ML20217P310

From kanterella
Jump to navigation Jump to search
Forwards Rev 27 to Vogtle Electric Generating Plant,Units 1 & 2 Emergency Plan.Rev 27 Incorporates Revised Site Boundary Map in Preface,Update Ltrs of Agreement in App 2,changes to Emergency Communication Plan in App 8
ML20217P310
Person / Time
Site: Vogtle  
Issue date: 03/03/1998
From: Mccoy C
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217P314 List:
References
LCV-1024C, NUDOCS 9803100212
Download: ML20217P310 (17)


Text

1 l

C. K. McCoy 5outh:rn Nucleer

s kes :a-Operating Company, Inc.

V:;n D q u 4:'^ x w:.r.O m Pa u.af e se:35 b ~ ';' 3't A B*,3* 8 3520*

]

\\

/

i 2;5 932 7'22 f as 2:5 532 'A 3 k

SOUTHERN L COMPANY March 3,1998 Encry to Serve Your World" LCV-1024C Docket Nos. 50-424 50-425 i

US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 VOGTLE ELECTRIC GENERATING PLANT EMERGENCY PLAN REVISION 27 Ladies and Gentlemen:

In accordance with 10CFR50.54(q) and 10CFR50.4(b)(5). Southern Nuclear Operating Company hereby submits Revision 27 to the Vogtle Electric Generating Plant (VEGP) Units 1 and 2 V(q Emergency Plan (the Plan).

)

Revision 27 incorporates a revised site boundary map in the Preface, updates letters of agreement in Appendix 2 changes to Emergency Communications Plan in Appendix 8 and other editorial changes throughout the Plan. Justifications for the changes are located within Enclosure 1. provides the insertion instructions. Enclosure 3 identifies the revised pages. These plan changes do not decrease the effectiveness of the Plan.

Please contact this office if you have any questions regarding this submittal or contact Mr. L. E.

Mayo Emergency Preparedness Coordinator at (706) 826-3356.

Sincerelv.

C. K. McCoy u'N

,\\

CKM/LEM

~ Su 1 - {l) j l

E.< closures:

1. Justification For Revision 27 to the VEGP Emergency Plan
2. Insertion Instructions Q
3. Revised Plan Pages 9803100212 980303 PDR ADOCK 05000424 lllllllllllllllllllllllll,lllllllll p

PD l

) 6 0 \\. O ' a d'

k(_

j/

~

l cc:

. Southern Nuclear Onerating Comnany Mr. J. B. Beasley, Jr.

Mr. M. Sheibani.

Mr. L. E. Mayo NORMS US Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. D. H. Jaffe, Senior Project Manager, NRR Mr. John Zeiler,. Senior Resident inspector, Vogtle l

1 4

i

~

1

O ENCLOSURE 1 Justification For Revision 27 To The VEGP Emergency Plan O

O

JUSTIFICATION FOR REVISION 27 TO THE i

VEGP EMERGENCY PLAN Enciesurc # 2 i

O Sheet 1 of 12 i

\\

1.

Table OfContents Correct page numbers, titles of tables, and figures.

j Justification:

Eoitorial.

2.

Preface, figure ii Insert updated Vogt;e Electric Generating Plant Site Plan

]

map.

)

Justification:

Editonial.

[

3.

Tebie B-2 EOF Manager Designees, change managers to supervision.

1 Justification:

Too restrictive. Department Superintendents I

and supernorr. are qualified to perform this duty when trained.

4.

Pages D-2 Remove the word approximately.

D-3 & D-4 i

Justification:

Section E 2 of ti e emergency plan states within 15 minutes. This change provides consistency within j

the plan.

5.

Global Change name of Columbia Augusta RegionalMedical Center to Columbia Augusta MedicalCenter.

Justification: Columbia Corporation changed name.

6.

Table F-1 Add column to indicate thet the warning points have an installed EhW.

Also add a footnote (a) to indicate that the NRC Region II Office must be bridged into the ENS system through the NRC Operations Center.

Justification:

Enhance table and clarify the notification method used by NRC 7.

Page O-2 1st Paragraph, last line. Correct typo.

