ML20234D437

From kanterella
Jump to navigation Jump to search
Revised Page 5 of Monthly Operating Rept for Jan 1987, Correcting Discrepancies in Data
ML20234D437
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/31/1987
From: Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20234D422 List:
References
NUDOCS 8709220092
Download: ML20234D437 (1)


Text

}

OPERATING IMTA ngg);gp i

DCCKhlf NO.

50-482 bOLF CREEK GENERATING STATION,

WOLF CREEK NUCLEAR OPERATING CORPORATION (

DATE 02-01-87 COMPLUTED IW M. Williams s

TELEPHONE 316-364-8831 j OPERATING STATUS 1.

Reportirg Period:

January, 1987 Gross Hours in Reporting Pericxl: 744 2.

Currently Authorized Power Level (MWt): 3411 Max. Depond. Capacity (MWe-Net) : 1128 Design Electrical Rating (FMe-Net) : 1170 3.

Power Level to Which Restricted (If Any) (Mwe-Net):

N/A 4.

Reasons for restriction (If Any) :

N/A

' Ibis Month Yr to Date Ctraulative 5.

Number of Hours Reactor was Critical 653.3 653.3 9967.2 6.

Reactor Reserve Shutdown Hours 64.2 64.2 235.4

-l 7.

Hours Generator on Line 579.1 579.1 9769.2 i

8.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.

Gross Thetmal Energy Generated (MI) 1,533,313 1,533,313 31,278,655

10. Gross Electrical Energy Generated (MWH) 545,380 545,380 10,911,750
11. Net Electrical Energy Generated (MI) 511,265 511,265 10,410,554 12.

Reactor Service Factor 87.8 87.8 80.5

13. Reactor Availability Factor 96.4 96.4 82.4 14.

Unit Service Factor 77.8 77.8 78.9 15.

Unit Availability Factor 77.8 77.8 78.9 16.

Unit Capacity Factor (Usirg MDC) 60.9 60.9 74.5 _

17. Unit Capacity Factor (Using Design FMe) 58.7 58.7 71 2 18.

Unit Forced Outage Rate 7.2 7.2 4.5

19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each) : None 20.

If Shut Down at End of Report Period, Estimated Date of Startup:

2-01-87 Page 5 of 9

%[2h P

e

_ -