ML20217Q700
| ML20217Q700 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 05/04/1998 |
| From: | Skay D NRC (Affiliation Not Assigned) |
| To: | Kingsley O COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20217Q702 | List: |
| References | |
| TAC-MA0186, TAC-MA0187, TAC-MA186, TAC-MA187, NUDOCS 9805110008 | |
| Download: ML20217Q700 (4) | |
Text
e
~
May 4, 1998 Mr. Oliver D. Kingsley, Presiden't.
Nuclear Generation Group i.
Commonwealth Edison Company
' Executive Towers West 111 ~
~ 1400 Opus Place, Suite 500 Downers Grove,IL 60515 i
SUBJECT:
SAFETY EVALUATION RELATING TO CONTAINMENT LEAK CHASE -
CHANNELS FOR LASALLE COUNTY STATION, UNITS 1 AND 2 (TAC NOS.
. MA0186 AND MA0187)
Dear Mr. Kingsley:
h By letter dated November 26,1997, as supplemented on February 20 and April 7,1998, Commonwealth Edison Company (Comed, the licensee) submitted for staff review its justifk:ation for performing containment integrated leak rate tests (ILRT) with the leak chase channel plugs -
installed. The NRC staff has reviewed Comed's proposal and found it reasonable. Therefore,
= the NRC staff accepts Comed's request to leave the leak chase channels plugged during the performance of the containment ILRT, with the exception of 18 specific leak chase channels in the pressure suppression pool of each unit that could not be demonstrated to maintain their integrity during a postulated design basis accident. Plugs in these 18 leak chase channels are to
' be permanently removed and an initial local leak rate test will be performed on each channel to demonstrate the integrity of the underlying containment liner weld. For Unit 1, this has been completed. For Unit 2, this will be done prior to startup from the current refuel outage, L2RO7.
For the leak chase channels that will remain plugged, Comed should perform a visual inspection of the outside and inside surfaces of the containment, the venting plugs, and the leak chase channels before performing Type A containment ILRT to insure the structuralintegrity of the j-containment liner system and the concrete. Our safety evaluation is enclosed.
Sincerely, ORIG. SIGNED BY:
Donna M. Skay, Project Manager Project Directorate Ill-2 9905110000 990504 Division of Reactor Projects - lil/IV yDR ADOCK 0 3
Office esf Nuclear Reactor Regulation Docket Nos. 50-373, 50-374 i
l
Enclosure:
Safety Evaluation cc w/ encl: See next page h% h$$17 I
Distribution:
Docket File :
PUBLIC PDlli-2 r/f E. Adensam, EGA1
- S. Richards C. Moore.
D. Skay OGC,015818
. ACRS, T2E26 D. Hills, Rlli.
C..P. Tan
\\\\
- concurrence provided by mema dated 4/24/98; no major revisions c DOCUMENT NAME:G:\\CMNTSP\\LASALLE\\LA0186.SE y
To receive e copy of this document,IndiceM' bog "C* = Copy without enclosures *E' = Copy with enclosures "N" = No copy
,9 OFFICE PM:PDIll-2, Cs L.A:IN11p 2' L46ECGB D:PDill-2 C.
i)
NAME DSKAS F -
UN9DRil GBAGCHI
- SRICHARDSW DATE 05/ \\ /98 05/ l /93 04/24/98 05/ Q /98 OFFICIAL RECORD COPY
%)&
k1 Ef 2
[
kl UNITED STATES
~
}
NUCLEAR REGULATORY COMMISSION g
e WASHINGTON, D.C. 3086H001
%,...../
t May'4, 1998 Mr. Oliver D. Kingsley, President Nuclear Generation Group -
Commonwealth Edison Company-Executive Towers West lli 1400 Opus Place, Suite 500 Downers Grove, IL 60515 8UBJECT:
SAFETY EVALUATION RELATING TO CONTAINMENT LEAK CHASE CHANNELS FOR LASALLE COUNTY STATION, UNITS 1 AND 2 (TAC NOS.
