in lower elevation 1000 - 1020 Reactor Containment Building - Operating Deck Reduced number of whip restraints Residual Heat Removal in containment Rapid refueling 1020 - 1050 Van from east entrance of Mechanical Auxiliary Building to Secondary Chemistry Lab Secondary Chemistry Lab Chemistry Facilities Secondary Improvements Chairman Zech to address chemists 1050 - 1100 Van to Admin Building 1100 - 1200 Exit Remarks 1200 1230 Lunch l
f l
=
{
-e-
'S Attachmant 3 Page 2 of 2-Tour #2 Details 0830 - 0840
' Van to Admin Building 0850 - 0900 Convene in A1/A2 0900 - 0910 Admin Building (A1/A2)
Chairman Zech to address Operators 0910 - 0930 Security.
Perimeter to ECW structure 0930 - 1000 TGB Grade elevation to Secondary Chemistry Lab 2.
Secondary Chemistry Lab Chemistry. Facilities Secondary Improvements 1000'. 1010 TGB 55' Level Tour 1010 - 1045 Catwalk from TGB to MEAB Across MEAB to RCB, tour RGB
~1045 - 1055 Return to Admin Building / Rejoin First Tour group 1100 1200 Exit Remarks
- 1200 - 1230 Lunch
3
- **l "
k.
ATTENDEES.AT CHAIRMAN ZECH'S ENTRANCE & EXIT July 28, 1987 Chief Executive Officer D. D.' Jordan J. H. Goldberg
- Group Vice President, Nuclear G. E.,Vaughn Vice President, Nuclear Plant Operations.
General Manager, Nuclear Assurance J. E. Geiger l
W. H. Kinsey Plant Manager, South Texas Project
.J. T. Westermeier-General Manager, South Texas Project General Manager, Nuclear Safety Review Board S.'L. Rosen.
Special Assistant to Group Vice President, R. W. Chewning Nuclear Manager, Unit 1 Operations Support S. M. Dew M. R. Wisenburg Manager, Engineering and Licensing R.
A.~ Frazar
. Manager, Emergency Preparedness D. J. Cody
- Manager, Nuclear Training A. O. Hill Manager, Nuclear Security Plant Engineering Manager G. L. Parkey M. A. Ludwig Maintenance Manager M. E. Smith Unit'l Outage Manager J. W. Loesch
- Plant Operations Manager Chemical Operations and-Analysis Manager T. E. Underwood Health Physics Manager G.
L.' Jarvela D. L. Smith Manager, Administrative Services J. N. Bailey
. Principal Engineer, Houston Licensing Entrance in, Training Center at 8:00 a.m.
Exit in Administration Building at 11:00 a.m.
The NRC is expecting to have the following present:
L. W. Zech G.'L. Constable C. E. Johnson J. M. Montgomery D. R. Carpenter N. P. Kadambi T. P. Gwynn R. D. Martin Visitors Escort Tour Group 1 L. W. Zech W. H. Kinsey J. M. Montgomery T. P. Gwynn D. R. Carpenter Tour Group 2 R, D. Martin D. D. Jordan
-G. L. Constable C. R. Johnson J. H. Goldberg N. P. Kadambi G. E. Vaughn K.
Buchorn S. M. Dew other interested M. R. Wisenburg Parties
_ _