|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062A2091990-10-11011 October 1990 Advises That 900926 Rev 27 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable.Plan Withheld (Ref 10CFR73.21) ML20062A2151990-10-11011 October 1990 Advises That 900926 Rev 7 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable for Inclusion in Plan ML20059M9461990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20247H8191989-09-13013 September 1989 Advises That 890823 Rev 22 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20246J5881989-08-29029 August 1989 Notifies That plant-specific Review of Vital Area Validation Issue for Plant Terminated.Issue Will Be Resolved on Generic Basis ML20248B7491989-07-31031 July 1989 Advises That 890711 Rev 5 to Guard Training & Qualification Plan Consistent w/10CFR50.54(p) & Acceptable for Inclusion Into Plan ML20248A1321989-07-28028 July 1989 Advises That 890711 Rev 21 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20245F7471989-04-25025 April 1989 Advises That 890327 Rev 20 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20248H7051989-03-29029 March 1989 Advises That 881213 & 890224 Revs 18 & 19 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20196D2161988-11-23023 November 1988 Advises That 880921 Rev 5 to Safeguards Contingency Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable IR 05000335/19880201988-11-0303 November 1988 Discusses Insp Repts 50-335/88-20 & 50-389/88-20 on 880803 & Forwards Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790 & 10CFR73.21) ML20206E6251988-11-0202 November 1988 Forwards Insp Repts 50-335/88-23 & 50-389/88-23 on 880925-30.No Violations or Deviations Noted ML20205Q0861988-10-31031 October 1988 Advises That 880921 Rev 17 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable. Changes Requiring Further Clarification Withheld ML20206E7491988-10-31031 October 1988 Advises That Most Changes in Rev 17 to Physical Security Plan,Transmitted by Consistent W/Provisions of 10CFR50.54(p) & Acceptable.Changes Requiring Clarification Delineated in Encl.Encl Withheld (Ref 10CFR73.21) ML20155J3501988-10-19019 October 1988 Advises That 880912 Rev 4 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable IR 05000335/19880101988-10-10010 October 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-335/88-10 ML20154R5091988-09-21021 September 1988 Advises That 880917 Rev 16 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20154E6871988-09-0909 September 1988 Confirms 880906 Enforcement Conference Re Inattentiveness of Guard Posted to Control Access to Vital Area.List of Attendees,Summary & Handout Encl.Encls Withheld (Ref 10CFR2.790(d) & 10CFR73.21) ML20151Y6791988-08-19019 August 1988 Forwards Insp Repts 50-335/88-20 & 50-389/88-20 on 880803. Violations Noted in Rept Under Consideration for Escalated Enforcement Action.Enforcement Conference Scheduled for 880906 ML20151C1721988-07-0707 July 1988 Advises That 880623 Rev 15 to Physical Security Plan Meets Requirements of 10CFR50.54(p) & Acceptable ML20151C1991988-07-0707 July 1988 Advises That Revised Page to Rev 13 to Physical Security Plan Transmitted by Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20195E2131988-06-15015 June 1988 Forwards Request for Addl Info Re Util 880214 Request to Use Instrumented Insp Technique.Response Requested within 45 Days of Ltr Date.Full Response Schedule within 30 Days of Ltr Date Requested If Unable to Provide Full Response ML20196A8091988-06-14014 June 1988 Forwards Insp Repts 50-335/88-11 & 50-389/88-11 on 880523-26.No Violations or Deviations Noted ML20195C6191988-06-10010 June 1988 Forwards Insp Repts 50-335/88-12 & 50-389/88-12 on 880516-20.No Violations or Deviations Noted IR 05000335/19880021988-05-10010 May 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-335/88-02 & 50-389/88-02.Corrective Actions Will Be Examined During Future Insps ML20153F4461988-05-0404 May 1988 Advises That 880411 Rev 14 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20151V8251988-04-27027 April 1988 Advises That 880307 Rev 13 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable.Encl Withheld Per 10CFR73.21.Corrected Plan Pages Re Intake Canal Intrusion Detection Sys Requested,Per 880310 Conference ML20196G9391988-02-29029 February 1988 Advises That 880127 Rev 11-07 