0ffi010l W,
JUN?6 WM South Carolina Electric and Gas Company ATTN: Mr. D. A. Nauman, Vice President Nuclear Operations P. O. Box 764 (167)
Columbia, SC 29218 Gentlemen:
SUBJECT:
DOCKET NO. 50-395 During the past four years, NRC has had a contract with the Boise Interagency Fire Center (BIFC) to establish / evaluate emergency communications.
These evaluations include plans for minimizing the time required for the deployment of NRC radio equipment and/or BIFC radio equipment as well as augmenting response personnel in the event of an emergency or during an exercise.
BIFC personnel have conducted site Radio Frequency Interference (RFI),
Electromagnetic Interference (EMI) and radio equipment placement surveys at your site.
These surveys provide guidance on the installation and use of radio communications during an emergency condition at a reactor site.
BIFC Survey findings and recommendations for your site are enclosed.
Region II requests your assistance in estimating the cost of implementing these recommendations.
Based on the cost estimates gathered, Region 11 may request licensee installation of these systems in the near future.
Your cooperation would be greatly appreciated.
If you have any questions regarding this matter or need additional information, please contact Mr. T. R. Decker of our staff at (404) 331-2559.
Sincerely, I I()IID bl % fl
( M. Qgeg hr Douglas M. Collins, Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety l
and Safeguards
Enclosure:
i Emergency Communication System i
for Summer cc w/ encl:
(See page 2) 8707070525 870626 hDR ADDCK 05000395 PDR l
'\\
resr
South Earolina Electric and Gas Company 2
cc w/ encl:
- 0. S. Bradham, Director, Nuclear Plant Operations J. L. Skolds, Deputy Director Operations and Maintenance J. B. Knotts, Jr.
Debevoise and Liberman W. A. Williams, Jr., Special Assistant, Nuclear Operations -
Santee Cooper A. M. Paglia, Jr., Manager Nuclear Licensing 1
i bec w/ encl:
I l
l NRC Resident Inspector l
J. Hopkins, Project Manager, NRR Document Control Desk State of South Carolina l
l 5
i I
l 1
RII RII RII tLW M-g(P4 ETesta
,,TDecker HDance q /p787 6/14/87 6/2f /87 6
i l
ENCLOSURE EMERGENCY COMMUNICATION SYSTEM FOR SUMMER l
NRC Regional and National Radio Support Cache Equipment Install two twin lead, direct current, control circuits from the NRC area in the EOF to the outside/ roof of the building (Nuclear Training Center).
Both j
ends of the control circuits should be terminated with WE-742 wire junctions and labeled for NRC emergency use only.
The outside termination should be housed in a waterproof container to protect it from the elements. The wire for the control circuits should be at least equal in quality and size to those installed by a telephone company for voice quality telephone circuits.
The exact placement of these terminal blocks are to be determined by the licensee.
i l
- l 1
1 l
u_-__-_-_______-__