ML20234C012

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Aug 1987
ML20234C012
Person / Time
Site: Palo Verde  
Issue date: 08/31/1987
From: Haynes J, Hull J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
192-00280-JGH-T, 192-280-JGH-T, NUDOCS 8709210143
Download: ML20234C012 (16)


Text

_

tg#

Arizona Nuclear Power Project.

ti P O. box 52034 e PHOENIX. ARIZONA 65072-2034 i

192-00280-JGH/TRB J

September 11, 1987 1

NRC Document Control Desk

-U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Falo Verde Nuclear Generating Station (PVNGC)

Units 1, 2 and 3 Docket Nos. STN 50-528 License Nos. NPF-41 STN 50-529 NPF-51 STN 50-530 NPF-65 August Monthly Operating Report File:

87-024-404

Dear Sirs:

Attached please find the August 1987, Monthly Operating Reports. prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A'(Technical j

Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Operating Licenses.

By copy of this letter we are also forwarding a' copy of the' Monthly Operating Reports to the Regional Administrator of

)

the Region V Office.

If you have any questions, please contact me.

Very tru y yours, fW (Hff J. G. Haynes Vice President I

Nuclear Production

{

JGH/TRB/cid cc:

0. M. DeMichele (all w/a)

E. E. Van Brunt, Jr.

J. B. Martin j

E. A. Licitra 1

-A. C. Gehr

]

J. A. Amenta INPO Records Center 4

2,"ABa#!BMBjIga k

.D

NRC MONTHLY OPERATING REPCRT.

DOCKET-NO.

59-52@_______

UNIT NAME P V_ N G S _ _1 _ _ _ _ _ _

DATE 99fg@f@Z_____

COMPLETED BY J.L._ Hull ____

TELEPHONE

@g2-393-2@Z9, 9EER$11Ng_@I61U@

1.-

Unit Name: Pglo_Vggdg_Nuciggr_990eE9$109_Et9$100t_M01k_1 2.

Reporting Period: _Auguat_19@Z 3.

Licensed Thermal Power (MWt): 3@gg 4..'

Nameplate' Rating (Gross MWe): 1493 5.

Design Electrical Rating (Net MWe):

12Zg 6.

Maximum Dependable Capacity-(Grosa MWe): 1@g@

7.

Maximum Dependable Capacity (Net MWe):

1221 8.

If Changes Occur In Capacity Ratings (Itema Number 3 Through 7)

Since Lost Report, Give Reasons:

_____________________________________________________QNE_________

Power Level to Which Reatricted, If Any (Net MWe):

_N 9.

10.

Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative 11.

Hours in Reporting Period

___Z44____

___Q@@2____

__1@944___

12.

Number of Houra Reactor

_9 221.5__

__3 @3@.4__

Wan Critical

.___@44 @__

3 t

13.. Reactor Reserve Shutdown Houra

_____g.g__

______g.g_,

_____g.g__

14.

Hours Generator On-Line

___@44t@__

__@tZ5@tg__

_@t9@Zz@__

15.

Unit Roserve Shutdown Houra

_____g.g__

______9 9__

_____9.g__

Groaa' Thermal Energy av.

Generated (MWH) 2 431 392.

13 493 9Z9.

32 3@@t122 t

1 t

t t

17.

Grona Electrical Energy 215 Zgg 399

_4t@@@t@gg.

11 Generated (MWH)

__@44 t

3 t

18.

Net Electrical Energy 492 @4@.@

1934@2 392.@'

Generated (MWH)

__Z9ZtZ11.

4 t

t t

19 '.

Unit Service Factor

___@@.@3__

____@4.43__

_____q4.33_

20.

Unit Availability Factor

___@@.@3__

____@4.43__

_____@4.33_

21.

Unit Capacity Factor (Using MDC Net)

___@Z.@3__

____@l.@$__

____@1.53_

22.

Unit Capacity Factor g

l (Using DER Net)

___@4.43__

____59.43__

____59.13_

23.

Unit Forced Outage Rate

___13.43__

____35.@3__

____25.@3_

24.

