Text
_
tg#
Arizona Nuclear Power Project.
ti P O. box 52034 e PHOENIX. ARIZONA 65072-2034 i
192-00280-JGH/TRB J
September 11, 1987 1
NRC Document Control Desk
-U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Falo Verde Nuclear Generating Station (PVNGC)
Units 1, 2 and 3 Docket Nos. STN 50-528 License Nos. NPF-41 STN 50-529 NPF-51 STN 50-530 NPF-65 August Monthly Operating Report File:
87-024-404
Dear Sirs:
Attached please find the August 1987, Monthly Operating Reports. prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A'(Technical j
Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Operating Licenses.
By copy of this letter we are also forwarding a' copy of the' Monthly Operating Reports to the Regional Administrator of
)
the Region V Office.
If you have any questions, please contact me.
Very tru y yours, fW (Hff J. G. Haynes Vice President I
Nuclear Production
{
JGH/TRB/cid cc:
- 0. M. DeMichele (all w/a)
E. E. Van Brunt, Jr.
J. B. Martin j
E. A. Licitra 1
-A. C. Gehr
]
J. A. Amenta INPO Records Center 4
2,"ABa#!BMBjIga k
.D
NRC MONTHLY OPERATING REPCRT.
DOCKET-NO.
59-52@_______
UNIT NAME P V_ N G S _ _1 _ _ _ _ _ _
DATE 99fg@f@Z_____
COMPLETED BY J.L._ Hull ____
TELEPHONE
@g2-393-2@Z9, 9EER$11Ng_@I61U@
1.-
Unit Name: Pglo_Vggdg_Nuciggr_990eE9$109_Et9$100t_M01k_1 2.
Reporting Period: _Auguat_19@Z 3.
Licensed Thermal Power (MWt): 3@gg 4..'
Nameplate' Rating (Gross MWe): 1493 5.
Design Electrical Rating (Net MWe):
12Zg 6.
Maximum Dependable Capacity-(Grosa MWe): 1@g@
7.
Maximum Dependable Capacity (Net MWe):
1221 8.
If Changes Occur In Capacity Ratings (Itema Number 3 Through 7)
Since Lost Report, Give Reasons:
_____________________________________________________QNE_________
Power Level to Which Reatricted, If Any (Net MWe):
_N 9.
10.
Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative 11.
Hours in Reporting Period
___Z44____
___Q@@2____
__1@944___
12.
Number of Houra Reactor
_9 221.5__
__3 @3@.4__
Wan Critical
.___@44 @__
3 t
- 13.. Reactor Reserve Shutdown Houra
_____g.g__
______g.g_,
_____g.g__
14.
Hours Generator On-Line
___@44t@__
__@tZ5@tg__
_@t9@Zz@__
15.
Unit Roserve Shutdown Houra
_____g.g__
______9 9__
_____9.g__
Groaa' Thermal Energy av.
Generated (MWH) 2 431 392.
13 493 9Z9.
32 3@@t122 t
1 t
t t
17.
Grona Electrical Energy 215 Zgg 399
_4t@@@t@gg.
11 Generated (MWH)
__@44 t
3 t
18.
Net Electrical Energy 492 @4@.@
1934@2 392.@'
Generated (MWH)
__Z9ZtZ11.
4 t
t t
19 '.
Unit Service Factor
___@@.@3__
____@4.43__
_____q4.33_
20.
Unit Availability Factor
___@@.@3__
____@4.43__
_____@4.33_
21.
Unit Capacity Factor (Using MDC Net)
___@Z.@3__
____@l.@$__
____@1.53_
22.
Unit Capacity Factor g
l (Using DER Net)
___@4.43__
____59.43__
____59.13_
23.
Unit Forced Outage Rate
___13.43__
____35.@3__
____25.@3_
24.
Shutdowns Scheduled Over Next 6 Montha (Type, Date, and Duration of Each): @cheduled_date_for_negt_rgfueling_ghutdown-1gf922@7 ___
Dgrgtigg_gf_rgfugligg_ghytdgwg_ggprggingtgly_Zg_dgyg___
25.