Justification: Editorial.

8.

Appendix 2 Insert new letters of agreement with Columbia Augusta Medical Center, WBBQ radio. WRDWTV, RMC, Eagle 102.3 O

radio, Physicians's Multispecialty Group, Burk Co. Hospital, Westinghouse, Framatome Technolog!<s, Dr. Murray, and Dr. Carter.

JUSTIFICATION FOR REVISION 27 TO THE

.VEGP EMERGENCY PLAN Enclosure # 2 Sheet 2 of 12 Appendix 8 Changes 1.

Pagei Correct page numbers - Vogtle Electric Generating Plant Communications Plan Table Of Contents 2.

Page iii Correct page numbers - Vogtle Electric Generating Plant Communications Plan List Of Tables 3.

Page 3 Item 4.0. A:

. news announcements related to plant emergency conditions...,' insert word ' emergency.

  • Justification:

Consistency with service plan agreements in effect as a result of the license transfer to SNC.

4.

Page 3 Item 4.0.D: Replace the words ' coordinated with ' with

'provided to.' Phrase now reads: '.. news announcements will be provided to representatives.. '

Justification: To describe the new process ofissuing news releases separate from the state.

5.

Page 3 Section 5.0; At the beginning of the second paragraph, insen j

the phrase At an alert classification or higher. '

Justification:

Consistency with service plans in effect after SNC license transfer.

6.

Page 4 Section 5.0: In second paragraph, delete the words 'are written at that location and. ' Phrase now reads '.. news releases must have the approval '

Justification:

To reflect the improved process of not writing news releases in EOF.

7.

Page 4 Section 6.0 and Globally: In first paragraph, replace the words

' Corporate Headquarters Office' with ' Emergency Response Center (ERC). '

Justification:

To reflect the new name of the GPC corporate response facility and alleviate confusion between old name for the facility, Corporate Headquarters facility, and the Headquarters building.

j

l JUSTIFICATION FOR REVISION 27 TO THE VEGP i 11ERGENCY PLAN Enclosurc # 2

,Q Sheet 3 of 12

(/

8.

Page 4 Section 6.0: In fourth paragraph, replace the word ' agencies' with facility

  • and ' concurrence' with ' issue.'

Justification:

To reflect the improved process ofissuing news releases separate from the state.

9.

Page5 Figure A: Delete box to right of ENC, indicating public, media, and industry calls.

Justification:

Information is duplicated in boxes below ENC.

10.

Nge 5 Figure A: Add 'Internet'in box of contacts from ERC.

Justification:

Added as a new contact.

11.

Page 6 Figure B: Add box for new Voice Response Unit (VRU).

l l

Justification:

New unit added which will play recorded l

messages for the public.

12.

Page 6 Figure B: Change Corporate Telephone Response Team box to indicate Rumor Control staff.

I Justification:

Encompasses employee communications, Internet, telephone responses, etc.

13.

Page 6 Figure B: Change GPC office box to GPC Area OfIices.

l Justification:

Change to reflect current terminology.

14.

Page 7 Figure C: Under ENC box, delete Technical Briefer's box.

I Justification:

Technical Briefers no longer needed.

15.

Page 7 Figure C: Remove Facility Coordinator's box Justification:

Facility Coordinator does not contribute to the cornmunications flow.

16.

Page 7 Figure C: Move Media box outside with Public box.

i Justification:

Media not part of the organization.

E JUSTIFICATION FOR REVISION 27 TO THE VEGP EMERGENCY PLAN Enclosure # 2 Sheet 4 of 12 17.

Page 7 Figure C: Under ERC box, add box for VRU, delete separate boxes for multiple rumor control functions and include all in one Rumor Control Staff box.

1 Justification; To make flow ofinformation easier to follow.

18.

Page 8 Figure D: Include threc Corporate activities boxes under one larger Emergency Response Center box.

Justification: To identify activities of the ERC.

19.

Page 8 Figure D: In ENC box, indicate functions which report to Rumor Control Coordinator, who interfaces with PI Director.

I Justificaticn:

To specifylines of communication.

20.