Shutdowns Scheduled Over Next 6 Montha (Type, Date, and Duration of Each): @cheduled_date_for_negt_rgfueling_ghutdown-1gf922@7 ___

Dgrgtigg_gf_rgfugligg_ghytdgwg_ggprggingtgly_Zg_dgyg___

25.

If Shutdown At End of Report Period, Estimated Date of Startup:

26.

Unite ~in~5 eat ~S t $ t u S ~ I Pr 15 E~ T S~ U$$ $ e r cI E S~ U~p$ r a t i Sn55 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~

Forecast Achieved INITIAL CRITICALITY

__QL@Q__

_5225f@5_

INITIAL. ELECTRICITY

__@f@S__

_@figf@5_

COMMERCIAL OPERATION

_114@5_,

_1/2@f@@_

1 ['_' c.

,g gg-

,f

_'- i E.-

=,g

. _ r..,.

g--

s

.. 'f ', " O' s

S. j,

.'?,

t' -

..,l g.;

i

^)

t: 'l

+,<'/'"

k

'.k 4

a c.

lh? -

"s a

s

- Q.-

3 t

, y g

s; e

4:

e. a },5

.J '

.+

,v

.y *n 9, y'

-f,~

,s.

1 a

i..

...(**,;4 4.g % y,%

'(

s-g,,

v3

. /1 ;

s 4

-3 4

u

-w-t

~

e c'

' ~

' l

' AVERAGE DAILY UNIT' POWER. LEVEL l s <,. h

' x', j'

t s.

s y

d

@i 4

- DOCKET NO.j' 50-528" q.

4.

7

~

3 U N I T _ _ _ _ _ _. _ P_ V_ N_ G_ S_ _ _1 :

_e_ _.._. '

.'Q.

e.

3 ',

DATE,

_ _ _ 0_ 9_ _/ 0 8_ _/ 8 7_ _ _ _ _s

.gv'

. ~.

1 i

t 3E m.

.. COMPLETED BY J.L.-Hull o

~

  • ' TELEPHONE ___'5_0_2_25_5_5 ~55_7_5__7~~,5 np.

y.

,m; 4

t a

s t-f

.'t I.

f "s e,

eau 9ust' - 1987~

MO__N_T.H.:

f5 t

a r

q'

+

.yi

<< DAY AVERAGE-DAILY. PO'WER LEVELS DAY AVERAGE' DAILY POWER LEVEL' 4

. x, a

1 1

;r -

yn

.'1 H __

___.___'_12.18 0..~. _..

^

'17:

_ _ _ _ _ _ _ _.1. 3 _ 5_5_'_

x. s 2_

s,.

y u

a x

+.

~

m i

2'

'lz 2 _3 _8 _ _ _ _ _ _ _ _ _ _'

118 ~.

1i255-

.i-t 1

+;1

. c

- ~3 1i243.%

19

__ __ _ _1 2 4 7_ __ _

__ _"_ a.

A__

,r 4

2

'1 238-

-20 __ ___

____1x_247___________

4 3

N; F '

I h

6

~

d ii

/

.t 5 '. _ _ _ _ _ _ _ _ 1. 1 2_ 3 _4.'. _ _ _'_ _ _ +_ _ _

21 _ _<

12_2_4 7_ _ _ _ _ _ _. _ _ _ _.

' j i

F 6 : _ _ _ _ _ _ _ _ _1 t 2 L3_ _ _ _ _ _ _. _

22 ____ _____1,255___

l} '

. i 7

1 247 23 ____,_ _ _'____1z 2_ 5 _1 _~ _ _ _ _ _ _ _ _ _ _, T.#

.___________z______________-

f er a:

' 24 _ ____

_'_'__1 255 4

,p

. a 1 251 4

_A_.

o 1t_247 25, 9

J

______1 25_1__

2__

~yl 1 0 _ _ _ _ _ _ _ _.l z.2 2 _6 26 __.. ______1 1 51.__ _______.

2

. o..

' 1 247 -

,27.)..

