ML20234F525

From kanterella
Jump to navigation Jump to search
Forwards Maint Insp Team Insp Rept 50-346/87-30 on 871102-06 as Followup to 870906 Reactor Trip & Subsequent Equipment Problems.No Violations Noted
ML20234F525
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/05/1988
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
Shared Package
ML20234F527 List:
References
NUDOCS 8801110507
Download: ML20234F525 (2)


See also: IR 05000346/1987030

Text

{{#Wiki_filter:_ -

.'~

gd ' 8 .. JAN 5 1989 Docket No. 50-346 Toledo Edison Company ATTN: Mr. Donald Shelton Vice President Nuclear Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen: The enclosed report refers to a special onsite review by a NRC Maintenance Inspection Team on November 2-6, 1987, as a followup to the reactor trip and subsequent equipment problems which occurred at the Davis-Besse Nuclear Power Station on September 6, 1987. The inspection was performed to evaluate the material condition of the plant and the status of the maintenance workload. The report identifies four selected systems and their associated maintenance backlog which were inspected. Within the areas, the inspection consisted of a review of representative records, system walkdowns, and interviews with personnel. No violations of NRC requirements were identified during the course of this inspection. In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will be placed in the NRC Public Document Room. We will gladly discuss any questions you have regarding the Team's assessment and conclusions. Sincerely, ORIGINAL SIGNED DY C. E. NOBTf UN Charles E. Norelius, Director Division of Reactor Projects Enclosure: Maintenance t Inspection Team Report ( No. 50-346/87030 - e See Attached Distribution y1 r RIII RIII R II III III e RIII h g' I ' tiller N Tft on s D a ette lde nd g. k ] /( W k2 12-{2d l71 &\\Y

  1. N

8801110507 880105 PDR ADOCK 05000346 G PDR _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ - - - - - _ - - _ _ - -

- , . . . , .: ,. Toledo Edison Company 2 sL4N 5 1928 Distribution cc w/ enclosure: L. Storz, Plant Manager DCD/DCB (RIDS) Licensing Fee Management Branch Resident Inspector, RIII Harold W. Kohn, Ohio EPA James W. Harris, State of Ohio Robert M. Quillin, Ohio Department of Health State of Ohio, Public Utilities Commission l F. Miraglia, NRR I D. Crutchfield, NRR G. Holohan, NRR M. Virgilio, NRR E. E. Rossi, NRR I A. DeAgazio, NRR E. Jordan, AE0D W. Lanning, AE0D R. Cooper, ED0 W. Kane, RI L. Reyes, RII J. Callan, RIV D. Kirsch, RV 1 l l l l l , l

C_____________________________.________.___ _ .. b }}