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable. Page Submitted W/Rev Also Addressed Rev 11-1 Re Compensatory Measures at Intake Canal.Rev Not Received in Region ML20237D1351987-12-16016 December 1987 Advises That 871123 Submittal of Rept Describing Change to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20237D5701987-12-12012 December 1987 Forwards Safety Evaluation Granting Util 861029 & 870121 Requests for Relief from Various Exam Requirements of ASME Boiler & Pressure Vessel Code,Section XI IR 05000335/19870191987-11-19019 November 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-335/87-19 & 50-389/87-18.Response Meets Requirements of Radiological Emergency Plan & Implementing Procedures ML20235J2441987-09-25025 September 1987 Forwards Insp Repts 50-335/87-19 & 50-389/87-18 on 870825-0904.No Violations or Deviations Noted.Response Stating Actions Planned or Taken to Correct Exercise Weaknesses Requested within 45 Days of Ltr Date ML20235A9941987-09-0909 September 1987 Advises That Change to Physical Security Plan,Transmitted on 870526 Unacceptable Under Provisions of 10CFR50.54(p). Change Downgrades Vital Equipment & Decreases Effectiveness of Plan.Application for Amend Required to Pursue Matter ML20235Y1871987-07-21021 July 1987 Requests Addl Info Re Util 860515,1013 & 31 Responses to IE Bulletin 85-003, Motor Operated Valve Common Mode Failures During Plant Transient Due to Improper Switch Settings. Response Requested within 30 Days of Ltr Date ML20234E6981987-06-25025 June 1987 Confirms Arrangements for Operator & Senior Operator Licensing Requalification Exams Scheduled for Wk of 870928. Encl Ref Matl Requested by 870724 in Order to Meet Scheduled Exam Date ML20216C4461987-06-24024 June 1987 Ack Receipt of Transmitting 870325 Rev to Physical Security Plan,Deleting Certain Plant Equipment from Vital Equipment List Currently Under Review by NRC ML20215K8661987-06-22022 June 1987 Forwards Exam Rept 50-335/OL-87-01 of Exams Administered on 870420-22 ML20214M1261987-05-21021 May 1987 Forwards SER Supporting Util 831110 & 850618 Responses to Generic Ltr 83-28,Item 2.1 (Part 2) Re Establishment of Interface W/Either NSSS or Vendors of Each Component of Reactor Trip Sys.Contractor Evaluation Rept Also Encl ML20206E2921987-04-0303 April 1987 Requests Cooperation in Region II Participation in Upcoming Emergency Exercise,Including Full Response by Base Team & Partial Participation of Site Team in Test of Incident Response Plan.Approx 16 Regional Personnel Will Participate ML20205P4881987-03-25025 March 1987 Advises That 850915 Rev 16 to Radiological Emergency Plan Consistent W/Provisions of 10CFR50.47(b) & App E to 10CFR50 & Acceptable ML20205B9321987-03-20020 March 1987 Forwards Insp Repts 50-335/87-02 & 50-389/87-02 on 870217- 26.No Violations or Deviations Noted ML20207T7721987-02-27027 February 1987 Forwards Insp Repts 50-335/87-01 & 50-389/87-01 on 870113- 0207.No Violations or Deviations Noted ML20211H2211987-02-17017 February 1987 Forwards Exam Rept 50-335/OL-86-02 on 861117 & Util 861203 Comments on Exam ML20211G4031987-02-14014 February 1987 Forwards Safety Evaluation & EGG-NTA-7463, Reactor Trip Sys Reliability..., Supporting Response to Generic Ltr 83-28,Item 4.5.2 Re Periodic on-line Testing of Reactor Trip Sys.Plant Designed to Permit on-line Testing IR 05000335/19860251987-01-27027 January 1987 Forwards Info Re Contractor Employee Concerns of Alleged Poor Procedure for Welder Certification & Discriminatory Release from Plant,Documented in Insp Repts 50-335/86-25 & 50-389/86-24.Statement Withheld (Ref 10CFR2.790) ML20210E0231987-01-26026 January 1987 Forwards Insp Repts 50-335/86-27 & 50-389/86-26 on 861216- 870112.No Violations or Deviations Noted ML20210D5141987-01-26026 January 1987 Advises That Written & Oral Operator Licensing Exams Scheduled for Wk of 870420,per Telcon Between J Spodick & B Dean.Requests Selected Ref Matl from Encl List by 870220 to Avoid Delay in Administering Exams ML20213A3791987-01-21021 January 1987 Advises That 861211 Rev 11 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable IR 05000335/19860211987-01-20020 January 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-335/86-21 & 50-389/86-20.Violation Re 10CFR50.59 Annual Reporting Requirements for 820721 & 860327 FSAR Updates Withdrawn ML20213A1191987-01-16016 January 1987 Extends Invitation to Participate in 870218 Incident Investigation Program Workshop in Atlanta,Ga.Workshop Will Provide Understanding of Process by Which NRC Investigates Potential Significant Incidents.Agenda Encl.W/O Procedures 1990-06-13
