Forwards Application for Renewal of Licenses DPR-53 & DPR-69,extending Expiration Date to 20 Yrs Beyond Current Expiration Date
ML20217Q382
Person / Time
Site: Calvert Cliffs  
Issue date: 04/08/1998
From: Cruse C
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217Q388 List:
References
NUDOCS 9804100416
Download: ML20217Q382 (4)


Text

.

i.

CurnLEs H. CausE Baltimore Gas and Electric Company Vice President Calvert Cliffs Nuclear Power Plant O.

Nuclear Energy 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495 4455 April 8,1998 U. S. Nuclear Regulatory Commission t Washington,DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Annlication for License Renewal Baltimore Gas and Electric Company (BGE) hereby applies, pursuant to the provisions of Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), for the renewal of the operating licenses for Calvert Cliffs Nuclear Power Plant (CCNPP) Units 1 and 2, issued pursuant to Section 104b of the Atomic Energy Act of 1954, as amended. Baltimore Gas and Electric Company requests that the licenses be extended 20 years beyond the current expiration dates. Pursuant to 10 CFR 54.17(a) and 10 CFR 50.4(b)(3), the original and 13 copies are provided for an acceptance review. In addition, 26 copies of the environmental report (Volume 3 of the application) are included per 10 CFR S t.55(a).

This application for the renewal of the operating licenses for CCNPP Units 1 and 2 centains the information pursuant to the provisions of 10 CFR Pan 54 for contents of an application. The following items, previously submitted as attachments to References (a) through (m), are included herein,

~

technically unchanged:

The Integrated Plant Assessment (IPA) Methodology and the responses to the associated requests e

for additional information; The Time Limited Aging Analyses Evaluation; and The 35 system and commodity repons reflecting the IPA results.

e All other parts of this application are submitted herein for the first time. The enclosed material is organized as follows:

Attachment (1) - General Information, Technical Information, and Technical Specifications.

1.0 General Information - Sections 1.0 through 1.10.

Appendix A - Technical Information - Sections 1.0 through 6.4.

Appendix B - UFSAR Supplement Appendix C - Technical Specifications Attachment (2)- Applicant's Environmental Report - Operating License Rent:wal Stage h

9004100416 980408 p

O QlO PDR ADOCK 05000317

ikglflA P

PDet

~

[..u --

i L

Document Control Desk

(

. April 8,1998 l

Page 2 l -. rs (l G)

The content and format for system and commodity reports, and the environmental report, were based on l-the templates developed by BGE and NRC, through public meetings, as accepted or acknowledged by NRC in References (n)through (p).

As required by 10 CFR 54.21(b), current licensing basis changes, which have a material effect on the content of this application, will be identified at least annually while the application is under review.

Baltimore Gas and Electric Company intends to provide the first update to this application on or before April 8,1999.

Baltimore Gas and Electric Company is pleased to be involved in a new regulatory process that will be the stepping stone for the future of nuclear power in the United States, made possible by the rcle-making carried through by the NRC. Baltimore Gas and Electric Company also appreciates the cooperation of the NRC Staff with BGE in determining appropriate level of detail, format, and content for this application.

3(V L

re

~

i.

DocumInt Control Desk.

j

- April 8,1998 l

Page 3 LOV We look forward to working with the NRC in our continued pursuit oflicense renewal. Should you have questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours,

/df /

kJV

(

STATE OF MARYLAND j

TO WIT:

COUNTY OF CALVERT I, Charles H. Cruse, being duly sworn, state that I am Vice President - Nuclear Energy, Baltimore Gas and Electric Company (BGE), and that I am duly authorized to execute and file this response on behalf of BGE. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based I

upon information provided by other BGE employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.

l/ //

u dffAY/

's&

Subscribed and sworn before me, a Notary Public in and for the State of Maryland and County of Calvert, this 8th day of April,1998.

