Provides Licensee Requested Response to NRC 971031 SE Stating That Staff Considers Joint Owners Group Program on MOV Periodic Verification an Acceptable industry-wide Response to GL 96-05
ML20217P693
Person / Time
Site: Oyster Creek
Issue date: 04/23/1998
From: Roche M
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1940-98-20126, GL-96-05, GL-96-5, NUDOCS 9805070026
Download: ML20217P693 (2)


Text

.

u GPU Nuclear. Inc.

{ hN

(

u.s. acute is south NUCLEAR Post Office Box 388 Forked River, NJ 02731-0388 l

Tel 609-971-4000 l

(609) 971 4814 April 23,1998 1940-98-20126 i

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen:

1

Subject:

Oyster Creek Nuclear Generating Station (OCNGS)

Docket No. 50-219 Facility Operating License No. DPR-16 Response to Safety Evaluation - Joint Owners' Group Program on Periodic Verification of hiotor-Operated Valves

Reference:

(a) Safety Evaluation on Joint Owners' Group Program on Periodic Verification ofMotor-Operated Valves Described in Topical Report NEDC-32719 (Revision 2), dated 10/30/97 (b) Generic Letter 96-05, " Periodic Verification of Design-Basis Capability of Safety-Related hiotor-Operated Valves", dated 9/18/96 GPU Nuclear's letter to the NRC, dated h1 arch 17,1997 (6730-97-2084), identified that OCNGS intended to follow the periodic verification program for hiotor-Operated Valves (h10V) as outlined in Topical Report NEDC-32719. This Topical Report documented OCNGS' response to Generic Letter 96-05. On October 30,1997, the Nuclear Regulatory Commission issued the referenced Safety Evaluation (SE), which within the conditions and limitations described in the SE, stated that the Staff considers the Joint Owners' Group (JOG) Program on h10V Periodic Verification an acceptable industry-wide response to Generic Letter (GL) 96-05. The JOG had agreed that after the issuance of f

the SE, requests would be made for participating utilities to notify the NRC of their plans to implement g

the JOG program described in Revision 2 of the topical report which was the subject of the SE (i.e.,

NEDC-32719) and that any deviations from the JOG program would bejustified.

i

~7 9805070026 900423 O

PDR ADOCK 05000219 l

P PDR

1940-98-20126

",,Page 2 By this letter, OCNGS is providing the requested SE response. OCNGS plans to continue participatingin the JOG MOV-Periodic Verification Program as a member of the Boiling Water Reactor Owners' Group and plans to implement the program elements described in Topical Report NEDC-32719, Revision 2. No deviations from the JOG program have been currently identified.

The schedule outlined in GPU Nuclearletter to the NRC dated March 17,1997 continues to be applicable.

If any additional information is needed, please contact Mr. David J. Distel, Corporate Regulatory Affairs,at (973)316-7955.

Sincerely, c

Michael B. Roche Vice President and Director Oyster Creek

/DJD cc: Administrator,RegionI OCNGS Senior Project Manager OCNGS Senior ResidentInspector NRC Region I - T. J. Kenny NRC NRR - T. G. Scarbrough i

NRC NRR. T. H. Essig i

1 j