Forwards Insp Repts 50-313/87-26 & 50-368/87-26 on 871019-23.No Violations or Deviations Noted.Rept Indicates That Util Has Not Yet Resolved self-identified Deficiencies in Corrective Action Program.Mgt Meeting Will Be Arranged
ML20234B953
Person / Time
Site: Arkansas Nuclear  
Issue date: 12/29/1987
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20234B957 List:
References
NUDOCS 8801060055
Download: ML20234B953 (3)


See also: IR 05000313/1987026

Text

_ _

,

.

. - _ _ - _ - _ - - _ _ - _ _ -

-t

.

.

.

-

-

.

,

,

,

.

-WC 29 ser

-

'

'In' Reply' Refer To:

-

Dockets:

50-313/87-26

50-368/87-26

-

,

Arkansas Power-& Light. Company

ATTN: Mr. Gene Campbell

Vice President', Nuclear

..

Operations-

P.O. Box-551

Little Rock, Arkansas

72203-

Gentlemen:

This refers'to the inspection conducted by Mr. J. R. Boardman of this office

during-the period October 19-23, 1987', of activities authorized by NRC

Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2 and

to the discussion of our findings with Mr. E. Ewing, General Manager,' Plant'

Support, and other members of your staff at the conclusion of the inspection.

The area examined during this inspection was the licensee's corrective action

program. Within this' area, the inspection consisted of selective examination _

of procedures and representative records, interviews with personnel, and

' observations by the NRC inspector. The inspection findings are documented in

the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were'.

identified.

The attached inspection report indicates that Arkansas Power & Light Company

i

has not yet resolved self-identified deficiencies in the ANO corrective action

program. These deficiencies were identified by Arkansas Nuclear One Quality

Assurance Audit QAP-10-85, issued on March 21, 1986. We are concerned that

in the 20 months since these deficiencies were identified, they have not been

fully resolved. We plan to contact you separately to arrange a management

meeting to discuss your corrective action program and the timeliness of corrective

action measures.

/

.

- N

D:

RIV:RI*

C:0PS*

C:0B*

D:DRS*

C: S

'

,

"

JRBoardman/cz WCSeidle JEGagliardo

JLMilhoan

J Jaydon

LJCallan

/ /87

/ /87

/ /87

/87

@7/d/87

12./29 /87

RECONCU

t

l

..

WCSeidl

C1

l

'

J:2/2 7/87

/

{

l

I

  • See previous concurrence

8801060055 871229

I

PDR

ADOCK 05000313

'

0

DCD

,

_^-______-

__

-__ __ .

.

.

,

. .

.

.

.

F

In Reply Refer'To:

Dockets:

50-313/87-26

50-368/87-26

i

1

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas

72203

!

Gentlemen:

l

This refers to the inspection conducted by Mr. J. R. Boardman of this office

during the period October 19-23, 1987, of activities authorized by NRC

Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2 and

to the discussion _ of our findings with Mr. E. Ewing, General Manager,' Plant

Support, and other members of your staff at the conclusion of the inspection.

The area examined during this inspection was the licensee's corrective action

program. Within this area, the inspection consisted of selective examination

of procedures and representative records, interviews with personnel, and

observations by the NRC inspector. The inspection findings are documented in

the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

The attached inspection report, and NRC Inspection Reports 50-313/87-20;

50-368/87-20 and 50-313/87-23; 50-368/87-23, indicate that Arkansas Power &

Light Company has failed to correct identified deficiencies in the AN0

corrective action program.

Deficiencies were identified by Arkansas Nuclear

One Quality Assurance Audit QAP-10-85, issued on March 21, 1986. We are

concerned that the Senior Review Committee has been aware of the problems since

the QAP was issued, but has not corrected these deficiencies in over 20 months.

You are requested to contact the Mr. J. Jaudon of this office to arrange a

management meeting for you to present your corrective action program

improvements and to discuss timeliness of corrective action measures as

identified in paragraph 2 of the attached report.

1

RIV:R1hKd

C:0PS1

C:0B

/'

C:PSA

D:DRP

,

JRBoardman/cz WCSefETb JEGag1.i rdo

ilhoan

JPJaudon

LJCallan

{

s

it/t$/87

ft/st/87 $ t3 /l8

g 87

/ /87

/ /87

{

RECONCUR WCSeidle

/ /87

l

I

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -. _ _ _ _ _

,

- .-__ _ _ ---- - - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _

-

.

..

,

l

..

.

,

.

,

L.

Arkansas Power & Light Company

-2-

l

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed By

A. B. Beach

L.-J. Callan, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-313/87-26

50-368/87-26

cc w/ enclosure:

Arkansas Nuclear One

.

i

ATTN:

J. M. Levine, Director

Site Nuclear Operations

P.O. Box 608

Russellville, Arkansas

72801

Arkansas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

R. D. Martin, RA

  • RRI

.

  • SectionChief(DRP/A)

RPSB-DRSS

  • Lisa Shea, RM/ALF
  • RIV File
  • DRP
  • MIS System
  • RSTS Operator
  • Project Engineer. DRP/A
  • G. Dick, NRR Project Manager
  • R. Hall
  • DRS
  • TSS

D. Powers

  • J.

Boardman

  • w/766

- _ _ _ _ _ _ _ - _ _ - _ _ _ _