If Shutdown At End of Report Period, Estimated Date of Startup:
26.
Unite ~in~5 eat ~S t $ t u S ~ I Pr 15 E~ T S~ U$$ $ e r cI E S~ U~p$ r a t i Sn55 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
Forecast Achieved INITIAL CRITICALITY
__QL@Q__
_5225f@5_
INITIAL. ELECTRICITY
__@f@S__
_@figf@5_
COMMERCIAL OPERATION
_114@5_,
_1/2@f@@_
1 ['_' c.
,g gg-
,f
_'- i E.-
=,g
. _ r..,.
g--
s
.. 'f ', " O' s
S. j,
.'?,
t' -
..,l g.;
i
^)
t: 'l
+,<'/'"
k
'.k 4
a c.
lh? -
"s a
s
- Q.-
3 t
, y g
s; e
4:
e. a },5
.J '
.+
,v
.y *n 9, y'
-f,~
,s.
1 a
i..
...(**,;4 4.g % y,%
'(
s-g,,
v3
. /1 ;
s 4
-3 4
u
-w-t
~
e c'
' ~
' l
' AVERAGE DAILY UNIT' POWER. LEVEL l s <,. h
' x', j'
- t s.
s y
d
@i 4
- DOCKET NO.j' 50-528" q.
4.
7
~
3 U N I T _ _ _ _ _ _. _ P_ V_ N_ G_ S_ _ _1 :
_e_ _.._. '
.'Q.
e.
3 ',
- DATE,
_ _ _ 0_ 9_ _/ 0 8_ _/ 8 7_ _ _ _ _s
.gv'
. ~.
1 i
t 3E m.
.. COMPLETED BY J.L.-Hull o
~
- ' TELEPHONE ___'5_0_2_25_5_5 ~55_7_5__7~~,5 np.
y.
,m; 4
t a
s t-f
.'t I.
f "s e,
eau 9ust' - 1987~
MO__N_T.H.:
f5 t
a r
q'
+
.yi
<< DAY AVERAGE-DAILY. PO'WER LEVELS DAY AVERAGE' DAILY POWER LEVEL' 4
. x, a
1 1
- ;r -
yn
.'1 H __
___.___'_12.18 0..~. _..
^
'17:
_ _ _ _ _ _ _ _.1. 3 _ 5_5_'_
- x. s 2_
s,.
y u
a x
+.
~
m i
2'
'lz 2 _3 _8 _ _ _ _ _ _ _ _ _ _'
118 ~.
1i255-
.i-t 1
+;1
. c
- ~3 1i243.%
- 19
__ __ _ _1 2 4 7_ __ _
__ _"_ a.
A__
,r 4
2
'1 238-
-20 __ ___
____1x_247___________
4 3
N; F '
I h
6
~
d ii
/
.t 5 '. _ _ _ _ _ _ _ _ 1. 1 2_ 3 _4.'. _ _ _'_ _ _ +_ _ _
21 _ _<
12_2_4 7_ _ _ _ _ _ _. _ _ _ _.
' j i
F 6 : _ _ _ _ _ _ _ _ _1 t 2 L3_ _ _ _ _ _ _. _
22 ____ _____1,255___
l} '
. i 7
1 247 23 ____,_ _ _'____1z 2_ 5 _1 _~ _ _ _ _ _ _ _ _ _ _, T.#
.___________z______________-
f er a:
' 24 _ ____
_'_'__1 255 4
,p
. a 1 251 4
_A_.
o 1t_247 25, 9
J
______1 25_1__
2__
~yl 1 0 _ _ _ _ _ _ _ _.l z.2 2 _6 26 __.. ______1 1 51.__ _______.
2
. o..
' 1 247 -
,27.)..
.___'9__9_1___
11
_____ _1A s
. 1 2 _ _ _ _ _. _ _ _. _ _ _1 _2_4 7_ _ _ _ _ _ _ _ _ _ _-
28, ____________O_.___________.__
...y 1
g 1
.,.-f I
~~ _ _
____ 1z25.5_____ _ _ _
29 __.'.____ _
_O___
1*
^ -
,x; 1_.4 3_ ' _ _ _ _ _ _ -
.30
__ ______ O_
2_
14
____ _1 i15 __
______.1z2.5_1___________
31
________0___________1__-
A_6_3___________
9; 2_
16 ___________1 a
i-
-V 1
k*
m I
,.I_'
6 f
f(
REFUELING INFORMATION-1 DOCKET.NO.
