Forwards Safety Insp Rept 50-457/87-30 on 870921-1204.No Violation Noted
ML20234F252
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 12/31/1987
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20234F255 List:
References
NUDOCS 8801110396
Download: ML20234F252 (4)


See also: IR 05000457/1987030

Text

'

s

,

. , ,

?. '

DEC 311987

-

Docket No. 50-457

Commonwealth Edison Company.

ATTN:

Mr. Cordell Reed

Senior Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine . safety inspect' ion conducted by Mr. W. C. Liu of this

office on September 21 through December 4, 1987, of activities at the Braidwood

Station, Unit 2, authorized by NRC Construction Permit No. CPPR-133 and to the

.

discussion of our findings with Mr. E. Fitzpatrick and others of your staff at

the conclusion of the. inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspcction. consisted of.a-selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this-

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy'of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

g 3,d St=3 b7 U O'

""

J. J. Harrison, Chief-

Engineering Branch

Enclosure:

Inspection Report

No. 50-457/87030(DRS)

See Attached Distribution

8801110396 871231

ADOCK 0 % y4 7

DR

ye5

RIII

RI

RIII

II

,

/

els

nhoh'w

%1

  • y

ds

r ison

t kRC

t

aIvh1

?

\\

.,

/ /'

,

-

_ _

.

'

.

.

.

.

Commonwealth Edison Company

2

Distribution

cc w/ enclosure:

T. J. Maiman, Vice President,

PWR Operations

D. Butterfield, Nuclear

Licensing Manager

M. Wallace, Manager of Projects

D. Shamblin, Project Manager

W. Vahle, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

l

DCD/DCB (RIDS)

!

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

'

Resident Inspector, RIII Byron

D. W. Cassel, Jr. , Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

G. Berry, OGC

J Stevens, NRR

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

The Honorable Ivan W. Smith, ASLB

The Honorable Gary J. Edles, ASLAP

The Honorable Dr. W. Reed Johnson, ASLAP

The Honorable Christine N. Kohl, ASLAP

i

'

-

.

.

.

.

DEC 311987

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

i

Senior Vice President

{

Post Office Box 767

Chicago, IL 60690

Gentlemen:

l

This refers to the routine safety inspection conducted by Mr. W. C. Liu of this

office on September 21 through December 4, 1987, of activities at the Braidwood

Station, Unit 2, authorized by NRC Construction Permit No. CPPR-133 and to the

discussion of our findings with Mr. E. Fitzpatrick and others of your staff at

the conclusion of the inspection.

'

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

,

interviews with personnel,

i

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions, you have concerning this inspection.

Sincerely,

-

, g Q . f_ .! l" 5. O . C I

'

J. J. Harrison, Chief

Engineering Branch

Enclosure:

Inspection Report

No. 50-457/87030(DRS)

See Attached Distribution

]e5

RIII

RI

RIII

II

',f

b,

(*

i

du/Jpw

ielson

'y Hinds

rrison

NT

,1 \\v l@

t l~b\\ $\\

g hein

t

?

l

-

.

.

.

.

DEC 311487-

~

Commonwealth Edison Company

2

'

Distribution-

cc w/ enclosure:

T. J. Maiman, Vice President,

PWR Operations

D. Butterfield, Nuclear

Licensing Manager

M. Wallace, Manager of Projects

D. Shamblin, Project Manager

W. Vahle, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

'Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr., Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

G. Berry, OGC

J. Stevens,.NRR

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

'!

The Honorable Ivan W. Smith, ASLB

The Honorable Gary J. Edles, ASLAP

j

The Honorable Dr. W. Reed Johnson, ASLAP

l

The Honorable Christine N. Kohl, ASLAP

_ . _