ML20235A311

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/87-46 & 50-457/87-47 on 871207,16 & 17.No Violations Noted
ML20235A311
Person / Time
Site: Braidwood  
Issue date: 01/06/1988
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20235A313 List:
References
NUDOCS 8801120194
Download: ML20235A311 (2)


See also: IR 05000456/1987046

Text

_ _ - _

.

'

-

.

JAN

6 1988

i

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

3

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Dr. R. 8. Holtzman of

this office on December 7, 16, and 17, 1987 of activities at Braidwood Nuclear

Generating Station, Units 1 and 2, authorized by NRC Operating License No.

NPF-59 and NRC Construction Permit No. CPPR-133, and to the discussion of our

findings with Mr. D. O'Brien and others of your staff at the conclusion of the

inspection.

A telephone conversation was held with Mr. R. James on December 21,

1987.

'

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original cigned by W.D. Shef="

llk11$0h$ $!00bI56 '

Emergency Preparedness and

W. D. Shafer, Chief

PDR

G

Radiological Protection Branch

Enclosure: Inspection Reports

No. 50-456/87046(DRSS);

No. 50-457/87047(DRSS)

V

See Attached Distribution

(

,

E

\\\\

RI I

RIII

RI

III

Ho t man bl

Schumacher

b

d

s

,

1

,

n

_ _ _ _ _ - - _ _ _ _ _ _ _ - - _ - _ _ _ - - . - _ _ _ _ _ _ - - _ _ _ - - _

i

-

.

i

)

3

Conimonwealth Edison Company

2

JAN

6 1989 '

Distribution

cc w/ enclosure:

T. J. Maiman, Vice President,

PWR Operations

D. Butterfield, Nuclear

Licensing Manager

M. Wallace, Manager of Projects

D. Shamblin, Project Manager

W. Vahle, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr., Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

G. Berry, OGC

J. Stevens, NRR

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

The Honorable Ivan W. Smith, ASLB

The Honorable Gary J. Edles, ASLAP

The Honorable Dr. W. Reed Johnson, ASLAP

The Honorable Christine N. Kohl, ASLAP

l

!

_ _ _ _ _ _ _ _ _ -