.___'9__9_1___

11

_____ _1A s

. 1 2 _ _ _ _ _. _ _ _. _ _ _1 _2_4 7_ _ _ _ _ _ _ _ _ _ _-

28, ____________O_.___________.__

...y 1

g 1

.,.-f I

~~ _ _

____ 1z25.5_____ _ _ _

29 __.'.____ _

_O___

1*

^ -

,x; 1_.4 3_ ' _ _ _ _ _ _ -

.30

__ ______ O_

2_

14

____ _1 i15 __

______.1z2.5_1___________

31

________0___________1__-

A_6_3___________

9; 2_

16 ___________1 a

i-

-V 1

k*

m I

,.I_'

6 f

f(

REFUELING INFORMATION-1 DOCKET.NO.

59-52@_______

UNIT PVNGS-1______

DATE 99fgggg7_____

COMPLETED BY J.L._ Hull ____

TELEPHONE.

@g2-393-2@79_,

l r

1.

Scheduled date for next refueling shutdown.

10/02/87 M'

4 2 '.

Scheduled date for' restart following refueling.

12/11/87 L

3.

Will refueling or resumption or operation thereafter require a l

Technical Specification change or other license amendment?

l t

l Yes Required Technical Specifications are as follows:

5.3.1, 3/4.1.1.2, 3/4.1.1.3, 3/4.2.8, 3/4.1.3.1, 3/4.3.1, 3/4.1.3.6, 3/4.3.1, 2.1.1, 3/4.2.5, 3/4.2.1, 3/4.2.4, 3/4.2.7, 3/4.3.2.

4.

Sch'eduled date for submitting proposed licensing action and l

supporting information.

July 1, 1987 5.

Important-Licensing considerations associated with refueling, e.g.

new or different fuel design or supplier, unreviewed dealgn or performance analysia methods, significant changes in fuel.

design, new operating procedurea.

a) Modification of the CPCs under the CPC Improvement Program (CIP) and the Statistical Combination of Uncertainties (SCU) Program.

b) Maximum peak pin fuel enrichment will be 4.05 w % U235.

c) The fuel vendor for the following next 5 reloads will be Combustion Engineering.

I

.->~

6

(

'I

.1 t

. REFUELING 1INFORMATION-

?

DOCKETINO.

