ML20217Q244
| ML20217Q244 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 03/05/1998 |
| From: | Pellet J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hutchinson C ENTERGY OPERATIONS, INC. |
| References | |
| RTR-NUREG-1021 50-368-98-301, NUDOCS 9803120104 | |
| Download: ML20217Q244 (5) | |
Text
.
f, l UNITED STATES y
- g.
NUCLEAR REGULATORY COMMISSION g
REGION IV
,[-
611 RYAN PLAZA DRIVE, SulTE 400
,e
+4 AR LlNGTON. TEXAS 76011-8064 March 5, 1998 C. Randy Hutchinson, Vice President Operations
- Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, Arkansas 72801-0967-
SUBJECT:
' INITIAL EXAMINATION - NRC INSPECTION REPORT 50-368/98-301
Dear Mr. Hutchinson:
'In a telephone conversation on February 2,1998, between Mr. Robert Byford, Operations Training Supervisor, and Mr. Michael Murphy, Chief Examiner, arrangements were made for the
' administration of licensing examinations at Arkansas Nuclear One, Unit 2, during the week of August 31,1998.
As agreed during the telephone conversation, your staff will prepare the examinations based on
. the guidelines in interim Revision 8, of NUREG-1021, " Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To mest the above schedule, it will be necessary for your staff to furnish the examination outlines by May 3,1998. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by July 2,1998. Any delay I
in receiving the required examinat?on and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. A validation of the final examination material will be conducted at your facility the week of August 17,1998.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide' adequate space and accommodations in accordance with ES-402 and to /
make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures,
/
temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
i To permit timely NRC review and evaluation, your staff should submit preliminary reactor
. operator and senior reactor operator license applications (Office of Management and Budget
.(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB Lpproval number 3150-0090) at least 30 days before the first j
examination date. If the applications are not received at least 30 days before the examination
)
9903120104 990305 PDR ADOCK 05000368 V
PDR a
Entergy Operations, Inc. date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first exammation date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information colbctions were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30,2000.
The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the col lection of information.
Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the information and Records Management Branch (T-6 F33),
U.S. Nuclear Regalatory Commission, Washington, DC 20555-0001, or by Internet electronic mais at BJSi@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Byford has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Michael Murphy at 817-860-8152 or Mr. John Pellet at 817-860-G159.
J f
Sincerely, John L. Pellet, Chief Operations Branch Division of Reactor Safety Docket No.: 50-368 License No.: NPF-6 cc:
Executive Vice President
& Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, Missialppi_ 39286
L.
j l
Entergy Operations, Inc. Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330
. Rockville, Maryland 20852 County Judge of Pope County
. Pope County Courthouse Russellville, Arkansas 72801 1
Winston & Strawn 1400 L Street, N.W.
Washington, D.C.' 20005-3502 David D. Snellings, Jr., Director Division of Radiation Centrol and Emergency Management Arkansas Department of Health 4815 West Markham Street, Mail Slot 30 Little Rock, Arkansas 72205-3867 Manager Rockville Nuclear Licensing Framatome Technologies 1700 Rockville Pike, Suite 525 Rockville, Maryland 20852 S. Cotton, Training Manager Arkansas Nuclear One P.O. Box 310 London, Arizona 72847 l
(
l I
]
l l
Entergy Operations, Inc. l l-DISTRIBUTION:
g DCD (IE01)(IE42)
Regional Administrator.
l ANO Resident inspector DRS Director l
DRS Deputy Director l
DRP Director Branch Chief (DRP/C) l Project Engineer (DRP/C) l DRS-PSB l
Branch Chief (DRP/TSS)
L. Hurley, Licensing Assistant (DRS/Ob)
R. Gallo (NRR/HOLB)MS: 9D4)
MIS RIV File I
l I
l t
l l
I 1
I DOCUMENT NAME: G:\\DRSLTRS%N301LTR.MEM i
To receive copy of document, Indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:RI:OB E
C:DRS\\OB E
MEMurphy7(gtf JLPellet /1/
I 034//98 03/f98 OFFICIAL RECORD COPY t.
+
4 Entergy Operations, Inc. 3Y Region Administrator ANO R sident inspector DRS Director DRS Deputy Director
- DRP Director Branch Chief (DRP/C)
Project Engineer (DRP/C)
DRS-PSB Branch Chief (DRP/TSS)
L. Hurley, Licensing Assistant (DRS/OB)
R. Gallo (NRR/HOLB)MS: 9D4)
MIS RIV File DOCUMENT NAME: G:\\DRSLTRS%N301LTR.MEM To receive copy of document, fruticate in box:"C" = Copy without endosures *E" = Copy with enclosures "N" = No copy RIV:RI:OB E
C:DRS\\OB E
MEMurphy98tf JLPellet /ff 03t//98 03/f98 OFFICIAL RECORD COPY f