59-52@_______
UNIT PVNGS-1______
DATE 99fgggg7_____
COMPLETED BY J.L._ Hull ____
TELEPHONE.
@g2-393-2@79_,
l r
1.
Scheduled date for next refueling shutdown.
10/02/87 M'
4 2 '.
Scheduled date for' restart following refueling.
12/11/87 L
3.
Will refueling or resumption or operation thereafter require a l
Technical Specification change or other license amendment?
l t
l Yes Required Technical Specifications are as follows:
5.3.1, 3/4.1.1.2, 3/4.1.1.3, 3/4.2.8, 3/4.1.3.1, 3/4.3.1, 3/4.1.3.6, 3/4.3.1, 2.1.1, 3/4.2.5, 3/4.2.1, 3/4.2.4, 3/4.2.7, 3/4.3.2.
4.
Sch'eduled date for submitting proposed licensing action and l
supporting information.
July 1, 1987 5.
Important-Licensing considerations associated with refueling, e.g.
new or different fuel design or supplier, unreviewed dealgn or performance analysia methods, significant changes in fuel.
design, new operating procedurea.
a) Modification of the CPCs under the CPC Improvement Program (CIP) and the Statistical Combination of Uncertainties (SCU) Program.
b) Maximum peak pin fuel enrichment will be 4.05 w % U235.
c) The fuel vendor for the following next 5 reloads will be Combustion Engineering.
I
.->~
6
(
'I
.1 t
. REFUELING 1INFORMATION-
?
DOCKETINO.
50-528
~~~~~~'
r
. UNIT
~ PV 55 1 A
DATE
'6_976_575__5~~~~~
[!
5 COMPLETED-BY lJ.L.2Hu11____
- j TELEPHONE 602-393-2679 1) h-q
'(Continued) 5
. 6.
.The number of: fuel assemblies.
.I t..
t/
a).
In the. core.
~241 1-s b)
In the. spent' fuel'atorage pool.
o
'+>
7.
' Licensed spent fuel storage capacity..
-1929
- l
~
o l
Intended change in spent fuel storage capacity.
.___Hgge___
8.
Pro]ected date~of last refueling that~can be discharged to spent fuel atorage pool _aasuming present1 capacity.
-i 2006 (18 Months reloads and full core discharge capability).
i 4
l I
i L
I l
o i
i l
I l
1
-I L_-____
~
d':
f.L' t.
r
,,:,; a
,q L'
SUMMARY
OF OPERATING EXPERIENCE FOR THE h0NTE
' {
1 DOC *ET NO.
50-52@_______,
., 3 ;
4 4
UNIT PVNGS DATE 65/65~577~~~~
I COMPLETED,4Y J.L._ Hull ____>
TELEPHONE
' 602-393-2679 h
I p
^ugust_1982 n
f, 08/01 0000.
Unit at 100% Power 08/27
,1750 The Unit was shutting down to evaluate a possible Reactor Coolant. System pressure boundary leak.
1
> i 08/27 2037
' Unit-at approximately 8% power, a Reactor Trip occurred' l
L due to a CPC-ASI (Axial Shape Index) auxiliary trip.
]
- t 08/28 0604 Entered Mode.4 q
08/28 1757
. Entered Mode 5 4
08/31 0400 Entered Mode 4 08/31 1603 Entered' Mode 3
~ ;i A
4 I
,i
.i
}
<G
2 e eoe L. 3 l raeaC e 0V 9 rt r 5P 0J9 r
r euhh v l
onu C
t cSTer 6:
Coc ac oy mol. ot r ie i~
a.. t ca 0EEYE d tR x pi p ad NMTBN nc AA O
aAt oixinen TNDDH n
rrA rwR u E
EP e
e pT ( t o o
v p -,
d eb CI EL u
e arI y l
oS r gb 'e ON LE a
r
' tA anir t
P M
ac iisu O
aCl t ss C
t ePit os iRC xupe n -
uh r
U aaasap
=
5 tn-ee nd oo A
s pC
/
na m
N ot o
i a tDc C
cufL S
ro N
tsno
- O 4
nof I
m A
t Ii
- T e
/
- a
- C t e N
F a r
U sd p
D yo t e E
SC i r R
bP yt i
h r R
xon E
8 EfEE W
1 O
- O N
0
-- P 7
R D
E 8
N L
- A 1
- S N
_ W 3
O r
D o
l T
t
- a d u U
f c
onn H
oga h aa tMM
- S ne e-diR M12
- T ot I
ht n 3
3 N
t uw
-. U eh o MSD 2 n os ae H
R
)n ia l
p n
x os E
ir 4
(t t u e
ao 9
r rH 9
u l
u -
i D
a F
t ne 7
m e
p p
,inu
, ui y
F
, q T
,EM e -
pABC 2
7 e
2 t
/
a d
D 8
e l
d u ed ce 9
rh o
0 oc FS N
FS I
i P
^ !;.
NRC MONTHLY OPERATING REPORT DOCKET NO.
59-529_______.
UNIT NAME
'PVNQ@-2______
DATE 99f9@f@Z_____
COMPLETED BY-J.L._ Hull ____
TELEPHONE
@92-@9@-g@Z9_
9PEB6IINg_@I6IUg 1.
Unit Name: Palo Verde Nuclear Generating _@tationt_ Unit _2 1
2.
Reporting Period: August _19@Z 3.
Licensed Thermal Power.(MWt): :3@99 4.
Nameplate Rating (Gross MWe): 149@
5.
. Design Electrical Rating (Ne'. MWe):
1279
{
l 6.
Maximum Dependable Capacity JGross MWe): 139@
L 7.
> Maximum Dependable Capacity (det MWe):
1221 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
l 9.
Power Level to Which Restricted, If Any (Net MWe):
_N9NE__,______
10.
Reasons For Restrictions, If Any:
l This Month Yr.-to-Date Cumulati a l'
11.
Hours in Reporting Period
___Z44____
___@@32____
___@32@___
'12.
Number of Hourc Reactor l
119.4__
__@t499 @_
Was Critical
___744.___
__4t t
13.
Reactor Reserve Shutdown Hours
_____9____
_____9_____
_____Q____
L 14.
Hours Generator On-Line
___Z44.___
__4t99Z.1__
__@t2Z4.1_
15.
Unit Reserve Shutdown Hours
_____9____
_____9_____
_____9____
16.
Gross Thermal Energy Generated (MWH) 2 @9?t@@4.
14 24@tZ@7.
22 S41t?93 t
t t
17.
Gross Electrical Energy 9@@t@QQt
_Zt914tZZ9 Generated (MWH)
__@@lt@993
_4t 18.
Net Electrical Energy
_7 495 43@
Generated (MWH)
__924 214.
_4t@5@t@99 t
t t
20.
Unit Availability Factor
~~100.0x 68.7%
75.3%
19. - Unit Service Factor
~~~
~
~~~35755~~
---.8 35~~~
166705~~
6 -------
21'.
Unit Capacity Factor 65.4%
72.8%
(Using MDC Net) 101.7%
22.
Unit Capacity Factor 62.9%
70.Ox (Using DER Net) 97.8%
- - - - _ _. 8_ %_ - - -
- - - _ 8_ _. 9_ % _ _
8 23.
Unit Forced Outage Rate
(Type, Date, and Duration 0.0%
24.
Shutdowns Scheduled Over Next 6 Months of Each):
25.
If Shutdown At End of Report Period, Estimated Date of Startup:
U~itE~In~ Teat 5tEEuA~2PEIbr~To CoEN~ercI$5~U~per~tio~n5I~~~~~~~~~~~~
~
~
~
26.
n a
Forecast Achieved
_ 4 / _1 _8 _/ 8_ 6--
INITIAL CRITICALITY 3/86 l
INITIAL ELECTRICITY
__@f@b__
_5/292@@_
COMMERCIAL OPERATION
_11/@@__
_9419/@@_
l
H ' -
3 i
3-1 i
+
p.
,i(
' AVERAGE.DA,ILYJUNIT POWER LEVEL, 0
h
.n-
{ '!
' DOCKET NO.
'50-529
}b',
.UNITi E G525~~~~~
DATE..
55255)57 ----I~~~
L COMPLETED BY J.L.
Hull'
' J TELEPHO,NE
'5652555!5575~.
~
g 4
a
'.l-
- 9us -----t'1987 MONT.H.:
Au --
DAY AVERAGE DAILY POWER LEVEL
- DAY AVERAGE DAILY ' POWER LEVEL i
1 4
, 1
_1z'242 17 ------- z251 1
r 12,
sh 1-46'-<--
--- --- - ------ z2.511.-------'--------
7
' 2.
.i 3
z242 19 ------- r246
.a:
1 1.
3..
f 44. ------
z-.42------------------
20 -------1z238 1 2 i
5
z246 21 ------- z'226 1
'1 4
z.
4 Y L 124.2..-----
'22 ------.-141.09
~
1 6
1.
.s 1 2 7
2246 23 ------- 2 55'
1-46 24 ------- z246
'8 12 1
9-
.1.,246 25 ------- 4 46' 1 2 ----------------.
1-46 ---. - -------
26 ------- 1-46 1 2 1 2 10' s
"!a 11 1 ------ z246 27 -------11251-
~ 1 a \\
4 _46 -------- ------
28 1 251 3,.<
1 2_
- 2 12 4-I 13 1 251 29 ------- z2.55 1
z------------------
A.
14
- 1 246 ------1z251-1 z_-----------------
r251.---------------
31 ---- -- z246 1
1 -
15 i;
r 16 ------ 2255
'1 t
1
1_-
g-
'=
n y
.~:
INFORMATION
' REFUELING 4
L DOCKET NO.
59-522_______
4 UNIT.
pVNGS-2______
99fg@fg2_____:
DATE l-COMPLETED BY.
.J.L._ Hull ____
.j TELEPHONE
@g2-323-2@2p_.
')
L 1.
. Scheduled date for~next refueling shutdown.
- i 02/21/88 2.
' Scheduled:datoffor restart'following refueling.
6 1'
?
d 04/30/88 j
+ !
3.
Will refueling or resumption or operation thereufter require a Technical Specificationfchange or other license amendment?
R Not Yot Determined i!
What will these be?
.- l
_Not Yet Determined
,i 1
4.
Scheduled date for submitting proposed licensing action and aupporting'information.
i i
Not Yet Determined i
1 5.
Important Licensing considerations associated with refueling, H
e.g.
new or,different fuel design or supplier, unreviewed dealgn j
or performance analyala methoda, algnificant changes'in fuel llrl design, new operating procedures.
Not Yet Determined 6.
The number of. fuel assemblies, a) in the core. ____241____
b>-
In the spent fuel storage pool.
______g______
i 7.
Licensed spent fuel storage capacity. ___1322___
Intended change in spent fuel storage capacity.
___Nggg___
]
i 8.
Projected date"of last refueling that'can be discharged to spent fuel storage pool assuming present capacity.
2006 (18 Months reloads and full core discharge capability).
l f
4
, _ - _ _ _ _.p,
w-
,; \\
- v
'l SU'MMARY OF-,OPERATINS EXPERIENCE FOR THE MONTH (t
1 DOCKET NO.
50-529 a
+
UNIT
,PV US 22 ~~~~~~
DATE ggggggg2_____
ij COMPLETED BY J.L._ Hull ____
TELEPHONE
-@g2-393-2@Z9_
~1 1
- ,..auguet_1ggz
.[
08/01
- 0000, Reactor' Power 100%
~
'08/22'
~ 2216 Reactor' Power decreased to 85% due to Surveillance Testing i
i 08/31:
'2400 Reactor Power 100>i i
l' 3
\\
l
' j.'
i Y-I i,
1 a
1
]
rk
\\
'1 L-________._
9 /H 3 i
e 2S8 5G0 5 t t
c
- x c
n N / L. 3 2 e e
e 0V9 r
r 5P0J9 r
r o"cu C
I e OEEYE d
R NMTBN n
AA O
a^t TNDDH n
E EP e
v CI EL u
e ON LE a
P M
O C
5 tnee nd e
oo s
e pC nase ot nl m
i a ei e
o tD cF c
C c
i r
u f L,)
u r o R
o S
t rE S
N snoL nof(
e O
4 I i m
I t st) a T
- at r1 S
r eo6 C
'e t
F a e p1 l
U 8d s
ph e0 I
D 7o u
t eSR ;
i t
i r E
8C g
bP ytH b
R u
i rt eU h
r nR i
A hx on vN x
R Ef EE(
E E
f W
O o
5 O
N P
h R
t m
e D
E n
o
%h N
L o
mr 0t A
M afh2 r
t ns mc nnf i rn S
e aS ooo N
h r
i M r
c ct neI W
3 t
Si asot t uuia4(
O r
l l an ot e2 r
D o
- aamiic r f
t o
d uuot v uCt e T
f onnt ned I
f c
h aauor erat H
oga tMMACPR oPO S
ne s
e - - - -
diR n
M1 234 5
T ot o
i I
h t n N
t uw t
U eh o cu MSD d
no e
i R
ta 2
n n
r o
e i
m s
w ax a
o E
e P
)
e
)
R n
s n
d i
n i n
a e
a c
l a
lp ni p
n x
oL x
os s
E i
E
( t t &
(
i r n
s c
t u w
ee i g r
o rT r n o
ao u
t i r
rI d
f l r sner n t
i o eivEi u
D u
a R ai F e rt l l h
c yTaap S
t ngr r n nan ort oE enit osi(
t mel at i t 7
i pt el anar ep n
ninuuri re ouif gemeh y
U s q a e e pd pt T
aEMRROAOO o
e - - - - - - -
RABCDEFC!
N e
t d
a e
D l
d u ed ce rh oc FS o
N FS I
- ~
NRC MONTHLY OPERATING REPORT DOCKET NO.
pg-5gg_______
UNIT NAME
'PyNQ@-@______
DATE 99f992g2_____
COMPLETED'BY J.L._ Hull ____
TELEPHONE 992-@93-2@Z9_
9PEBAIIN9_gIAIUg 1.
Unit Name: Pgig_ygrdg_Nuclogr_genergting_qtgtiont_ Unit _3 2.
- Reporting Period: August _19@Z 3.
Licensed Thermal Power (MWt): 3 _8 0 0_
4.
Nameplate Rating (Gross MWe): 1493 5.
Design Electrical Rating (Net MWe):
AgZg 6.
Maximum Dependable Capacity (Gross MWe): 1393 7.
Maximum Dependable Capacity (Net MWe):
1221 8.
If Changes Occur In Capacity Ratings ~(Items Number 3 Through 7)
Since Last Report,.Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
_NgNE_________,
10.
Reasons For Restrictions, If Any:
l This Month Yr.-to-Date
' Cumulative l
11.
Hours in Reporting Period
___Z49____
___g849____
___gggg___
l 12.
Number of Hours Reactor Was Critical O
O O
~~~~~~~~~~
~~~~~~~~~~~
~~~~~~~~~~
I 19 Sggptar Reserve Shutdown Hours
_____g____
_____g_____
_____g____
14.
Hcurs Generator On-Line
_____Q____
_____g_____
_____9____
15.
Unit Reserve Shutdown Hours
_____Q____
_____g_____
_____g____
16.
Gross Thermal. Energy Generated (MWH)
__,,__9____
_____g_____
_____g____
17.
Gross Electrical Energy Generated (MWH)
_____9____
_____Q_____
_____9_;__
18.
Net Electrical Energy Generated (MWH)
_____g____
_____g_____
_____Q____
19.
Unit Service Factor
_____g____
_____g_____
_____9____
20.
Unit Availability Factor
_____g____
_____g_____
_____g____
21.
Unit Capacity Factor (Uning.MDC Net)
_____g____
_____g_____
_____g____
22.
Unit Capacity Factor (Uning DER Net)
_____g____
_.____g_____
_____9____
23.
Unit Forced Outage Rate
_____g____
_____Q_____
_____g____
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25.
If Shutdown At End of Report Period, Estimated Date of Startup:
~
~~6o$$~r~155 6~~~r$tio~II'~~~~~~~~~~~
26.
U~ nite ~I~n~EeEt 6t$tuA~IUrior~~To ec pe n
Forecast Achieved INITIAL CRITICALITY 07/87
~~~~~~~~~
INITIAL ELECTRICITY
~67 5Y~~
~
l COMMERCIAL OPERATION
~6_975E~~
~~~~~~~~~
e 4
i f
4 AVERAGE DAILY UNIT POWER LEVEL I
DOCKET NO.
50-530 UNIT PV G5~5~~~~~~
+
DATE 69 0_5~ 5~/. _ _ _ _ _.
~~~~~
COMPLETED BY
_J_.L_.__H.u._l_l__
TELEPHONE 602_-393._-267_9__
i i
I u_9-_s ___1987 u t MO__NT..H.:
A i
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE ~ DAILY POWER LEVEL 1
'O 17 ____ ___-__O_-_-__.--
2 0
18 ___ _ ___._
0__._.._____
3 0
19
____0_.
4 0
20 __. _._______0__._
5 0
21
________0_
6 O
22 __ ________O_
7 0
23 ____._______0_
{
8 0
24 _ ___
_O_
o t
I 9
0 25 __ __ ___
O ____ _______
l l
1 10 ___
_____0___
2 6
_ _ _ _ _ _ _ O _ _
11 0
27 ___ ____
_O.___
12 0
28 _____
0__
13 ___ _ ____0___
2 9 _ _
_ _ _ _ _ _ O _ _ _ _ _._
I i
14 0
30 ____ _ _
__0 l
l 15 __________0________._______
31 ___________0 16 0___
l
\\
l l
k g
0, REFUELING INFORMATION
. DOCKET NO.
5Q-5@g_______
UNIT pVNG@-@______
DATE-92f9@f@Z_____
, COMPLETED BY J L._ Hull ____
g TELEPHONE
@92-@22-2@Z2_
1.
Scheduled date for next refueling shutdown.
q 02/25/89 2.
Scheduled date for restart following refueling.
05/05/89 3.
Will refueling or resumption'or operation thereafter' require a
Technical Specification change or'other license amendment?
. hot Yet Determined What will these be?
Not Yet Determined 4.
Scheduled date for submitting proposed licensing action and supporting information.
~ Not Yet Determined 5.
Important Licensing considerations associated with refueling, 1
a.g.
new or different fuel. design or supplier, unreviewed design cnr performance analysis methods, significant changes in fuel design, new operating procedures.
Not Yet Determined 6.
The number of fuel assemblies.
a)
In the core. ____241____
b)
In the spent fuel storage pool.
______9______
7.
Licensed spent fuel storage capacity.
___1@2p___
Intended change in spent fuel storage capacity.
___Ngne___
l 8.
Pro 3ected date of last refueling that can be discharged to spent j
' fuel storage pool assuming present capacity.
2007 (18 Months reloads and full core discharge capability).
7
,?
p.
L,,; -. i j
,o
-f l.
T s
(
SUMMARY
.0F OPERATING' EXPERIENCE FOR THE MONTH' q
~.
- f
~
DOCKET NO.
50-530'.
o PV 5sEs7-~~~~
P UNIT-r
-__76s7s_3_-~~~~.6s ___
_____ ' 0 I :,
DATE COMPLETED BY J.L.
Hull' TELEPHONE 56E_25_5_5_23_5_3_5_~i l.
I.
~
_A _u g u _s _t _' _19 87_ -
'l i'
.t E
08/01. '0000 Unit-in Mode 5 l
- 08/31 2400 Unit in Mode 5 a
f'1 I'
j i
o 1