50-528

~~~~~~'

r

. UNIT

~ PV 55 1 A

DATE

'6_976_575__5~~~~~

[!

5 COMPLETED-BY lJ.L.2Hu11____

j TELEPHONE 602-393-2679 1) h-q

'(Continued) 5

. 6.

.The number of: fuel assemblies.

.I t..

t/

a).

In the. core.

~241 1-s b)

In the. spent' fuel'atorage pool.

o

'+>

7.

' Licensed spent fuel storage capacity..

-1929

l

~

o l

Intended change in spent fuel storage capacity.

.___Hgge___

8.

Pro]ected date~of last refueling that~can be discharged to spent fuel atorage pool _aasuming present1 capacity.

-i 2006 (18 Months reloads and full core discharge capability).

i 4

l I

i L

I l

o i

i l

I l

1

-I L_-____

~

d':

f.L' t.

r

,,:,; a

,q L'

SUMMARY

OF OPERATING EXPERIENCE FOR THE h0NTE

' {

1 DOC *ET NO.

50-52@_______,

., 3 ;

4 4

UNIT PVNGS DATE 65/65~577~~~~

I COMPLETED,4Y J.L._ Hull ____>

TELEPHONE

' 602-393-2679 h

I p

^ugust_1982 n

f, 08/01 0000.

Unit at 100% Power 08/27

,1750 The Unit was shutting down to evaluate a possible Reactor Coolant. System pressure boundary leak.

1

> i 08/27 2037

' Unit-at approximately 8% power, a Reactor Trip occurred' l

L due to a CPC-ASI (Axial Shape Index) auxiliary trip.

]

- t 08/28 0604 Entered Mode.4 q

08/28 1757

. Entered Mode 5 4

08/31 0400 Entered Mode 4 08/31 1603 Entered' Mode 3

~ ;i A

4 I

,i

.i

}

<G

2 e eoe L. 3 l raeaC e 0V 9 rt r 5P 0J9 r

r euhh v l

onu C

t cSTer 6:

Coc ac oy mol. ot r ie i~

a.. t ca 0EEYE d tR x pi p ad NMTBN nc AA O

aAt oixinen TNDDH n

rrA rwR u E

EP e

e pT ( t o o

KT' TE s

v p -,

d eb CI EL u

e arI y l

oS r gb 'e ON LE a

r

' tA anir t

DU PT C

P M

ac iisu O

aCl t ss C

t ePit os iRC xupe n -

uh r

U aaasap

=

5 tn-ee nd oo A

s pC

/

na m

N ot o

i a tDc C

cufL S

ro N

tsno

- O 4

nof I

m A

t Ii

- T e

/

- a

- C t e N

F a r

U sd p

D yo t e E

SC i r R

bP yt i

h r R

xon E

8 EfEE W

1 O

- O N

0

-- P 7

R D

E 8

N L

- A 1

- S N

_ W 3

O r

D o

l T

t

a d u U

f c

onn H

oga h aa tMM

- S ne e-diR M12

- T ot I

ht n 3

3 N

t uw

-. U eh o MSD 2 n os ae H

R

)n ia l

p n

x os E

ir 4

(t t u e

ao 9

r rH 9

u l

u -

i D

a F

t ne 7

m e

p p

,inu

, ui y

F

, q T

,EM e -

pABC 2

7 e

2 t

/

a d

D 8

e l

d u ed ce 9

rh o

0 oc FS N

FS I

i P

^ !;.

NRC MONTHLY OPERATING REPORT DOCKET NO.

59-529_______.

UNIT NAME

'PVNQ@-2______

DATE 99f9@f@Z_____

COMPLETED BY-J.L._ Hull ____

TELEPHONE

@92-@9@-g@Z9_

9PEB6IINg_@I6IUg 1.

Unit Name: Palo Verde Nuclear Generating _@tationt_ Unit _2 1

2.

Reporting Period: August _19@Z 3.

Licensed Thermal Power.(MWt): :3@99 4.

Nameplate Rating (Gross MWe): 149@

5.

. Design Electrical Rating (Ne'. MWe):

1279

{

l 6.

Maximum Dependable Capacity JGross MWe): 139@

L 7.

> Maximum Dependable Capacity (det MWe):

1221 8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

l 9.

Power Level to Which Restricted, If Any (Net MWe):

_N9NE__,______

10.

Reasons For Restrictions, If Any:

l This Month Yr.-to-Date Cumulati a l'

11.

Hours in Reporting Period

___Z44____

___@@32____

___@32@___

'12.

Number of Hourc Reactor l

119.4__

__@t499 @_

Was Critical

___744.___

__4t t

13.

Reactor Reserve Shutdown Hours

_____9____

_____9_____

_____Q____

L 14.

Hours Generator On-Line

___Z44.___

__4t99Z.1__

__@t2Z4.1_

15.

Unit Reserve Shutdown Hours

_____9____

_____9_____

_____9____

16.

Gross Thermal Energy Generated (MWH) 2 @9?t@@4.

14 24@tZ@7.

22 S41t?93 t

t t

17.

Gross Electrical Energy 9@@t@QQt

_Zt914tZZ9 Generated (MWH)

__@@lt@993

_4t 18.

Net Electrical Energy

_7 495 43@

Generated (MWH)

__924 214.

_4t@5@t@99 t

t t

20.

Unit Availability Factor

~~100.0x 68.7%

75.3%

19. - Unit Service Factor