Page 9 Figure E: Consolidate boxes under Emergency Communications Manager.

Justification:

To indicate Rumor Control Staff, which is g) delineated in an earlier figure.

'8 21.

Page 9 Figure E: Delete Writer box under EOF.

Justification:

Role will no longer exist.

22.

Page 9 Delete Technical Briefers box.

Justification:

R. ole will no longer exist.

23.

Page 9 Figure E: Move Security box under Facility / Ops Coordinator.

Justification:

To more accurately reflect reporting.

24.

Page 9 Figure E: Change Photo Staff to AV Staff.

Justification: Change to a more accurate term which better l

reflects duties of position.

i

JUSTIFIC/ ON FOR REVISION 27 TO THE V

~ 'N.RGENCY PLAN m

Enclosure # 2 Sheet 5 of 12 25.

Page 10 I

.it paragraph, first sentence, add 'or the ERC. '

.a.

.m Specifies ERC as distribution point until ENC

.s activatea, i

26.

Yage 10 ltem A5: Change ' Corporate Facilities Assistant'to

' Corporate Fucility Coordinator.'

Justification: ' Consistency with other titles.

27.

Page10 Item A5: Change ' Rumor Control Coordinator-Atlanta ' to

' Corporate Rumor Control Coordinator. '

Justification:

Consistency with other titles.

28.

Yoge 10 ltem A5: Delete Southern Company Services Liaison and Mer'ia Monitoring Coordinator-Atlanta title.

Justification: This will no longer be a separate role. Duties will be handled by telephone responders.

J 29.

Page 10 item A5: Change ' Corporate Office Public Information Secretary' to ' Corporate Public Information Secretary. '

Justifiestion:

Consistency with other titles.

30.

Page10 item A5: Add 'CorporateNewswriter' title.

Justification:

Will now be an active role at ERC.

31.

Page 10 Item A5: Add 'Internet Coordinator' title.

Justification:

This is a new role which will handle Internet activities.

32.

Page11 In A.6.b: Change ' personnel' to ' senior management. '

Justification:

This duty was previously listed twice and

{

responsibility to senior management was not noted.

t O' l

l JUSTIFICATION FOR REVISION 27 TO TIIE t

VEGP EMERGENCY PLAN r'

Enclosure # 2 i

Shed 6 of12 33.

Page11 Item A.6.d: Replace allinformation currently there with

' Posting news :notouncements to GPC's Internet site and monitoring oth.,.spyropriate sites. '

Justification:

Old duties will be executed completely from ENC once it is open. New information reflects new duties to be done at ERC.

34.

Page11 Item A.6.i: Delete item.

Justification:

This duty will be accomplished at ENC once it is open. Reference page 12, C.2.

35.

Page11 Item A.6.j: Replace 'GPC andSNC' with ' company and system. ' and renumber to item A.6.i.

Justification:

Editorial, includes all system employees.

36.

Page11 Item B.1: Replace 'EOFNews Jf'riter' with ' communications i

A staff,

i Justification:

EOF News Writer position no longer exists.

(Technical Assistant and clerical support will still assist EOF Information Coordinator.)

37.

Page11 Item B.2: Delete 'and updates will be written in the EOF and.'

Justification:

News releases are ao longer written in the EOF.

38.

Page11 Item B.3: Delete item.

Justification:

News releases no longer issued jointly with the state.

39.

Page 12 Item C.2: In fourth sentence, insert word ' writing' and add 's' on the word approval.

l Justification:

News releases to be written in the ENC.

Iv

\\

JUSTIFICATION FO.R REVISION 27 TO THE VEGP EMERGENCY PLAN 1

t Enclosure # 2 she:t 7 of 12 1

40.

Page 12 Item C.4: New item - ' News releases concerning site events are prepared in the ENC and transmitted to the EOF (or GOOGfor nuclear approval Prior to release the

\\

information is provided w appropriate government agencies.

(Change subsequent numbering for item C.)

Justification:

New process for writing news releases.

41.

Page 13 Item C 6: In list of positions, delete ' Technical Briefers. '

Justification:

Position will not exist.

i 42.