WITNESS my Hand and Notarial Seal:

/Im 1

!C Me Donna L. McCready, Notary Publi/

My Commission Expires:

/, MOOA 7

V bate CHC/DLS/ dim

Attachment:

(1) General Information, Technical Information, and Technical Specifications (2) Applicant's Environmental Report - Operating License Renewal Stage cc:

R. S. Fleishman, Esquire Resident inspector, NRC J. E. Silberg, Esquire J. H. Walter, PSC A. W. Dromerick, NRC C.1. Grimes, NRC Director, Project Directorate 1-1, NRC D. L. Solorio. NRC H. J. Miller, NRC C. M. Craig, NRC R. I. McLean, DNR D. R. Lewis, Esquire

cs Document Control Desk April 8,1998 l

Page 4 Ob

REFERENCES:

(a)

Letter from Mr. R. E. Denton (BGE) to NRC Document Control Desk, dated January 1,1996,

" Revision 1 to Integrated Plant Assessment Methodology" (b)

Letter from Mr. R.

E.

Denton (BGE) to NRC Document Control Desk, dated December 15,1995, " Response to Request for Additional Information (RAI) Concerning the Baltimore Gas and Electric Company Report Entitled, Integrated Plant Assessment 3

Methodology, dated August 18,1995" (c)

Letter from Mr. C.11. Cruse (BGE) to NRC Document Control Desk, dated May 23,1997,

" Request for Review and Approval of System and Commodity Reports for License Renewal" (d)

Letter from Mr. C.11. Cruse (BGE) to NRC Document Control Desk, dated July 30,1997,

" Request for Review and Approval of System Reports for License Renewal" (e)

Letter from Mr. C.11. Cruse (BGE) to NRC Document Control Desk, dated July 30,1997,

" Request for Review and Approval of Reactor Pressure Vessels and Control Element Drive Mechanisms / Electrical System and Commodity Reports for License Renewal" (f)

Letter from Mr. C. II. Cruse (BGE) to NRC Document Control Desk, dated July 30,1997,

" Request for Review and Approval of Commodity Report on Environmentally Qualified Equipment for License Renewal" (g)

Letter from Mr. C.11. Cruse (BGE) to NRC Document Control Desk, dated August 21,1997,

" Request for Review and Approval of System and Commodity Reports for License Renewal"

)

(h)

Letter from Mr. C. ii. Cruse (BGE) to NRC Document Control Desk, dated October 22,1997,

" Request for Review and Approval of System and Commodity Reports for License Renewal" (i)

Letter from Mr.

C.

II. Cruse (BGE) to NRC Document Control Desk, dated November 14,1997," Request for Review and Approval of System and Commodity Reports for License Renewal" (j)

Letter from Mr.

C.

ii. Cruse (BGE) to NRC Document Control Desk, dated December 17,1997, " Request for Review and Approval of System Reports for License Renewal" (k)

Letter from Mr. C. II. Cruse (BGE) to NRC Document Control Desk, dated January 21,1998,

" Request for Review and Approval of System and Commodity Reports for License Renewal" (1)

Letter from Mr. C.11. Cruse (BGE) to NRC Document Control Desk, dated March 3,1998,

" Request for Review and Approval of System and Commodity Reports for License Renewal" (m) Letier from Mr. C. II. Cruse (BGE) to NRC Document Control Desk, dated March 27,1998,

" Request for Review and Approval of Commodity and System Reports and the Time-Limited Aging Analyses Evaluation for License Renewal" (n)

Letter from Mr. S. C. Flanders (NRC), dated March 4,1997, " Summary of Meeting with Baltimore Gas and Electric Company (BGE) on BGE License Renewal Activities" (o)

Memorandum from Ms. C. M. Craig (NRC) to Mr. D. B. Matthews (NRC), dated June 16,1997, " Summary of Senior Management Meeting with Baltimore Gas and Electric Company (BGE) to Discuss License Renewal Environmental Report (ER) Template Process" g

(p)

Memorandum from Ms. C. M. Craig (NRC) to Mr. D. B. Matthews (NRC), dated

(

August 21,1997, " Summary of Severe Accident Mitigation Alternatives (SAMA)

I Methodology Meeting with Baltimore Gas and Electric Company (BGE)"

-