~~~

~

~~~35755~~

---.8 35~~~

166705~~

6 -------

21'.

Unit Capacity Factor 65.4%

72.8%

(Using MDC Net) 101.7%

22.

Unit Capacity Factor 62.9%

70.Ox (Using DER Net) 97.8%

- - - - _ _. 8_ %_ - - -

- - - _ 8_ _. 9_ % _ _

8 23.

Unit Forced Outage Rate


(Type, Date, and Duration 0.0%

24.

Shutdowns Scheduled Over Next 6 Months of Each):

25.

If Shutdown At End of Report Period, Estimated Date of Startup:

U~itE~In~ Teat 5tEEuA~2PEIbr~To CoEN~ercI$5~U~per~tio~n5I~~~~~~~~~~~~

~

~

~

26.

n a

Forecast Achieved

_ 4 / _1 _8 _/ 8_ 6--

INITIAL CRITICALITY 3/86 l

INITIAL ELECTRICITY

__@f@b__

_5/292@@_

COMMERCIAL OPERATION

_11/@@__

_9419/@@_

l

H ' -

3 i

3-1 i

+

p.

,i(

' AVERAGE.DA,ILYJUNIT POWER LEVEL, 0

h

.n-

{ '!

' DOCKET NO.

'50-529

}b',

.UNITi E G525~~~~~

DATE..

55255)57 ----I~~~

L COMPLETED BY J.L.

Hull'

' J TELEPHO,NE

'5652555!5575~.

~

g 4

a

'.l-

- 9us -----t'1987 MONT.H.:

Au --

DAY AVERAGE DAILY POWER LEVEL

DAY AVERAGE DAILY ' POWER LEVEL i

1 4

, 1


_1z'242 17 ------- z251 1

r 12,

sh 1-46'-<--

--- --- - ------ z2.511.-------'--------

7

' 2.

.i 3


z242 19 ------- r246

.a:

1 1.

3..

f 44. ------

z-.42------------------

20 -------1z238 1 2 i

5


z246 21 ------- z'226 1

'1 4

z.

4 Y L 124.2..-----

'22 ------.-141.09

~

1 6

1.

.s 1 2 7


2246 23 ------- 2 55'


1-46 24 ------- z246

'8 12 1

9-


.1.,246 25 ------- 4 46' 1 2 ----------------.


1-46 ---. - -------

26 ------- 1-46 1 2 1 2 10' s

"!a 11 1 ------ z246 27 -------11251-

~ 1 a \\


4 _46 -------- ------

28 1 251 3,.<

1 2_


- 2 12 4-I 13 1 251 29 ------- z2.55 1

z------------------

A.

14

1 246 ------1z251-1 z_-----------------

r251.---------------

31 ---- -- z246 1

1 -

15 i;

r 16 ------ 2255

'1 t

1


1_-

g-

'=

n y

.~:

INFORMATION

' REFUELING 4

L DOCKET NO.

59-522_______

4 UNIT.

pVNGS-2______

99fg@fg2_____:

DATE l-COMPLETED BY.

.J.L._ Hull ____

.j TELEPHONE

@g2-323-2@2p_.

')

L 1.

. Scheduled date for~next refueling shutdown.

i 02/21/88 2.

' Scheduled:datoffor restart'following refueling.

6 1'

?

d 04/30/88 j

+ !

3.

Will refueling or resumption or operation thereufter require a Technical Specificationfchange or other license amendment?

R Not Yot Determined i!

What will these be?

.- l

_Not Yet Determined

,i 1

4.

Scheduled date for submitting proposed licensing action and aupporting'information.

i i

Not Yet Determined i

1 5.

Important Licensing considerations associated with refueling, H

e.g.

new or,different fuel design or supplier, unreviewed dealgn j

or performance analyala methoda, algnificant changes'in fuel llrl design, new operating procedures.

Not Yet Determined 6.

The number of. fuel assemblies, a) in the core. ____241____

b>-

In the spent fuel storage pool.

______g______

i 7.

Licensed spent fuel storage capacity. ___1322___