? age 13 Item C 6: Delete 'Localbfedia Monitor.'

Justification:

No longer a spedfic position. Duties now performed by someone in the teler one response pool.

43.

Page 13 Item C.6: Change 'Photographen' to 'A VSupport Staff" i

Justification:

Title reflects position's duties.

O 44.

Page 14 ltem B.5: Replace ' Evacuate, close, or restrict access to the' with ' Reassign' and add the word ' staff' at the end of the sentence.

Justification:

Accurately reflects the fact that Security will close the Visitor Center.

45.

Page 15 Item 8.0.A: In second paragraph, third sentence, change to read ' Duties willinclude preparation and issue of all utility news releases, news briefings,... '

Justification:

News releases are no longer written jointly with the state but are composed in the ENC.

46.

Page 15 Item 8.0.B: In third sentence, change to read '..and spokespersons of resDonding government agencies..

neiete

' represented in the ENC.'

l l

Justification:

The spokesperson willinteract with i

spokespersons at the ERC as well until the ENC is activated.

O L

l

JUSTIFICATION FOR REVISION 27 TO THE VEGP EMERGENCY PLAN l.

Enclosure # 2 Sheet 8 of 12 47.

Page 16 Item 8.Di Delete 'and the EOFNews Writer' and 'and prepare news releases' and change 'the' to ' news. ' Should read

  • EOF Technical Assistants to assimilatt information about events takingplace. He will obtain nuclear approval of

(

news releasesfrom the Emergency Director... '.

Justification:

Reflects change in news writing process.

48.

Page 17 Item 8.E: Delete

  • Media Monitoring Coordinator-Atlanta '

Justification:

This will no longer be a separate specific titic but will be performed within the telephone response pool.

49.

Page 17 Item 8.E: Add new sentence 'The ro!c will also coordinate Employee Communications a.,d internet activities. '

Justification:

Reflects new tasks and specifies employee duties.

4 50.

Page 17 Item 8.F: Replace 'A/Vstuff' with '...the ENC Rumar l

Control Coordinator, the Visitors Center... '.

Justification:

Reflects change in notifications made as a result of problems identified during Vogtle call out drill.

51.

Page17 11em 8.G: Delete 'and the Local Media Monitor.'

Justification:

Role no longer identified separately.

51.

Page 17 Item 8.G: Change 'GPC or SNC' personnel to 'All. '

Justification:

Contact is not limited to those two companies.

53.

Page 17 Item 8.G: Add ' Corporate' to Rumor Control Coordinator and delete ' Atlanta. '

Jtstification:

Change in position title.

l

JUSTIFICATION FOR REVISION 27 TO THE VEGP EMERGENCY PLAN Enclosure # 2

]

Sheet 9 of 12 i

54.

Page 18 Item 8.H: Replace the words '.l.e, rumor control, employee communications, government andfinancial relations, and.. '

with ' updating recordedpublic messages' Justification:

More accurately reflects the specific duties of the Media Relations Coordinator and reflects new duties associated with new Voice Response Unit.

55.

Page 19 Item 9.0. Begin new paragraph with last sentence of second paragraph. '... Georgia Power Company... '.

\\

Justification.

Editorial. This point delineates corporate communications activities and it is a separate subject from public notifications as discussed in rest of paragraph.

56 Page 19 Item 9.0.D (New item): ' Activation ofa Voice Response Unit (VRU) 1-800 phone number containing a recorded message on current plant status, telephone numbers to callfor off site information and a 1-800' numberfor utility specific questions. Once activated, the number will tie ERC and ENC pQ) telephone response staffs together, allowing calls to be received at eitherlocation. '

Page 19 Item 9 0.E (New item): ' Monitoring the haernetfor media cm'erage, news releasesfrom involved agmies and reports or commentsfrom other interestedgroups '

Justification:

Both of these items reflect new rumor control activities. Change subsequent lettering within this section.

57.

Page 20 Item 9.0.G: Delete 'noted by GPC or SNC representatives' in both second and third sentences.

Justificatioa We will address rumors identified anywhere, not only those noted by employees of these companies.

