8/21/2020 - Category 3 Public Meeting NRC Presentation Proposed Rule to Incorporate by Reference the 2019 and 2020 Edition'S of American Society of Mechanical Engineers Codes Into 10 CFR 50.55a
ML20230A012
Person / Time
Issue date: 08/21/2020
From: Victoria Huckabay, Joseph Lopez
NRC/NMSS/DREFS/RRPB
To:
Huckabay, Victoria
References
10 CFR 50.55a, 10 CFR Part 50, ASME 2019-2020, NRC-2017-0225, NRC-2018-0290, RIN 3150-AK22
Download: ML20230A012 (38)


Text

ADAMS Accession No. ML20230A012 Proposed Rule to Incorporate by Reference the 2019 and 2020 Editions of ASME Codes into 10 CFR 50.55a August 21, 2020

Agenda

  • Purpose and Overview
  • Open Discussion 2

Purpose and Overview Victoria Huckabay Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards 3

Purpose of Meeting

  • Preliminary NRC views regarding rulemaking to incorporate by reference ASME 2019 and 2020 Editions
  • NRC will consider information and perspectives discussed today when developing the proposed rule, but the NRC will not prepare written responses 4

Two Ongoing Rulemakings

1. Proposed Rule: Incorporate by reference ASME Code Case regulatory guides (RGs)

(RIN 3150-AJ94, Docket ID NRC-2017-0025)

- RG 1.84, Rev. 39

- RG 1.147, Rev. 20

- RG 1.192, Rev. 4

2. Proposed Rule: Incorporate by reference ASME BPV/OM 2019 - 2020 Code Editions (RIN 3150-AK22, Docket ID NRC-2018-0290) 5

Rulemaking Process IBR 2019 - 2020 Editions IBR Code Case RGs Identify Regulatory Proposed Final Rule need for (Technical) Rule rulemaking Basis It has been

  • Foundation of
  • Draft rule text *Final rule text NRCs practice to effective use ASME codes rulemaking
  • Public meeting to establish
  • 60 day public requirements for comment period nuclear power plants.

Opportunities for public participation 6

Timeline -

Code Case RG Rulemakings Publication ASME BPV Code Case NRC Proposed Rule NRC Final Rule RG 1.84 RG 1.147 RG 1.192*

Year Supplements 2007 0 1 2 3 72 FR 71750 (12/19/2007) Rev. 34 Rev. 15 2008 4 5 6 7 2009 8 9 10 11 0 74 FR 26303 (6/2/2009) 2010 1 2 3 4 75 FR 61321 (10/5/2010) Rev. 35 Rev. 16 2011 5 6 7 8 2012 9 10 11 2013 0 1 2 3 78 FR 37886 (6/24/2013) 2014 4 5 6 7 79 FR 65776 (11/5/2014) Rev. 36 Rev. 17 Rev. 1 2015 0 1 2 3 4 2016 5 6 7 81 FR 10780 (3/2/2016) 2017 0 1 2 3 2018 4 5 6 7 83 FR 40685 (8/16/2018) 83 FR 2331 (1/17/2018) Rev. 37 Rev. 18 Rev. 2 2019 0 1 2 3 2020 4 Target date: Fall 2020 84 FR 14736 (3/16/2020) Rev. 38 Rev. 19 Rev. 3 2021 Target date: late 2021 Rev. 39 Rev. 20 Rev. 4

  • Scope of RG 1.192 Revisions (OM Code Editions/Addenda)
  • Rev. 1: 2004 Edition, 2006 Addenda
  • Rev. 2: 2009 Edition, 2011 Addenda, 2012 Edition
  • Rev. 3: 2015 Edition, 2017 Edition
  • Rev. 4: 2020 Edition 7

2020 ASME Code Case Proposed Rule - Schedule

  • Proposed rule estimated publication in the Federal Register: Fall 2020

- Public Comment period: 60 calendar days

  • NRC will consider all public comments submitted to the docket

- www.regulations.gov, Docket ID (NRC-2017-0025)

  • Target date to publish final rule in the Federal Register by the end of 2021 8

Timeline -

Edition/Addenda Rulemakings Publication ASME BPV Code ASME OM NRC Proposed Rule NRC Final Rule Year 2005 2005 Addenda 2005 Addenda 2006 2006 Addenda 2006 Addenda 2007 2007 Edition 72 FR 16731 (4/5/2007) 2008 2008 Addenda 73 FR 52730 (9/10/2008) 2009 2009 Addenda 2009 Edition 2010 2010 Edition 75 FR 24324 (5/4/2010) 2011 2011 Addenda 2011 Addenda 76 FR 36232 (6/21/2011) 2012 2012 Edition 2013 2013 Edition 2014 2015 2015 Edition 2015 Edition 80 FR 56820 (9/18/2015) 2016 2017 2017 Edition 2017 Edition 82 FR 32934 (7/18/2017) 2018 83 FR 56156 (11/9/2018) 2019 2019 Edition 2020 2020 Edition Target: late 2020 85 FR 26540 (5/4/2020)*

