ML20234D447

From kanterella
Jump to navigation Jump to search
Revised Page 4 to Monthly Operating Rept for Feb 1987, Correcting Discrepancies in Data
ML20234D447
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/28/1987
From: Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20234D422 List:
References
NUDOCS 8709220095
Download: ML20234D447 (1)


Text

'

OPElWPIK; inTA REIURO DOCKEIP NO. '50-482 N3LP CREER GlWElWTING STATION h0LP CREEK NUCLEAR OPERATING CORPORATION DATE 03-01-87 COMPLETED BY M. Williams TEL8PilONE316-364-8 331 OPER\\TIiK; STATUS 1.

Reportirg Period:

February, 1987 Gross flours in Reporting Period:

672 _

2.

Currently Authorized Power Level (MWt) : 3411 Max. Depend. Capacity (MWe-Net) : 1128 Design Electrical Rating (MWe-Net) :

1170 3.

Power Level to Which Restricted (If Any) (Mwe-Net) :

N/A 4.

Reasons for restriction (If Any):

N/A This Month Yr to Date Cumulative 5.

Number of Hours Reactor was Critical 672.0

'1325.3 10639.2-6.

Reactor Reserve Shutdown Hours 0.0 64.2 235.4 7.

Hours Generator on Line 661.8 1240.9 10431.0-8.

Unit Reserve Shutdown flours 0.0 0.0 0.0 9.

Gross Thermal Energy Generated (tMi) 2,192,444 3,725,757 33,471,099

10. Gross Electrical Energy Generated (MWH) 770,296 1,315,676 11,682,046
11. Net Electrical Energy Generated (MWH) 738,939 1,250,204 11,149,493~

12.

Reactor Service Factor 100.0 93.6 81.5 l

13.

Reactor Availability Factor 100.0 98.1 83.3 I

l

14. Unit Service Factor 98.5 87.6 79.9
15. Unit Availability Factor 98.5 87.6 79.9
16. Unit Capacity Factor (Using MDC) 97.5 78.3 75.7 4

17.

Unit Capacity Factor (Using Design MWe) 94.0 75.5 73.0 D

18. Unit Forced Outage Rate 0.0 3.5 4.3 i
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each) : tbne

. 20.

If Shut Down at End of Report Period, Estimated Date of Startup:

N/A 1

i Page 4 of 7 8709220095 870916

~

PDR ADDCK 05000402 R

PDR 1

__ - - - _ _: