ML20234D931
| ML20234D931 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 12/30/1987 |
| From: | Zimmerman S CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NLS-87-277, NUDOCS 8801070324 | |
| Download: ML20234D931 (1) | |
Text
r 1
~
e CP&L I
i Carolins Power & Light Company J
SEC 3 01987
)
United States Nuclear Regulatory Commission ATTENTION: Document Control Desk j
Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 CONTROL ROOM DESIGN REVIEW i
Reference 1:
Control Room Design Review - Final Summary Report; December 31,1986; Serial: NLS-86-449.
Reference 2:
Control Room Design Review Final Summary Report - Revision 1; June 23,1987; Serial: NLS-87-123.
Gentlemen:
Carolina Power & Light Company hereby informs the Staff of a necessary change to the Control Room Design Review (CRDR) corrective action implementation schedule for the Brunswick Steam Electric Plant. This submittal is in compliance with the commitment for notification of schedule changes as stated in the referenced documents.
The Control Room Furnishings Project, described in Section 6.2.11 of the CRDR final summary report, was scheduled for completion by December 31,1987. Twelve of the fifteen Human Engineering Discrepancies (HED) addressed by this project have been completed. The remaining three HEDs (HED # 2063-3125,20SY-3204, and 206X-3272) j are to be resolved by the installation of a guard rail in the control room. Due to the current unavailability of certain guard rail brackets, the guard rail installation cannot be completed by the scheduled implementation date. In order to avoid negative safety impact during plant operation, the installation of guard rail brackets onto the control J
panels will occur during upcoming plant Refueling Outages. The guard rail installation will be completed during Refueling Outage 6 for Unit No.1 (currently scheduled to begin November l988) and Refueling Outage 7 for Unit No. 2 (currently scheduled to begin January 1988).
Should additional CRDR Project schedule changes prove necessary, we will notify you promptly.
1 Yours very truly,
.Y
{n S. R. Zimmerman l
Manager I
AWS/vtn (5350AWS) cc:
Dr. 3. Nelson Grace Mr. R. Ramirez (NRC)
Mr. W. H. Ruland Mr. E. Sylvester OI am:g.<
,s l
'Menue SM
- P o B x 1551
- Ralep N C 27602 D
j 871230 800107032 05000324 Etz=:rrMI::r=2rr.:::ErramWmTenu l
P l
___-______--_-___d