2021 2022 Target: early 2022

  • Correction Notice was published in 85 FR 34087 (6/3/2020) 9

Scope of ASME 2019-2020 Editions Rulemaking

  • Incorporate by reference the 2019 Edition of Section III, Division 1, of ASME BPV Code

- One new condition being considered

- Five revised conditions being considered

  • Incorporate by reference the 2019 Edition of Section XI, Division 1, of ASME BPV Code

- Three new conditions being considered

- Amending seven existing conditions being considered

- One condition is being considered for removal 10

Scope of ASME 2019-2020 Editions Rulemaking (contd)

  • Incorporate by reference the 2020 Edition of ASME OM

- One new condition being considered

- Amending six existing conditions being considered

- One condition is being considered for removal 11

Scope of ASME 2019-2020 Editions Rulemaking (contd)

  • Propose to add new conditions:

- One new condition on Section III rules

- Three new conditions on Section XI rules

- One new condition on OM Code rules

  • The NRC staff will discuss the proposed conditions in more detail later in this presentation.

12

ASME 2019-2020 Editions RulemakingSchedule

  • Publish proposed rulemaking in the Federal Register by the end of 2020
  • 60 days to submit public comments
  • NRC will consider public comments submitted on the docket

- Docket ID (NRC-2018-0290)

  • Target date to publish final rule in the Federal Register: early 2022 13

ASME Section III Conditions under Consideration Dr. Chakrapani Basavaraju Division of Engineering and External Hazards Office of Nuclear Reactor Regulation 14

Section III New Condition

  • Section III Condition: Preservice Inspection of Steam Generator Tubes. Applicants or licensees applying the provisions of NB-5283 and NB-5360 in the 2019 Edition of Section III, must apply paragraphs (b)(1)(xiii)(A) through (B) of this section.

(A) First provision. When applying the provisions of NB-5283 in the 2019 Edition of Section III, a full-length preservice examination of 100 percent of the steam generator tubing in each newly installed steam generator must be performed prior to plant startup.

15

Section III New Condition (contd)

  • Section III Condition: Preservice Inspection of Steam Generator Tubes. (contd)

(B) Second provision. When applying the provisions of NB-5360 in the 2019 Edition of Section III, flaws revealed during preservice examination of steam generator tubing performed in accordance with paragraphs (b)(1)(xiii)(A) must be evaluated using the criteria in the design specifications.

16

Section III Revised Conditions

  • Section 50.55a(b)(1)(ii): Section III Condition: Weld leg dimensions

- Subparagraphs NB-3683.4(c)(1) and NB-3683.4(c)(2):

Condition Applicable to 1989 Addenda through the latest Edition.

- Note 11 to Table NC-3673.2(b)-1 and Note 11 to Table ND-3673.2(b)-1: Condition Applicable to 2011 Addenda through the latest Edition.

  • Section 50.55a(b)(1)(iii): Section III, Condition: Seismic design of piping

- Applicable to 2006 Addenda through all Editions and addenda up to and including the latest Edition.

17

Section III Revised Conditions (contd)

  • Section 50.55a(b)(1)(vii): Section III, Condition: Capacity certification and demonstration of function of incompressible-fluid pressure-relief valves

- Applicable to 2006 Addenda through all Editions and addenda up to and including the latest Edition.

  • Section 50.55a(b)(1)(x): Section III Condition: Visual examination of bolts, studs, and nuts

- Provisions are applicable to 2017 and later Editions of Section III.

18

ASME Section III and XI Conditions under Consideration (Quality Assurance)

Raju Patel Division of Reactor Oversight Office of Nuclear Reactor Regulation 19

Section III Revised Condition

  • The NRC is proposing to:

- Revise§ 50.55a(b)(1)(iv)Section III condition: Quality Assurance 1820 20

Section III Revised Condition (contd)

  • Revise§50.55a(b)(1)(iv)Section III Condition: Quality Assurance

- The NRC is proposing to revise this condition to allow the use of the 2015 Edition of NQA-1 referenced in the 2019 Edition of the ASME BPV Code,Section III, Subsection NCA, Article 7000, which this rule is also incorporating by reference.

- When implementing the 2019 Edition of ASME B&PV Code Section III, applicants and licensees may use the 2017 Edition of ISO/IEC 17025 until a new guidance is endorsed by the NRC, officially recognizing the 2017 Edition of ISO/IEC 17025.