Intended change in spent fuel storage capacity.

___Nggg___

]

i 8.

Projected date"of last refueling that'can be discharged to spent fuel storage pool assuming present capacity.

2006 (18 Months reloads and full core discharge capability).

l f

4

, _ - _ _ _ _.p,

w-

,; \\

- v

'l SU'MMARY OF-,OPERATINS EXPERIENCE FOR THE MONTH (t

1 DOCKET NO.

50-529 a

+

UNIT

,PV US 22 ~~~~~~

DATE ggggggg2_____

ij COMPLETED BY J.L._ Hull ____

TELEPHONE

-@g2-393-2@Z9_

~1 1

,..auguet_1ggz

.[

08/01

0000, Reactor' Power 100%

~

'08/22'

~ 2216 Reactor' Power decreased to 85% due to Surveillance Testing i

i 08/31:

'2400 Reactor Power 100>i i

l' 3

\\

l

' j.'

i Y-I i,

1 a

1

]

rk

\\

'1 L-________._

9 /H 3 i

e 2S8 5G0 5 t t

c

- x c

n N / L. 3 2 e e

e 0V9 r

r 5P0J9 r

r o"cu C

I e OEEYE d

R NMTBN n

AA O

a^t TNDDH n

E EP e

e KT TE s

v CI EL u

e ON LE a

r DU PT C

P M

O C

5 tnee nd e

oo s

e pC nase ot nl m

i a ei e

o tD cF c

C c

i r

u f L,)

u r o R

o S

t rE S

N snoL nof(

e O

4 I i m

I t st) a T

- at r1 S

r eo6 C

'e t

F a e p1 l

U 8d s

ph e0 I

D 7o u

t eSR ;

i t

i r E

8C g

bP ytH b

R u

i rt eU h

r nR i

A hx on vN x

R Ef EE(

E E

f W

O o

5 O

N P

h R

t m

e D

E n

o

%h N

L o

mr 0t A

M afh2 r

t ns mc nnf i rn S

e aS ooo N

h r

i M r

c ct neI W

3 t

Si asot t uuia4(

O r

l l an ot e2 r

D o

aamiic r f

t o

d uuot v uCt e T

f onnt ned I

f c

h aauor erat H

oga tMMACPR oPO S

ne s

e - - - -

diR n

M1 234 5

T ot o

i I

h t n N

t uw t

U eh o cu MSD d

no e

i R

ta 2

n n

r o

e i

m s

w ax a

o E

e P

)

e

)

R n

s n

d i

n i n

a e

a c

l a

lp ni p

n x

oL x

os s

E i

E

( t t &

(

i r n

s c

t u w

ee i g r

o rT r n o

ao u

t i r

rI d

f l r sner n t

i o eivEi u

D u

a R ai F e rt l l h

c yTaap S

t ngr r n nan ort oE enit osi(

t mel at i t 7

i pt el anar ep n

ninuuri re ouif gemeh y

U s q a e e pd pt T

aEMRROAOO o

e - - - - - - -

RABCDEFC!

N e

t d

a e

D l

d u ed ce rh oc FS o

N FS I

  • ~

NRC MONTHLY OPERATING REPORT DOCKET NO.

pg-5gg_______

UNIT NAME

'PyNQ@-@______

DATE 99f992g2_____

COMPLETED'BY J.L._ Hull ____

TELEPHONE 992-@93-2@Z9_

9PEBAIIN9_gIAIUg 1.

Unit Name: Pgig_ygrdg_Nuclogr_genergting_qtgtiont_ Unit _3 2.

Reporting Period: August _19@Z 3.

Licensed Thermal Power (MWt): 3 _8 0 0_

4.

Nameplate Rating (Gross MWe): 1493 5.

Design Electrical Rating (Net MWe):

AgZg 6.

Maximum Dependable Capacity (Gross MWe): 1393 7.

Maximum Dependable Capacity (Net MWe):

1221 8.

If Changes Occur In Capacity Ratings ~(Items Number 3 Through 7)

Since Last Report,.Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe):

_NgNE_________,

10.

Reasons For Restrictions, If Any:

l This Month Yr.-to-Date

' Cumulative l

11.

Hours in Reporting Period

___Z49____

___g849____

___gggg___

l 12.

Number of Hours Reactor Was Critical O

O O