MA0186 AND MA0187)
Dear Mr. VJngsley:
By letter dated November 26,1997, as supplemented on February 20 and April 7,1998, Commonwealth Edison Company (Comed, the licensee) submitted for staff review its justification for performing containment integrated leak rate tests (ILRT) with the leak chase channel plugs installed. The NRC staff has reviewed Comed's proposal and found it reasonable.. Therefore, the NRC staff accepts Comed's request to leave the leak chase channels plugged during the performance of the containment ILRT, with the exception of 18 specific leak chase channels in the pressure suppression pool of each unit that could not be denionstrated to maintain their integrity during a postulated design basis accident. Plugs in these 18 leak chase channels are to be permanently removed and an initial local leak rate test will be performed on each channel to demonstrate the integrity of the underlying containment liner weld. For Unit 1, this has been compleied. For Unit 2, this will be done prior to startup from the current refuel outage, L2RO7.
For the leak chase channels that will remain plugged, Comed should perform a visualinspection of the outside and inside surfaces of the containment, the venting plugs, and the leak chase channels before performing Type A containment ILRT to insure the structuralintegrity of the -
containment liner system and the concrete. Our safety evaluation is enclosed.
Sincerely,,
w Donna M. Skay, Project nager Project Directorate lil-2 Division of Reactor Projects - fil/lV Office of Nuclear Reactor Regulation Docket Nos. 50-373, 50-374
Enclosure:
Safety Evaluation ccw/ encl: See next page
l O. Kingsley LaSalle County Station Commonwealth Edison Company Units 1 and 2 cc:
1 Phillip P. Steptoe, Esquire Michael 1. Miller, Esquire Sidley and Austin Sidley and Austin One First National Plaza One First National Plaza Chicago, Illinois 60603 Chicago, Illinois 60603 Assistant Attomey General Document Control Desk-Licensing 100 W. Randolph St. Suite 12 Commonwealth Edison Company Chicago, Illinois 60601 1400 Opus Place, Suite 400 Downers Grove, Illinois 60515 U.S. NRC-LaSalle Resident inspectors Office 2605 N. 21st Road Commonwealth Edison Company Marseilles, Illinois 61341-9756 Site Vice President - LaSalle j
2601 N. 21st Road Chairman Marseilles, Illinois 61341-9757 LaSalle County Board of Supervisors LaSalle County Courthou.se Mr. Cavid Helwig Ottawa, Illinois 61350 Senior Vice President l
Commonwealth Edison Company l
' Attomey General Executive Towers West 111 l
500 S. Second Street 1400 Opus Place, Suite 900 Springfield, Illinois 62701 Downers Grove,IL 60515 Chairman Mr. Gene H. Stanley lilinois Commerce Commission PWR's Vice President i
527 E. Capitol Avenue, Leland Building Commonwealth Edison Company i
Springfield, Illinois 62706 Executive Towers West ill 1400 Opus Place, Suite 900 lilinois Department of Nuclear Safety Downers Grove,IL 60515 Office of Nuclear Facility Safety 1035 Outer Park Drive Mr. Steve Perry 4
Springfield, Illinois 62704 BWR's Vice President l.
Commonwealth Edison Company l
Regional Administrator Executive Towers West lli U.S. NRC, Region ill 1400 Opus Place, Suite 900 l
801 Warrenville Road Downers Grove, IL 60515 Lisle, Illinois 60532-4351 Mr. Dennis Farrar Commonwealth Edison Company Regulatory Services Manager l
LaSalle Station Manager Commonwealth Edison Company l
2601 N. 21st Road Executive Towers West lil l
Marseilles, Illinois 61341 9757 1400 Opus Place, Suite 500 Downers Grove,IL 60515 Robert Cushing, Chief, Public Utilities Division Illinois Attomey General's Office 100 W. Randolph Street Chicago, Illinois 60601
~
O. Kingsley LaSalle County Station Commonwealth Edison Company Units 1 and 2 l
Ms. Irene Johnson, Licensing Director l
Nuclear Regulatory Services Commonwealth Edison Company l
5xecutive Towers West 111 1400 Opus Place, Suite 500 Downers Grove, IL 60515 Commonwealth Edison Company Reg. Assurance Supervisor-LaSalle
.2601 N. 21st Road Marseilles, Illinois 61341-9757 Mr. Michael J. Wallace Senior Vice President Commonwealth Edison Company Executive Towers West lil 1400 Opus Place, Suite 900 Downers Grove,IL 60515 l
l l
l