Forwards Request for Addl Info Re 861211 Proposed Amend to Physical Security Plan,Including Rev to Existing Schedule for Safeguards Requirements to Indicate Implementation within 180 Days.Response Requested within 30 Days
ML20234A974
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/08/1987
From: Chandu Patel
Office of Nuclear Reactor Regulation
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
TAC-65430, TAC-65431, NUDOCS 8709180216
Download: ML20234A974 (4)


Text

__ ,_ -- - -

l. .

%-L' ,,

Docket Nos-- .' 50-280/281 SEP. 0 8 1987

,Mr. W.'L. Stewart Vice President:-- Nuclear Operations-

-Virginia Electric & Power Company-P. O. Box 26666t Richmond', Virginia 23261

Dear Mr. Stewart:

SUBJECT:

MISCELieNE0VS AMENDMENTS / SEARCH REQUIREMENTS SURRY POWER STATION (TAC #65430/65431)

This'is to acknowledge receipt of the Virginia Electric and Power Company.

letter, dated December 11, 1986,'which-transmitted a proposed amendment to-the Surry Power. Station Physical Security Plan, in response to the Miscel-laneous Amendments.and Search Requirements.

The submitted document has been reviewed and we have'determ'ined that additional-information and revisions to the plan are required prior to our approval. The

-enclosed comments are based upon~ pertinent NRC regulations and published guidance -!

describing methods', acceptable-to the NRC staff, for implementing specific parts 'i of those regulations.

It is requested that you provide your response to these comments'within 30 days  !

from receipt of this letter.

The reporting and/or record keeping requirements contained in this letter

, . affect-fewer than ten respondents; therefore,L OMB clearance is not required l' under P.L.96-511. ,

Should you have any questions concerning the enclosed comments, please contact the reviewer, Barry Manili, at (301) 492-7077.-

l l' Sincerely, ,

Chandu P. Patel, Project Manager Project Directorate II-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Enclosure:

DISTRIBUTION W/ ENCLOSURES:

Physical Security Plan Comments R$GB rf Sec rf BManili Buracker (2) cc w/ enclosure: Region II DMiller L See next page CPatel Docket! Files;50-280/281.

Case File NRC'PDR p

30$N $ 0 80 PDR RErickson wo/ enc 1 LBush wo/enci Local POR

. . .'f ._ .... f . ____! 1 NAME :BMa ili 7g"kd..__!..

CBurht
LBush . d :REri

.__!._on  : 1er :CPatel  :  !

DkTE [E/bh [f/8h ./bh /k/bh /[/8h h[ff/bh

s Mr. W. L. Stewart Virginia Electric and Power Company Surry Power Station cc:

Mr.' Michael W. Maupin Attorney General Hunton and Williams Supreme Court Building  !

Post Office Box 1535 101 North 8th Street Richmond, Virginia 23213 Richmond, Virginia 23219 1 i

Mr. Robert F. Saunders, Manager Surry Power Station Post Office Box 315 Surry, Virginia 23883 Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission Post Office Box 166. Route 1 Surry, Virginia 23883  !

Mr. Sherlock Holmes, Chairman Board of Supervisors of Surry County Surry County Courthouse S"try, Virginia 23683 W. T. Lough Virginia Corporation Commission l Division of Energy Regulation f Post Office Box 1197 ]

Richmond, Virginia 23209 4 l

Mr. J. T. Rhodes Senior Vice President - Power Ops.

Virginia Electric and Pcwer Company 1 Post Office Box 26666 Richmond, Virginia 23261 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 '

James B. Kenley, M.D., Commissioner Department of Health 109 Governor Street Richmond, Virginia 23219

4 'O

t. Docket Nos. 50-280/281 COMMENTS ON PHYSICAL SECURITY PLAN CHANGES (MISCELLANEOUS AMENDMENTS AND SEARCH REQUIREMENTS)

SURRY POWER STATION Revise the existing schedule for the amended safeguards requirements to indicate implementation within 180 days after Commission approval of the proposed security plan. Reference 10 CFR 73.55.

State that vital area access controls will not be dropped for life threatening situations not involving public health and safety. Clarify this on page 3-24, item #6. Reference 10 CFR 50.54(x) and (y) and Generic Letter 87-08 (Q&A #3).

Provide a commitment that the search requirements will be implemented within 60 days after Commission approval of the proposed revisions. Reference 10 CFR 73.55(d)(1).

Provide a commitment that if security force members leave the protected area to perform official duties subsequent to their initial entry and search, they will be searched prior to re-entry into the protected area if they have not been under direct observation or accompanied by another member of the security force. Delete the 2nd paragraph on page 3-14 which conflicts with the above requirement. Reference 10 CFR 73.55(d)(1) and Generic Letter 87-08 '

(Q&A #11).'

Provide a commitment to positively control, in accordance with the current approved access lists, all points of personnel and vehicle access to vital areas. Reference 10 CFR 73.55(d)(7)(1)(B).

Provide a commitment to ensure prompt access to vital equipment to accom-modate the potential need for rapid ingress or egress of individuals during emergency conditions or situations. Indicate how this prompt access will be ensured (e.g., by issuing override keys to appropriate operators and security force members at the start of each shift, or by other acceptable means).

Reference 10 CFR 73.55(d)(7)(ii) and Generic Letter 87-08 (Q&A #6).

Provide a commitment that the secondary power supply systems for both the alarm annunciator equipment and non portable communications equipment shall be located within a vital area. Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A #16).

Indicate what components of the secondary power supply system will be pro-tected as vital. Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A #18).

Provide a commitment to maintain a log indicating name, badge number, time i of entry, and time of exit of all individuals granted access to a vital area

) except those individuals entering or exiting the reactor control room.

Reference 10 CFR 73.70(d). ,

I i

1 1

1

. L

.g.

Docket Nos. 50-280/281 General Comment The January 30, 1987 exemption request, for the secondary power supply system not being protected as vital, has been discussed with site personnel. Another alternative appears to simplify the number of security upgrades needed to meet the new requirement. A response to this request is being sent under separate Cover.

[