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML20205C3701999-03-29029 March 1999 Final Response to FOIA Request for Documents.App a Documents Encl & Available in Pdr.App B Records Being Completely Withheld (Ref FOIA Exemption 5) DD-98-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-98-10 Has Expired.Decision Became Final on 981116.With Certificate of Svc.Served on 9811201998-11-19019 November 1998 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-98-10 Has Expired.Decision Became Final on 981116.With Certificate of Svc.Served on 981120 ML20237D0471998-08-14014 August 1998 Summarizes 980804 Meeting W/Util in Atlanta,Ga to Discuss Corrective Action Status for Fpfi Conducted in March & April 1998.List of Attendees & Handouts Encl ML20236P9451998-07-15015 July 1998 Forwards Emergency Response Data Sys Implementation Documents Including Data Point Library Updates for Oconee (Number 255),Dresden (Number 257) & Susquehanna (Number 258) ML20247P8331998-05-19019 May 1998 Ltr Contract:Task Order 002, St Luci Engineering & Technical Support Insp, Under Contract NRC-03-98-021 ML20247H9561998-05-19019 May 1998 Ack Receipt of Ltr & Electronic Fund Transfer of $88,000 in Payment for Civil Penalty Proposed by NRC in Ltr .Corrective Actions Will Be Examined During Future Insp ML20216C5511998-05-0808 May 1998 First Partial Response to FOIA Request for Documents.App a Records Partially Withheld (Ref Exemptions 5 & 7c).App B Records Totally Withheld (Ref Exemption 5) ML20217B4041998-04-21021 April 1998 Responds to Submitted as Petition Under 10CFR2.206 Seeking Certain Action by NRC W/Respect to Fp&L. Request Will Not Be Reviewed,Per 10CFR2.206,due to Listed Reasons IA-97-484, Final Response to FOIA Request for Documents.Forwards Records in App H,Being Withheld in Part (Ref FOIA Exemption 7)1998-04-17017 April 1998 Final Response to FOIA Request for Documents.Forwards Records in App H,Being Withheld in Part (Ref FOIA Exemption 7) ML20217B7801998-04-17017 April 1998 Final Response to FOIA Request for Documents.Forwards Records in App H,Being Withheld in Part (Ref FOIA Exemption 7) IR 05000335/19970161998-03-25025 March 1998 Discusses Insp Repts 50-335/97-16 & 50-389/97-16 on 971103- 980109 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $88,000 ML20203K5641998-02-23023 February 1998 Ack Receipt of to President Ofc of Professional Responsibility,Which Requested Investigation of Nrc.Staff Inappropriately Released Info to Licensee That Could Have Resulted in Identifying Individual Referred to in Ltr ML20202D9521998-02-12012 February 1998 Final Response to FOIA Request for Records.App a Records Partially Withheld (Ref Exemptions 7A & 7C) ML20202D8101998-01-28028 January 1998 Fourth Partial Response to FOIA Request for Documents. Documents Listed in App E,Being Released in Entirety. Documents Listed in App F,Being Released in Part (Ref FOIA Exemption 7C) ML20202D8701998-01-23023 January 1998 Second Partial Response to FOIA Request for Documents. Records in App B Being Withheld in Part (Ref FOIA Exemption 7) ML20202D8171998-01-23023 January 1998 Third Partial Response to FOIA Request for Documents. Forwards Records Listed in App C Being Withheld in Part.App D Records Being Withheld in Entirety (Ref FOIA Exemption 7) ML20202D9681998-01-21021 January 1998 First Partial Response to FOIA Request for Documents.Records in App a Encl & Being Released in Entirety ML20202D9991997-11-25025 November 1997 Responds to 971120 FOIA Request.Informs That Request Has Been Forwarded to NRC Headquarters DD-97-20, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-97-20 Has Expired.Commission Declined Any Review.Decision Became Final on 971003.W/Certificate of Svc.Served on 9710071997-10-0707 October 1997 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-97-20 Has Expired.Commission Declined Any Review.Decision Became Final on 971003.W/Certificate of Svc.Served on 971007 ML20202D9261997-06-0606 June 1997 Partially Deleted Ltr Forwarding Allegation Evaluation Repts RII-1997-A-0053 & RII-1997-A-0054 Re Excessive Overtime