ML20234A791
| ML20234A791 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 06/24/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20234A794 | List: |
| References | |
| NUDOCS 8707020056 | |
| Download: ML20234A791 (2) | |
See also: IR 05000498/1987026
Text
]
s
!
.A-
.
In Reply Refer To:
Dockets:
50-498/87-26
50-499/87-26
i
~
)
Hduston Lighting & Power Company
i
ATTN:
J..H. Goldberg
)
Group Vice President, Nuclear
P. O. Box 1700
Houston, Texas
77001
Gentleme~n:
.
This' refers to the inspection conducted by Messrs. W. M. Hill' D. H. Shults,
,
and D. R. Carpenter during the period April 13 through May.15,1987, .of
activities authorized by NRC Construction Permits CPPR-128 and CPPR-129 for the
3
South Texas Project, Units 1 and 2,:and to the discussion of our. findings.with-
Mr. J. D. Green and other members of your staff at'the conclusion of the
' inspection.
Areasexaminedduringthe'inspectionincludedQuality' Assurance'(QA)iPlan,
Program and Administration;. Audits; Preoperational Testing QA; Plant
Surveillance Program; Measuring and Test Equipment;. Tests and Experiments;
)
Document Control; Records; Maintenance; Design Changes and Modifications;
Procurement Control; and Receipt, Storage, and Handling of Materials and
Equipment. Within these areas, the inspection consisted of selective
"
examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspectors. The inspection findings are
j
documented in the enclosed inspection report.
During this inspection, it was found that certain of'your activities appeared
to deviate from accepted industry standards and commitments made to the NRC.'
These items.and references to the standards and commitments'are identified in-
the enclosed Notice of Deviation. You are requested to respond to these-
deviations.in writing.
Your response should'be based on.the' specifics
contained in the= Notice of Deviation enclosed'with this letter.
The response directed by this letter and the accompanying Notice-is not subject
to the clearance procedures of-the Office'of Management and Budget'as required-
by the Paperwork Reduction.Act of 1980, PL 96-511.
8707020056 070624
s
ADOCK 05000498i
G
l
!
RIV:PI
C RP
RP
f HFBundy; f
G
. stable
gliardo-
(/N/87
G/t.f/87
/pg87
.
,
.
$
,
Houston Lighting and Power Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
)
1
i
J. E. Gagliardo, Chief
I
Reactor Projects Branch
i
Enclosures:
1.
Appendix A - Notice of Deviation
i
2.
Appendix B - NRC Inspection Report
t
50-498/87-26
'
50-499/87-26
)
cc w/ enclosures:
{
Houston Lighting & Power Company
ATTN:
M. Wisenberg, Manager,
Nuclear Licensing
P. O. Box 1700
Houston, Texas
77001
Houston Lighting & Power Company
rbpra
u
ons
P. O. Box 1700
t
Houston, Texas
77001
j
Texas Radiation Control Program Director
I
bec to DMB (IE01)
i
bcc distrib. by RIV:
- RPB
DRSP
- RRI-OPS
R. D. Martin, RA
- RRI-CONST.
- Section Chief (RPB/C)
RPSC
- MIS System
- RIV File
- D. Weiss, RM/ALF
- RSTS Operator
R. Pirfo, OGC
- R. G. Taylor, RPB/C
- RSB
- Project Inspector, RPB
- R. Hall
NRR Project Manager
W. M. Hill (NRR)
- w/766