Forwards Insp Repts 50-445/87-15 & 50-446/87-12 on 870805-0902.No Violations or Deviations Noted
ML20234A788
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/09/1987
From: Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20234A790 List:
References
NUDOCS 8709180132
Download: ML20234A788 (4)


See also: IR 05000445/1987015

Text

, .

.

-4

In Reply Refer To: SEP - 91907

Dockets: 50-445/87-15 l

50-446/87-12

TU Electric

ATTN: Mr. William G. Counsil

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, Texas 75201

Gentlemen:

This refers to the inspection conducted by Mr. H. S. Phillips of

the Comanche Peak Project Division during the period August 5

through September 2, 1987, of activities authorized by NRC

Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak

Steam Electric Station, Units 1 and 2, and to the discussions of

our findings with'you Mr. L. D. Nace, Vice President, Engineering

and Construction, and other members of your staff during and at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

inspector.

Within the scope of the inspection, no violations or deviations

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

bRIGINAL SIGNED BY E. F. WUUCT

R. F. Warnick, Assistant Director

for Inspection Programs

Comanche Peak Project Division

Office of Special Projects

Enclosure:

Inspection Report

50-445/87-15; 50-446/87-12

OSP:CPPD:IP: SRI AD:IP repg)

SPhillipsT RWarn.i.ck

9/9/87 T- 9/ 9 /87

8709180132 870909

PDR ADOCK 05000445

G PDR

_ _ _ _ _ _ _ - - _ _ - - -

'

' un

'

p ,

'o UNITED STATES

!

o NUCLEAR REGULATORY COMMl:MION

$ WASHINGTON, D. C. 20655

^*g jf

..... SEP - 9 ISET

In Reply' Refer To:

Dockets: 50-445/87-15

50-446/87-12

TU Electric

-ATTN: Mr. William G. Counsil

Executive Vice President

400 North-Olive Street, Lock Box 81

Dallas, Texas 75201

Gentlemen:

This refers to the inspection conducted by Mr. H. S. Phillips of

the Comanche Peak Project Division during the period August 5

through September 2, 1987, of activities authorized by NRC

Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak

Steam Electric Station, Units 1 and 2, and to the discussions of

our findings with Mr. L. D. Nace, Vice President, Engineering and

Construction, and other members of your staff during and at the

. conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the inspection

consisted of selective examination of procedures and representative

<

records, interviews with personnel, and observations by the

inspector.

Within the scope of the inspection, no violations or deviations

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

(?Fk)annisk

. R. F. Warnick, Assistant Director

j for Inspection Programs

'

Comanche Peak Project Division

Office of Special Projects

Enclosure:

Inspection Report

i 50-445/87-15; 50-446/87-12

.

. TU Electric 2

i

cc w/ enclosure:  :

TU Electric Bureau of Radiation Control

ATTN: G. S. Keeley, Manager State of Texas

Nuclear Licensing 1100 West 49th Street l

Skyway Tower Austin, Texas 78756 l

400 North Olive Street, L.B. 81

Dallas, Texas 75201 Nancy H. Williams

CYGNA Energy Services  ;

'

Juanita Ellis Suite 390

President - CASE 2121 N. California Blvd

1426 South Polk Street Walnut Creek, CA 94596

Dallas, Texas 75224

Renea Hicks, Esq.

Assistant Attorney General

Environmental Protection Division ,

P.O. Box 12548, Capitol Station '

Austin, Texas 78711-2548

Administrative Judge Peter Bloch ,

U.S. Nuclear Regulatory Commission j

Washington, D.C. 20555 i

!

Elizabeth B. Johnson l

Administrative Judge

Oak Ridge National Laboratory

Post Office Box X, Building 3500

Oak Ridge, Tennessee 37830 '

Dr. Kenneth A. McCollom j

1107 West Knapp 1

Stillwater, Oklahoma 74075 f

Dr. Walter H. Jordan

Administrative Judge

881 West Outer Drive

Oak Ridge, Tennessee 37830

I

. Anthony Z. Roisman, Esq.  ;

Suite 600

1401 New York Avenue, N.W. I

Washington, D.C. 20005 '

Ms. Billie Pirner Garde, Esq.

Government Accountability Project l

Midwest Office '

104 East Wisconsin Avenue

Appleton, Wisconsin 54911

l

l

, _ - - _ _

- .

.

,

l DISTRIBU" ION:

i

, n Docket F;.les.(502445/446)TNRC:'PDR:

D

'~#' ' ""-

. Local ~ PDR"~'

CPPD Reading (HQ)

  • Site Reading
  • CPRT Group
  • SRI-OPS
  • SRI-CONST
  • MIS System

/. *RSTS Operator

RPB

RIV File

  • DWeiss, RM/ALF

JKeppler/JAxelrad

CIGrimes

PFMcKee

HSchierling

JLyons

LChandler, OGC

CPPD-LA, OSP

  • w/766

l

1

l

4

_ _ _ - _ - - I