Worked for Reactor Operators at Plant & Improper Securing of LPCI Pump ML20202D9591997-05-30030 May 1997 Partially Deleted Ltr Re Allegation Rept RII-97-A-0027 Related to Concerns Over Control of on-site Hazardous Matl, Maint Mgt Practices & Industrial Safety Conditions at Plant ML20140A4431997-05-23023 May 1997 Forty-first Partial Response to FOIA Request for Documents. App Aaaa Record Being Withheld in Part (Ref FOIA Exemptions 5 & 7C) ML20148E8811997-05-21021 May 1997 Fortieth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App Zzz.Documents Will Be Withheld in Part (Ref FOIA Exemption 6) ML20141J0741997-05-19019 May 1997 Fifth Partial Response to FOIA Request for Documents.App E Records Being Withheld in Part (Ref FOIA Exemption 7) ML20141C6011997-05-14014 May 1997 Thirty-sixth Partial Response to FOIA Request for Documents. App Ttt Records Being Withheld in Part (Ref FOIA Exemption 6) ML20148C3561997-05-12012 May 1997 Thirty-fifth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App Rrr Being Made Available in Pdr.App SSS Records Being Withheld in Part (Ref FOIA Exemption 6) ML20138F6321997-04-25025 April 1997 Thirty-first Partial Response to FOIA Request for Documents. Records in App Lll Encl & Will Be Available in Pdr.App Mmm Records Withheld in Part (Ref FOIA Exemptions 2 & 6) ML20140E4971997-04-23023 April 1997 Thirtieth Partial Response to FOIA Request for Documents. Forwards App Kkk Records Being Made Available in PDR ML20137Y9371997-04-21021 April 1997 Discusses Corrective Actions in Response to GL 96-06 Concerns for Plant,Units 1 & 2 ML20137Y0011997-04-17017 April 1997 Twenty-eighth Partial Response to FOIA Request for Documents.Records in App III Encl & Being Withheld in Part (Ref FOIA Exemptions 2 & 6) ML20202E0611997-04-0808 April 1997 Partially Deleted Ltr Forwarding Allegation Evaluation Rept RII-97-A-0015 Re Female Visitors Not Being Informed About Monitoring of Embryo/Fetus Prior to Gaining Access to Radiologically Controlled Area ML20137P2261997-04-0707 April 1997 Twenty-fifth Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App Eee ML20137R1061997-04-0404 April 1997 Twenty-fourth Partial Response to FOIA Request for Documents.Forwards Documents Listed in App Ddd.Documents Being Released in Entirety.Copyright Documents Withheld ML20137K8161997-04-0202 April 1997 Twenty-second Partial Response to FOIA Request for Documents.Records in App Bbb Encl & Will Be Available in PDR ML20137M0891997-04-0101 April 1997 Twenty First Partial Response to FOIA Request for Documents. Forwards Documents Listed in App GG Throuth Aaa Being Made Available in PDR ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20137R2791997-03-27027 March 1997 Twentieth Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App FF ML20137K4711997-03-25025 March 1997 Nineteenth Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App DD & Ee ML20137B8371997-03-12012 March 1997 Sixteenth Partial Response to FOIA Request for Documents. Records Subj to Request Identified in App Z & Encl ML20136C4211997-03-0606 March 1997 Fifteenth Partial Response to FOIA Request for Records. App Y Records Encl & Available in PDR ML20136A7521997-03-0505 March 1997 Forteenth Partial Response to FOIA Request for Documents. Records in App W Encl & Available in Pdr.App X Records Withheld in Part (Ref FOIA Exemption 6) ML20135E4221997-03-0505 March 1997 Ack Receipt of & Check for $100,00 in Payment for Civil Penalties Proposed by NRC in .Corrective Actions to Be Examined During Future Insps ML20136A6181997-02-28028 February 1997 Twelfth Partial Response for FOIA Request for Documents.App U Records Being Withheld in Part (Ref FOIA Exemptions 4,5 & 6) 1999-09-28
[Table view] |
Text
.__ . _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. o June 25, 1987 Florida Power and Light Company ATTN: Mr. C. O. Woody Group Vice President Nuclear Energy Department P. 0. Box 14000 Juno Beach, FL 33408 Gentlemen:
SUBJECT:
OPERATOR AND SENIOR OPERATOR LICENSING REQUALIFICATION EXAMINATIONS In a telephone conversation between Mr. Mark Shepherd, Operations Training Supervisor, and Mr. Steven Bitter, NRC Region II Operator Licensing Section, I arrangements were made for administration of the operator licen::ing requalifi-cation examinations at the Florida Power and Light Company, St. Lucie Nuclear Plant.
