TOLEDO
%s EDISON DONAt D C..SHELTCN v w m -Nue s Docket No. 50-346 W 818 " '388 License No. NPF-3 Serial No. 1465 December 31, 1987 i
United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555
Subject:
Procedure. Generation Package' Preview Schedule Gentleman:
Toledo Edison's response dated April 20, 1987, (Serial 1368) to NRC Draft Safety Evaluation Report of the Davis-Besse Procedure Generation Package (PGP) detailed reviews that would be performed and' enhancements made to our Emergency Operating Procedures (E0P).
The actions es described in our April 20, 1987 submittal:are as follows:
Perform a comparison of the Davis-Besse E0P with the requirements of the B&W generated Technical Basis Document-(TBD).
Feview the Davis-Besse E0P with the revised Writers Guide.
Enhance instructions to operators on the use of hot leg RTDs and incore T/C when. determining subcooling margin.
Enhance instructions to operators on the use of hot and coldeg.
RTDs and incore T/Cs.fcr the determination of natural circu1L_ ion.
Evaluate the use of S/G drains and' Tube Rupture Control Criteria.to
~
maintain the S/G 1evel below the main steam line connection during --
tube rupture.
These actions were originally projected to be completed for~early-1988-revisions. :However, many plant modifications are being implemented at Davis-Besse during the upcoming fifth refueling outage (RF05) scheduled to begin in February 1988. Major E0P changes will result from these modifications'and, combined with.the PGP revisions,Jare significant-changes 8801110343 871231 P
-/.'
l PDR ADOCK 05000346 0
P
-PDn a
1 THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE
- TOLEDOf OHIO 43652
-I Docket No. 50-346 License No. NPF-3 Serial No. 1465 Page 2 that will require validation and training at the B&W simulator in Lynchburg. As a result the review, approval, validation and training is I
now scheduled to be completed prior to startup from RF05. This schedule
]
has been discussed with Mr. A. W. DeAgazio of your staff.
l Very tr 3 yours, 4
t JS:bam cc: DB-1 Resident Inspector A. B. Davis, Regional Administrator A. W. DeAgazio 1
l L