Forwards Amend 14 to Ufsar,Updated Fire Protection Rept, 10CFR50.59 Summary Rept & Commitment Summary Rept.Amend Includes Effects of Changes Made to Facility or Procedures as Described in Ufsar.W/O Fire Protection & Summary Repts
ML20217Q803
Person / Time
Site: Sequoyah  
Issue date: 05/04/1998
From: Bajestani M
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217Q805 List:
References
GL-86-10, NUDOCS 9805110115
Download: ML20217Q803 (3)


Text

__. _ _ _ _ _ _ _ _

L h

' Tennessee VaBey Authority, Post Office Box 2000, Soddy Dasy, Tennessee 37379-2000 r

Masoud Bajestani Site Vice President

=

Sequoyah Nuclear Plant May 4, 1998 10 CFR 50.71(e) 10 CFR 50.59 (b) (2)

U.S. Nuclear Regulatory Commission E

ATTN:

Document Control Desk Washington, D.C.

.20555 Gentlemen:

In~the Matter of

)

Docket Nos. 50-327 y

Tennessee Valley Authority

)

50-328

~ SEQUOYAH NUCLEAR PLANT (SQN) - UPDATED FINAL SAFETY ANALYSIS REPORT (UFSAR) AMENDMENT 14, UPDATED FIRE PRCTECTION REPORT, 10 CFR 50.59 SUntARY REPORT, AND COM(ITHENT SUtefARY REPORT In accordance with 10 CFR 50.71(e), this letter provides the signed original and 10 copies of the changed page associated with Amendment 14 to SQN's UFSAR.

In accordance with NRC Generic Letter 86-10, TVA has also enclosed copies of the changed pages to SQN's

{

updated Fire Protection Report.

Amendment 14 to SON's UFSAR includes the effects of:

changes made to the facility or procedures as described in the UFSAR; safety evaluations performed in support of license amendments or that support conclusions that changes did not involve an unreviewad safety question; and analyses of new safety issues performed by or on behalf of SON at the Commission's request.

The updated information reflects changes between June 11, 1996, and November 4, r

1997.

=

n v., -

Jt U v b 1. Ten complete sets-(Volumes 1 through 12) of SON's Amendment 13 to the UFSAR were submitted to you by letter dated March 25, 1998.

Following the issuance of Amendment 13, TVA discovered printing and

-pagination errors that occurred during the Amendment 13 reproduction process.

Correction pages for Amendment 13 are provided in In order to ensure these UFSAR pages are filed in their' proper order, TVA recommends filing the correction pages provided in' Enclosure 4 prior to filing the Amendment 14 pages provided in Enclosure 5 G.8 w 6..s 9805110115 980504 7

- l<

K PDR

'l i

U.S' Nuclear Regulatory Commission Page 2 May 4, 1998 i

In =ddition to the UFSAR, this letter provides the summary report of the' implemented safety evaluations performed in accordance with 10 CFR 50.59 (b) (2).

This report covers the same period from June 11,.1996, to November 4, 1997-Several safety evaluation summaries that were implemented'after November 4, 1997, have been included to address FSAR changes incorporated by Amendment 14.

TVA.is~also providing SON's Commitment Summary Report.

This report sunnarizes docketed commitments that TVA has evaluated and revised j

using the NRC endorsed Nuclear Energy Institute's (NEI) " Guideline J

For Managing NRC Commitments," as codified in SPP-3.3, "NRC

)

. Commitment Management." The report'is broken into two sections, i

The first section contains commitment changes approved since SPP-3.3 was issued in January 1997 to November 4, 1997 The second section contains commitment changes made prior to January 1997 utilizing the available NEI. guidelines. provides'the Updated Fire Protection Report change pages. provides the 10 CFR 50.59 Summary Report. provides the Commitment Summary Report.

.provides the correction pages associated with Amendment 13, and.provides the Amendment 14 UFSAR change pages.

I certify that I am a duly authorized officer of TVA and that, to

-the best of my knowledge and belief, the information contained herein accurately presents changes made since the previous submittals up to six months before this submittal date, which is necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirements.

If you should have any quescions, please contact me at (423):843-7001 or Pedro Salas at (423) 843-7170.

Sincerely, 1

3 h)

(b s

^

/

y Masoud Baje tani j

' Enclosures cc:

See page 3

.?) i

-2

U.S. Nuclear Regulatory Commission Page 3 May 4,-1998 cc:

Mr. R. W.'Hernan, Project Manager (w'/ Enclosures )

Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional,'.dministrator (w/ Enclosures)

U.S. Nuclear hegulatory Commission Region II Atlanta Federal Center 61 Forsyth St.,

SW, Suite 23T85 Atlanta, Georgia 30303-3415

.