The written and plant oral requalification examinations are scheduled for the week of September 28, 1987.
In order for us to meet the above schedule, it will be necessary for the facility to furnish the selected reference material from the approved list in Enclosure 1 by July 24, 1987. Any delay in receiving this material will result in a delay in administration of the examinations. Our examinations are scheduled far in advance with considerable planning to utilize our present limited examiner manpower and to meet the examination date requested by the various facilities. Therefore, missing the July 24, 1987, deadline, even by a few days, will likely result in a long delay, since it would not be possible to reschedule examinations at other facilities. Mr. Shepherd has been advised of our selected reference material requirements, the number of reference material sets that are required, and the examiners' names and addresses where each set is to be mailed.
This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101 which expires on May 31, 1989.
Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, DC 20503.
The facility management is responsible for providing adequate space and facilities in order to properly conduct the written examinations. Enclosure 2, "Administra- <
tion of Operator Licensing Written Examinations," describes our requirements for conducting these examinations. Mr. Shepherd has also been informed of these requirements.
8707070651 870625 PDR ADOCK 05000335-y PDR k\
[ uM
\
l l
1
- J e 25, M87 Florida Power and Light Company 2 Enclosure 2, also contains the Rules and Guidance that will be in effect during the administration of the written examination. The facility management is responsible for ensuring that all candidates are aware of these Rules.
The facility staff review of the written examination will be conducted in accordance with requirements specified in Enclosure 3 " Requirements for Facility Review of Written Examination." Mr. Shepherd has been informed of these requirements. ,
1 l A list of the names of all licensed personnel, identified by license number, l license status (active or inactive), and shift status (on-shift or off-shift),
should be submitted by August 24, 1987, so that we will be able to determine the names of those candidates who will be examined.
Thank you for your consideration in this matter. If you have any questions regarding the examination procedures and requirements, please contact Mr. John F. Munro at 404/331-5544, or Mr. Steve Bitter at 404/331-2831.
Sincerely, (ORIGINAL SIGNED BY M. B. SHYMLOCK FOR) l Caudie A. Julian, Chief Operations Branch Division of Reactor Safety
Enclosures:
- 1. Reference Material Requirements
- 2. " Administration of Operator Licensing Written Examinations" and NRC Rules & Guidelines
- 3. " Requirements for Facility Review of Written Examination" cc w/encls:
P. Fincher, Training Superintendent G. Boissy, Plant Manager l bec w/encls:
Projects Section Chief Senior Resident Inspector a46cument Control Desk State of Florida Ril RII RII RII ,
/R7 hew obw SWter h[%FMuho C[,ih 06/ff/87 06/3/87 0 y/vh/87 06/ /87 L.
ENCLOSURE 1 REFERENCE MATERIAL REQUIREMENTS FOR REACTOR / SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS
- 1. Existing learning objectives and lesson plans (including training manuals, plant orientation manual, system descriptions, reactor theory, thermo-dynamics,etc.)
Training materials should include all substantive written material used for preparing candidates for initial R0 and SR0 licensing. The written material should be inclusive of learning objectives and the details presented during lecture, rather than outlines. Training materials should be identified by plant and unit, bound, and indexed. Failure to provide complete, properly bound and indexed plant reference material will result in canceling and rescheduling of the examinations. Training materials which include the following should be provided:
- a. System descriptions including descriptions of all operationally relevant flow paths, components, controls and instrumentation.
