ML20234D721

From kanterella
Jump to navigation Jump to search
Requests Assistance in Estimating Cost of Implementing Encl Boise Interagency Fire Ctr Survey Findings & Recommendations for Site.Region II May Request Licensee to Install Sys Based on Cost Estimates Gathered
ML20234D721
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/26/1987
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kingsley O
SYSTEM ENERGY RESOURCES, INC.
References
NUDOCS 8707070316
Download: ML20234D721 (3)


Text

of0Clol JUN 2 61987 System Energy Resources, Inc.

ATTN: Mr. O. D. Kingsley, Jr.

Vice President, Nuclear Operations P. O. Box 23054 Jackson, MS 39205 Gentlemen:

SUBJECT:

DOCKET NO. 50-416 During the past four years, NRC has had a contract with the Boise Interagency Fire Center (BIFC) to establish / evaluate emergency communications.

These evaluations include plans for minimizing the time required for the deployment of NRC radio equipment and/or BIFC radio equipment as well as augmenting response personnel in the event of an emergency or during an exercise.

BIFC personnel have conducted site Radio Frequency Interference (RFI),

Electromagnetic Interference (EMI) and radio equipment placement surveys at your site. These surveys provide guidance on the installation and use of radio-communications during an emergency condition at a reactor site.

BIFC Survey findings and recommendations for your site are enclosed. Region II requests your assistance in estimating the cost. of implementing these recommendations.

Based on the cost estimates gathered, Region 11 may request licensee installation of these systems in the near future.

l Your cooperation would be greatly appreciated.

If you have any questions l

regarding this matter or need additional information, please contact l

Mr. T. R. Decker of our staff at (404) 331-2559.

Sincerely, 1

l blfilft DouglasM. Collins,Chiqe5igneCl Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards i

Enclosure:

Emergency Communication System for Grand Gulf cc w/ encl:

(Seepage 2) 8707070316 870626 j

PDR ADOCK 05000416

\\

F PDR l

___--_- _ M 1

~

~

System Energy Resources, Inc.

2 cc w/ encl:

T. H. Cloninger,.Vice President, Nuclear Engineering and Support J. E. Cross, GGNS Site Director C. R. Hutchinson, GGNS General Manager L. F. Dale, Director, Nuclear Licensing and Safety R. T. Lally, Manager of Quality Assurance Middle South Services, Inc.

R. B. McGehee, Esquire Wise, Carter, Child, Steen and Caraway N. S. Reynolds, Esquire Bishop Liberman, Cook, Purcell

& Reynolds R. W. Jackson, Project Engineer i

occ w/ encl:

NRC Resident Inspector L. Kintner, NRR Document Control Desk State of Mississippi I

RII RII R1

?'M C.Dd j/

ETesta d,TDecker

'[.HDance 6/M/87 6/#/87 6/N/87

ENCLOSURE EMERGENCY COMMUNICATION SYSTEM FOR GRAND GULF NRC Regional and National Radio Support Cache Equipment Install two twin lead, direct current, control circuits from the NRC area. in j

the EOF. to the outside/ roof of the building.

Both ends of the control circuits 1

should be terminated with WE-742 wire junctions and labeled for NRC emergency use only.

The outside termination should be housed in a waterproof container i

to protect it from the elements. The exact placement of these terminal blocks are to be determined by the licenseo. The wire for, the control circuits shoulf be at least equal in quality and size to those installed by a telephone company i

for voice quality telephone circuits.

l J

- - - -