ML20217Q485

From kanterella
Jump to navigation Jump to search
Forwards DPC CNS Tabulation of Number of Personnel & Person-REM by Work & Job Function for 1997, IAW TS 6.9.1.5(a).Plant Did Not Exceed Specific Activity Limit During CY97
ML20217Q485
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/26/1998
From: Gordon Peterson
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217Q487 List:
References
NUDOCS 9803120259
Download: ML20217Q485 (1)


Text

4 l

,m Duke Power Company j, k A Lu Ewy Capaq 6U Catawba Nudear Station

" "p %

4800 Concord Road

. . York. SC 79745 Gnry R. Peterson (803) 831-4251 omCE Vice Pmident (803) 831-3426 FAX February 26, 1998 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Catawba Nuclear Station Docket Nos. 50-413 and 50-414 1997 Annual Report In accordance with Catawba Nuclear Station Technical Specification (TS) 6.9.1.5(a), find attached the 1997 Catawba Nuclear Station Personnel Monitoring Report. This attachment provides a tabulation of the number of station, utility, and other personnel, including contractors receiving exposure greater than 100 mrem / year, followed by the total dose for each respective worker classification and job function during the 1997 calendar year.

Pursuant to TS 6.9.1.5(b) the results of specific activity analysis in which the reactor coolant exceeds the limits as defined in TS 3.4.8 shall be included in the Annual Report.

Catawba did not exceed the specific activity limit during the 1997 calendar year.

If there are any questions concerning the contents of this report, please contact K. E. Nicholson at (803) 831-3237.

Sin r ly, f

filf G. Peterson /l /

\ANNUALRP.97 Attachment xc: L. A. Reyes, Regional Administrator P. S. Tam, ONRR D. J. Roberts, SRI 9803120259 980226 k ,

. . .