System training material should draw parallels to the actual procedures used for operating the applicable system.
- b. Complete and operationally useful descriptions of all safety-system interactions and, where available, B0P system interactions under emergency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.
- c. Training material used to clarify and strengthen understanding of emergency operated procedures.
- d. Comprehensive theory material that includes fundamentals in the area of theory of reactor operation, thermodynamics, heat transfer and fluid flow, as well as specific application to actual in-plant components. For example, mechanical theory material on pumps should include pump theory as well as descriptions of how these principles actually installedap(ply to majorCoolant i.e., Reactor plant pumps and pumps, all the ECCSsystems pumps,inRecirculation which they are pumps, Feedwater pumps and Emergency Feedwater pumps). Reactor theory material should include descriptions that draw explicit ties between the fundamentals and the actual operating limits followed in the plant (i.e., reactor theory material should contain explanations of how principles related to the actual curves are used by operators to verify shutdown margin or calculate an ECP).
- 2. Procedure Index (alphabetical by subject)
- 3. All administrative procedures (as applicable to reactor operation or safety)
. 1
Enclosure 1 2
- 4. All integrated plant procedures (normal or general operating procedures)
- 5. (emergency instructions, abnormal or special Emergency procedures ) procedures
- 6. Standing orders (important orders that are safety-related and may supersede the regular procedures)
- 7. Fuel-handling and core-loading procedures, (initial core-loading procedure, l when appropriate)
- 8. Annunciator procedures (alarm procedures, including set points)
- 9. Radiation protection manual (radiation control manual or procedures)
- 10. Emergency plan implementing procedures
- 31. Technical Specifications
- 12. System operating procedures
- 13. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams l 14. Technical Data Book, and/or plant curve information as used by operators and I
facility precautions, limitations, and set points (PLS) for the facility
- 15. Questions and answers that the licensee has prepared (voluntary by licensee)
- 16. The following on the plant reference simulator l a. List of all readily available initialization points i l b. List of all preset malfunctions with a clear identification number.
The list should include cause and effect information. Specifically, for each malfunction, a concise description of the expected result, or range of results, that will occur upon implementation should be provided. Additionally, an indication of which annunciators are to be initially expected should be given.
- c. A description of simulator failure capabilities for valves, breakers, indicators and alarms
- d. Where the capability exists, an explanation of the ability to vary the '
severity of a particular malfunction should be provided, i.e., ability ,
to vary the size of a given LOCA or steam Icak, or the ability to cause a slow failure of a component such as a feed pump, turbine generator or major valve (e.g., drifting shut of a main feedwater control valve).
- e. An indication of modeling conditions / problems that may impact the examination i
l.
Enclosure 1 3 i
- f. Identification of any known Performance Test Failures not yet completed
- g. Identification of significant differences between the simulator and the 4 l control room l 1
- h. Copies of facility generated scenarios that expose the candidates to l situations of degraded pressure control (PWR), degraded heat removal ;
capability (pWR and BWR), and containment challenges (BWR) may be provided (voluntary by licensee).
- i. Simulator instructors manual (voluntary by licensee)
- j. Description of the scenarios used for the training class (voluntary by licensee)
- 17. All material different from that listed in items 1-16 that is specific to the Operator Requalification Training Program
- 18. Additional material required by the examiners to develop examinations that meet the requirements of these standards and the regulations The above reference material should be approved, final issues and should be so i marked. If a plant has not finalized some of the material, the chief examiner shall verify with the facility that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination. All procedures and reference material should be bound with appropriate indexes or tables of I contents so that they can be used efficiently. I l
l
q
\
ENCLOSURE 2 ADMINISTRATION OF OPERATOR LICENSING WRITTEN EXAMINATIONS
- 1. A single room shall be provided for completing the written examination.
The location of this room and supporting restroom facilities shall be such as to prevent contact w ith all other facility and/or_ contractor personnel during the duration of the written examination. If necessary, the facility should make arrangements for the use of a suitable room at a local school, motel, or other building. Obtaining this room is the responsibility of the licensee.
- 2. Minimum spacing is required to ensure examination integrity'as determined !
by the chief examiner. Minimum spacing should be.one candidate per table, )
with a 3-ft. space between tables. No wall charts, models, and/or other training materials shall be present in the examination room.
