i
.
hy
JUN 3 01987
Docket Nos. 50-424, 50-425
License Nos. NPF-61, CPPR-109
Georgia Power Company
N: Mr. James P. O'Reilly
Senior Vice President-
Nuclear Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-424/87-36 AND 50-425/87-25
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted
by G. A. Hallstrom on May 25-28, 1987.
The inspection included a review of
activities authorized for your Vogtle facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were identified.
.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORN3MA6 SIGNID BY
ALAN R. HERDT
J
Alan R. Herdt, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
NRC Inspection Report
cc w/ encl:
(See page 2)
8707070101 870630
ADOCK 05000424
G
ppg
$ \\
n o,
-
,
'O
'
JUN 3 01987
.
Georgia Power Company
a
cp w/ encl:
LK. E. Conway, Senior Vice President &
J roject Director
14. Whitney, General Manager Project
Support
g D. Rice, Vice President, Project
Engineering
. g H. Pinson, Vice President, Project
Construction
y W. Hayes, Vogtle Quality
Assurance Manager
gB. Bockhold, General Manager,
Nuclear Operations-
-!
y Gucwa, Manager, Nuclear Safety
and Licensing
g A. Bailey, Project Licensing
Manager
7.W. Churchill,Esq.,Shaw,-
Pittman, Potts and Trowbridge
j
gE. Joiner,Troutman, Sanders,
Jockerman and Ashmore
v . G. Ledbetter, Commissioner,
r
Department of Human Resources
l
H. Badger, Office of Planning
"
and Budget
% Kirkland, III, Counsel,
Office of the Consumer's Utility
__Jouncil
v8'. Feig, Georgians Against
fluclear Energy
- . B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
Panel
g.O.H. Paris,AdministrativeJudge
Atomic Safety and Licensing Board
Panel
g A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
bec w/ encl:
L(E(Reis,OGC
M. Hill, IE
W Miller, NRR
Brach, EDO
Sinkule, RII
V
(d.Christnot,RII
C Resident Inspector
Document Control Desk
State of Georgia
1b
RII b
'RII
MC'
RI
GAHa
om:e
JJB
e'
MVSinkule
06/g/87
06g87
06/p/87