~~~~~~~~~~

~~~~~~~~~~~

~~~~~~~~~~

I 19 Sggptar Reserve Shutdown Hours

_____g____

_____g_____

_____g____

14.

Hcurs Generator On-Line

_____Q____

_____g_____

_____9____

15.

Unit Reserve Shutdown Hours

_____Q____

_____g_____

_____g____

16.

Gross Thermal. Energy Generated (MWH)

__,,__9____

_____g_____

_____g____

17.

Gross Electrical Energy Generated (MWH)

_____9____

_____Q_____

_____9_;__

18.

Net Electrical Energy Generated (MWH)

_____g____

_____g_____

_____Q____

19.

Unit Service Factor

_____g____

_____g_____

_____9____

20.

Unit Availability Factor

_____g____

_____g_____

_____g____

21.

Unit Capacity Factor (Uning.MDC Net)

_____g____

_____g_____

_____g____

22.

Unit Capacity Factor (Uning DER Net)

_____g____

_.____g_____

_____9____

23.

Unit Forced Outage Rate

_____g____

_____Q_____

_____g____

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

25.

If Shutdown At End of Report Period, Estimated Date of Startup:

~

~~6o$$~r~155 6~~~r$tio~II'~~~~~~~~~~~

26.

U~ nite ~I~n~EeEt 6t$tuA~IUrior~~To ec pe n

Forecast Achieved INITIAL CRITICALITY 07/87

~~~~~~~~~

INITIAL ELECTRICITY

~67 5Y~~

~

l COMMERCIAL OPERATION

~6_975E~~

~~~~~~~~~

e 4

i f

4 AVERAGE DAILY UNIT POWER LEVEL I

DOCKET NO.

50-530 UNIT PV G5~5~~~~~~

+

DATE 69 0_5~ 5~/. _ _ _ _ _.

~~~~~

COMPLETED BY

_J_.L_.__H.u._l_l__

TELEPHONE 602_-393._-267_9__

i i

I u_9-_s ___1987 u t MO__NT..H.:

A i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE ~ DAILY POWER LEVEL 1

'O 17 ____ ___-__O_-_-__.--

2 0

18 ___ _ ___._

0__._.._____

3 0

19

____0_.

4 0

20 __. _._______0__._

5 0

21

________0_

6 O

22 __ ________O_

7 0

23 ____._______0_

{

8 0

24 _ ___

_O_

o t

I 9

0 25 __ __ ___

O ____ _______

l l

1 10 ___

_____0___

2 6

_ _ _ _ _ _ _ O _ _

11 0

27 ___ ____

_O.___

12 0

28 _____

0__

13 ___ _ ____0___

2 9 _ _

_ _ _ _ _ _ O _ _ _ _ _._

I i

14 0

30 ____ _ _

__0 l

l 15 __________0________._______

31 ___________0 16 0___

l

\\

l l

k g

0, REFUELING INFORMATION

. DOCKET NO.

5Q-5@g_______

UNIT pVNG@-@______

DATE-92f9@f@Z_____

, COMPLETED BY J L._ Hull ____

g TELEPHONE

@92-@22-2@Z2_

1.

Scheduled date for next refueling shutdown.

q 02/25/89 2.

Scheduled date for restart following refueling.

05/05/89 3.

Will refueling or resumption'or operation thereafter' require a

Technical Specification change or'other license amendment?

. hot Yet Determined What will these be?

Not Yet Determined 4.

Scheduled date for submitting proposed licensing action and supporting information.

~ Not Yet Determined 5.

Important Licensing considerations associated with refueling, 1

a.g.

new or different fuel. design or supplier, unreviewed design cnr performance analysis methods, significant changes in fuel design, new operating procedures.

Not Yet Determined 6.

The number of fuel assemblies.

a)

In the core. ____241____

b)

In the spent fuel storage pool.

______9______

7.

Licensed spent fuel storage capacity.

___1@2p___

Intended change in spent fuel storage capacity.

___Ngne___

l 8.

Pro 3ected date of last refueling that can be discharged to spent j

' fuel storage pool assuming present capacity.

2007 (18 Months reloads and full core discharge capability).

7

,?

p.

L,,; -. i j

,o

-f l.

T s

(

SUMMARY

.0F OPERATING' EXPERIENCE FOR THE MONTH' q

~.

f

~

DOCKET NO.

50-530'.

o PV 5sEs7-~~~~

P UNIT-r

-__76s7s_3_-~~~~.6s ___

_____ ' 0 I :,

DATE COMPLETED BY J.L.

Hull' TELEPHONE 56E_25_5_5_23_5_3_5_~i l.

I.

~

_A _u g u _s _t _' _19 87_ -

'l i'

.t E

08/01. '0000 Unit-in Mode 5 l

- 08/31 2400 Unit in Mode 5 a

f'1 I'

j i

o 1

I