- 3. Suitable arrangements shall be made by the facility if the candidates are I to have lunch, coffee, or other refreshments. These arrangements shall comply with Item 1 above. These arrangements shall be reviewed by the examiner and/or proctor.
- 4. The facility staff shall be provided a copy of the written examination and answer key after the last candidate has completed and handed in his written examination. The facility staff shall then have five working days to provide formal written comments with supporting documentation on j the examination and answer key to the chief examiner or to the regional ;
office section chief.
- 5. The licensee shall provide pads of 8-1/2 by 11 inch lined paper in unopened packages for each candidate's use in completing the examination.
The examiner shall distribute these pads to the candidates. All reference material needed to complete the examination shall be furnished by the examiner. Candidates can bring pens, pencils, calculators, or slide rules into the examination room, and no other equipment or reference material shall be allowed.
- 6. Only black ink or dark pencils should be used for writing answers to 4 questions. J a
l 1
i i
j
1 l
I l
)
Enclosure 2 2 i NRC RULES AND GUIDELINE FOR LICENSE EXAMINATIC.
1 During the administration of this examination the following rules apply:
- 1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties. I
- 2. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
- 3. Use black ink or dark pencil only to facilitate legible reproductions.
- 4. Print your name in the blank provided on the cover sheet of the examination.
- 5. Fill in the date on the cover sheet of the examination (if necessary).
- 6. Use only the paper provided for answers.
- 7. Print your name in the upper right-hand corner of the first page of each section of the answer sheet.
- 8. Consecutively number each answer sheet, write "End of Category " as appropriate, start each category on a new page, write on only one side of the paper, and write "Last Page" on the last answer sheet.
- 9. Number each answer as to category and number, for example,1.4, 6.3.
- 10. Skip at least three lines between each answer.
- 11. Separate answer sheets from pad and place finished answer sheets face :
down on your desk or table.
- 12. Use abbreviations only if they are commonly used in facility literature.
l l 13. The point value for each question is indicated in parentheses after the question and can be used as a guide for the depth of answer required.
- 14. Show all calculations, methods, or assumptions used to obtain an answer I
to mathematical problems, whether indicated in the question or not.
- 15. Partial credit may be given. Therefore, ANSWER ALL PARTS OF THE QUESTION ;
AND DO NOT LEAVE ANY ANSWER BLANK.
I
1 Enclosure 2 3
- 16. If parts of the examination are not clear as to intent, ask questions of the examiner only.
- 17. You must sign the statement on the cover sheet that indicates that the work is your own and you have not received or been given assistance in completing the examination. This must be done after the examination has been completed.
- 18. When you complete your examination, you shall: ,
- a. Assemble your examination as follows:
(1) Exam questions on top.
1 (2) Exam aids - figures, tables, etc.
(3) Answer pages including figures which are a part of.the answer.
I
- b. Turn in your copy of the examination and all pages used to answer j the examination questions. l
- c. Turn in all scrap paper and the balance of the paper that you did not use for answering the questions.
I
- d. Leave the examination area, as defined by the examiner. If after i leaving, you are found in this area while the examination is still in progress, your license may be denied or revoked.
i l
1
.]
ENCLOSURE 3 REQUIREMENT FOR FACILITY REVIEW 0F WRITTEN EXAMINATION
- 1. There shall be no review of the written examination by the facility staff before or during the administration of the examination. Following the administration of the written examination, the facility staff shall be provided a marked-up copy of the examination and the answer key. )
1
- 2. The facility will have five (5) working days from the day the written '
examination is given to provide formal comment submittal. The submittal will be made to the responsible regional office by the highest level of Corporate Management for Plant Operations. A copy of the submittal will be forwarded to the chief examiner, as appropriate. Comments not submitted within five (5) working days will be considered for inclusion in the grading process on a case by case basis by the regional office section chief. I Should the coment submittal deadline not be met, a long delay for .
finalization of the examination results may occur. j l
The following format should be adhered to for submittal of specif1c 3.
comments:
- a. Listing of NRC question, answer and reference l b. Facility comment
- c. Supporting documentation NOTES: 1. No change to the examination will be made without submittal of complete, current, and approved reference material . l i
- 2. Comments made without a concise facility recommendation will l not be addressed. 4