ML20234F278

From kanterella
Jump to navigation Jump to search
Forwards Sanitized Version of Ofc of Investigations Case Rept 1-85-019, Peach Bottom Atomic Power Station:Alleged Threats to Employees to Prevent Disclosure of Possible Overexposure to Nrc. W/Tl Harrison 870625 Release Memo
ML20234F278
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/22/1986
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20234F281 List:
References
NUDOCS 8707080163
Download: ML20234F278 (4)


Text

,,_.m ,_ . - _ , .u.2: . .-. . - ww - - - - -

6 Docket Nos. 50-277 82SEP 19e 50-278 Philadelphia Electric Company ATTN: Mr. S. L. Daltreff Vice President Electric Production 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:

Subject:

Investigation No. 50-278/1-85-019 Enclosed is a Report of Investigation concerning alleged threats to employees to prevent disclosure of possible overexposure information to the NRC. The investigation sought to determine if the employment of a Bartlett Nuclear Inc.

(BNI), contract Senior Health Physicist (HP) was terminated at the Peach Bottom

, Atomic Power Station (PBApS) as a result of his engaging in a protected acti-vity. A second objective of this investigation was to determine if the BNI HP was " blackballed" following his termination from PBAPS when he attempted to l gain employment at another nuclear facility. The investigation disclosed that the BNI HP did have legitimate concerns stemming from an incident which took place in the PBAPS, Unit 3, recombiner offgas tunnel on March 1,1985. A summary of the investigation was provided to you by letter dated May 20, 1986 and an enforcement conference was held with your staff on May 30, 1986. At the time of this enforcement conference there was a question of whether or not i you had all the facts needed to fully respond to the safety concerns of the NRC. i l Accordingly, the investigative report and its exhibits are being provided at l this time. ( l l

l

' When you have reviewed the attached report and are prepared to discuss its l

findings please contact us for the purpose of scheduling a second enforcement conference.

In accordance with 10CFR 2.790(a), a copy of this letter and the enclosure >

will be placed in the NRC Public Document Room unless you notify this office j by telephone, within ten days of the date of this letter and submit written i i

application to withhold information contained therein within thirty days of i the date of this letter. Such application must be consistent with the  !

requirements of 2.790(b)(1). The telephone notification of your intent to  !

request withholding, or any request for an extension of the 10 day period which you believe necessary, should be made to the Supervisor, Files, Mail and l Records, USNRC Region I, at (215) 337-5223.

1 l

0 0 7 0

0FFICIAL RECORD COPY INV PB - 0001.0.0 09/17/86 0l

. / . c, . .~ ,_.. .. _ - .;.. .a ; : e .... .a: n_.... .. ; .- . m....u a, a , s ., .aJ

~

. )

Philadelphia Electric Co. 2 22 SEP 1986 Your cooperation with us in this matter is appreciated.

Sincerely, I

a,..

z__. . .

. _ . w sso William F. Kane, Director Division of Reactor Projects j

Attachments: As stated l S. Fleischmann, Manager, Peach Bottom Atomic Power Station l

M ohn S. Kemper, Vice President, Engineering and Research (Without Report) l

/ Troy B. Conner, Jr., Esquire i

/W. H. Hirst, Director, Joint Generation Projects Department.

Atlantic Electric (Without Report)

/G. Leitch, Superintendent Nuclear Generation Division $

{

fEugene J. Bradley, Esquire, Assistant General Counsel (Without Report) aymond L. Hovis, Esquire (Without Report) J homas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

. M. Alden, Engineer in Charge, Licensing Section (Without Report)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

)

/jRC Resident Inspector i

/ Commonwealth of pennsylvania bec w/out enc 1.

Region I Docket Room (with concurrences) anagement Assistant pfectionChief S . DRP

/ Robert J. Bores, DRSS

/C. White, OI d . Murley

/T. Martin

/ R. Gallo

/ P. Eselgroth I Sfs:. u P/wwoos coacueMuc.es /n RI y:RC s RI:DRP RI:DRS RI:01 R:

Eselgroth/emw Gallo White Gutierrez K 9/ /86 9/ /86 9/ /86 9/ /86 9/ti/86 OFFICIAL RECORD COPY INV PB - 0001.1.0 09/17/86 i

l

3; :. -- .- ;

.. .. T . .: s L .::a. J ; ., . . T.-. :.L. Q. . . . ;u ;;iu ..;L';G ;:LLL,;' ;

)

Philadelphia Electric Co. 2 CC*

R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station John Troy B.S.Conner, Kemper, Jr.Vice President, Engineering and Research{w @I N8

, Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electri(wirmar-G. Leitch, Superintendent Nuclear Generation Division Eugene J. Bradley, Esquire, ssistant General Counsel (Without Report)  %

Raymond L. Hovis, Esquire Thomas Magette, Power Plant rhtafr- M W. M. Alden. Engineer in Charge, iting,NuclearEvaluations(WithoutRep}

Licensing Section @tTvwT"/4/b$r ort)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC) i NRC Resident Inspector Commonwealth of Pennsylvania bec w/+eJ . k)]$ MA)C2-( Region I Docket Room (with concurrences)

Management Assistant Section Chief, DRP Rob 9rt J. Bores, DRSS C. White, 01 T. Marley T. Martin R. Gallo P. Eselgroth l

e emw

,, ,.. ,,a ,.. ,, .. ,

OFFICIAL RECORD COPY INV PB -

09/17/. 0002.0.0

gana2p UNITED STATES 9,, NUCLEAR REGULATORY COMMISSION lr i> REGION 1

j $st PAnn AvcNut
  • g
  • KING OF PnUSELA. PENNSYLVANIA 19406 June 25,1987 MEMORANDUM FOR: Donald H. Lanham, Chief, Document Control Section, Information Resources Management FROM: Thomas L. Harrison, Chief, Administrative Management Branch, Division of Resource Management and Administration

SUBJECT:

INVESTIGATION NO. 50-278/I 019 Request that the attached copy of Investigation No. 50/278 019 be placed in the NRC Public Document Room.

gh' homas L. Harrison, Chief Administrative Management Branch l Division of Resource Management l and Administration

Enclosure:

As stated 1

.i l

. _ _ _ _ _ - _ _ _ _ _ - _ - _ _ _