21

Section XI Revised Condition

  • The NRC is proposing to:

- Revise§ 50.55a(b)(2)(x)Section XI condition:

Quality Assurance 1822 22

Section XI Revised Condition (contd)

  • Revise§ CFR 50.55a(b)(2)(x)Section XI condition: Quality assurance

- The NRC is proposing to revise this condition to approve for use the version of NQA-1 referenced in the 2019 Edition of the ASME BPV Code,Section XI, Table IWA 1600-1, Referenced Standards and Specifications, which this proposed rule is also incorporating by reference. This will allow licensees to use the NQA-1-2008 Edition, NQA-1a-2009 and NQA-1b-2011 Addenda to NQA-1-2008 Edition, NQA-1-2012 and NQA-1-2015 Editions when using the 2019 and later Editions of Section XI.

- Also is being revised to remove the reference to IWA-1400. This revision clarifies the condition because the editions of NQA-1 are referenced in Table IWA 1600-1 instead of IWA-1400.

23

ASME Section XI Conditions under Consideration Keith Hoffman Division of New and Renewed Licenses Office of Nuclear Reactor Regulation 24

Section XI Revised Conditions

  • Section 50.55a(b)(2)(xviii)Section XI condition: NDE personnel certification:

- NDE personnel certification based on results of research to provide options

  • Level I - 175 hours0.00203 days <br />0.0486 hours <br />2.893519e-4 weeks <br />6.65875e-5 months <br /> experience, 125 experience/50 lab practice
  • Level II - 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> experience, 400 experience/320 lab practice and successful completion of Appendix VIII, Supplement 2 detection and length sizing
  • Section 50.55a(b)(2)(xxv)Section XI condition: Mitigation of defects by modification:

- Mitigation of defects by modification providing options for future examinations and eliminating some timing aspects 25

Section XI Revised Conditions (contd)

  • Section 50.55a(b)(2)(xxvi)Section XI condition: Pressure testing Class 1, 2 and 3 mechanical joints:

- Considering the revision or elimination of condition

Nonmandatory Appendix R:

- Allow use of 2017/2019 Editions Supplement 2 without submittal

Summary report submittal:

- Summary report submittal extended to 120 days 26

Section XI Revised Conditions (contd)

Prohibitions on use of IWB-3510.4(b):

- Considering the prohibition of use of IWB-3510.4(b),

IWC-3510.5(b), and Tables A-4200-1 and G-2110-1 27

Section XI New Conditions

  • Regulatory Submittal Requirements

- Requires submittal to NRC of analysis performed in accordance with IWB-3720(a), A-4200(c), and G-2110(c)

  • Use of Subsequent Editions and Addenda with Code Cases

- Clarifies that no additional approval is required to use later editions/addenda referenced in an approved code case

- Clarifies treatment of operational leakage found in Class 1, 2, 3, MC, RISC-1, or RISC-3 components 28

Section XI Removing Conditions

  • Section 50.55a(b)(2)(xv)(L) Specimen set and qualification: Twelfth provision:

- Appendix VIII, Supplement 8 Condition 29

ASME OM Code Robert Wolfgang Division of Engineering and External Hazards Office of Nuclear Reactor Regulation 30

Specific OM Items of Interest in Proposed Rulemaking

  • Remove condition on use of Subsection ISTB in 2011 Addenda of ASME OM Code based on removal of incorporation by reference in 10 CFR 50.55a.

31

Specific OM Items of Interest in Proposed Rulemaking

  • Incorporate by reference Subsection ISTE in 2020 Edition of ASME OM Code without conditions.

32

Specific OM Items of Interest in Proposed Rulemaking

  • In light of removal of IST Program Plan submittal requirement from 2020 Edition of ASME OM Code, add 10 CFR 50.55a(f)(7) to require nuclear power plant applicants and licensees to submit IST Plans and interim IST Plan updates related to pumps and valves, and IST Plans and interim Plan updates related to snubber examination and testing, to NRC.
  • Consideration of proposed relaxation of the interval for position verification testing required in ISTC-3700 for valves that are not susceptible to stem-disk separation.

33

How to get involved?

To find information about Search for docket ID ASME 2019-2020 rulemaking NRC-2018-0290 ASME Code Case RGs rulemaking NRC-2017-0025 34

Questions & Comments ASME 2019-2020 Rulemaking Victoria Huckabay, Project Manager Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Email: Victoria.Huckabay@nrc.gov Phone:ASME 301-415-1325 2020 Code Case Rulemaking Juan Lopez, Project Manager Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Email: Juan.Lopez@nrc.gov 35

How did we do?

  • Link to NRC Public Meeting Feedback form:

36

Acronyms ADAMS Agencywide Documents Access and Management System ASME American Society of Mechanical Engineers BPV Boiler and Pressure Vessel CFR Code of Federal Regulations FR Federal Register IBR Incorporation by Reference ISI Inservice Inspection IST Inservice Testing NDE Non-destructive Evaluation NRC Nuclear Regulatory Commission OM Operation and Maintenance 37

Acronyms (contd)

RG Regulatory Guide RIN Regulation Identifier Number RISC Risk-Informed Safety Class 38