58 Page 20 Item 9.0 G. In second sentence, add the word ' Corporate' to the title Rumor Control Coordinator, and delete '-Atlanta' from that same title.

Justification:

Title change.

OO i

I l

JUSTIFICATION FOR REVISION 27 TO TIIE VEGP EMERGENCY PLAN

(

Enclosure # 2 Sheet 10 of 12

.k 59 Page 20 Item 9.0.G: In third sentence, insert ' ENC' in front of the title Rumor Control Coordinator, and delete 'in the ENC' at the end i

of that sentence.

Justification:

Makes titles consistent.

l 60.

Page 20 Item 9.0.G: Begin new paragraph with 'Thephone number for the.. '.

i Justification:

Discussion ofdifferent activities. Editorial.

j 61.

Page 20 Item 9.0.G: Insert the word ' utility' before Rumor Control and delete the word ' Desk' afterwards.

Justification:

The phone n 2mber to be distributed is a utility i

number and Rumor Control is now an array of responsibilities, no longer a number on one desk only.

62.

Page 20 Item 9.0.G: Add the words ' serious or widespread' to describe rumors.

V Justification:

Changed because not every rumor will be addressed in this manner.

63.

Page 20 Item 9.0.I: Replace the words '..take names and number.... directed to the ENC.' with '... direct callers to the VRU 800 line When provided with basicfacts they may use that information to respond to inquiries. '

Justification:

Reflects use of the new VRU for rumor control.

64.

Page 20 Item 9.0.]: Delete 'all GPC offices and Southern Nuclear the' and insert 'a.' In second sentence, delete 'that number.'

Combine the second paragraph with the first, and delete the last sentence of the second paragraph.

Justification:

Editorial comment. All Southern employees l

are included in the rumor control process.

I I

l 7'

i

)

JUSTIFICATION FOR REVISION 27 TO THE VEGP EMERGENCY PLAN l

Enclosure # 2 O

Sheet 11 of 12 O

65.

Page 21 Item 11.0.A: Delete 'Ileadquarters' in Corporate PI Secretary title.

i Justification:

Title change.

66.

Page 21 Item 11.0.B Add ' Birmingham' to the locations receiving helicopter service.

i Justification:

Accounts for responders located at SNC.

67.

Page 22 Item 14.0.D: Replace ' Technical Briefers will be available' with ' Industry expertsfrom appropriate agencies (i.e. NEI, INPO) may be called upon. '

Justification:

Technical Briefers position to be eliminated.

68.

Page 22 Item 14.0.D: In second sentence, replace ' approval' with

' knowledge. '

i Justification:

Since these industry reps will not be on gg contract with us, we cannot approve their interviews but we should have knowledge of them.

69.

Page 23 Item 16.0.A: In second paragraph, delete '(primarf and alternate).'

Justification:

The concept of alternates is being phased out.

Everyone who is trained is in the pool and may be called upon as a responder.

70.

Page 23 Item 16.0.A: In second paragraph, third sentence, delete the words ' attendance and '

Justification:

Since we have begun open book testing, attendance records will not be required.

71.

Page 25 Table 1: Position title changes: Change ' Rumor Control Coordinator-Atlanta' to ' Corporate Rumor Control

\\

Coordinator.' Delete ' Media Monitors' and ' Southern Co Svcs Liaison.' Change ' Corp Facilities Assistant' to ' Corp Facility Coordin stor ' Aou 2*rnet Coordinator.'

Justification:

Re tsans for these changes have been discussed previously in thesepstifications.

l l

JUSTIFICATION FOR REVISION 27 TO THE VEGP EMERGENCY PLAN Enclosure # 2

(]/

(

Sheet 12 of 12 72.

Page 26 Under Subject Area, Emergency Communications Staff Position Training, in Description column, change ' Lessons' to

' Training. '

Justification:

As we transition to open book testing and evaluation / testing based on lessons learned and specific problems, we move away from lesson plans except for new responders ' Training' more accurately reflects what we will be' doing.

73.

Page 27 Item 17.0.D: Insert '/SNC' after GPC.

Justification:

SNC employees are now an integral part of those who inform state and local officials.

74.

Page 29 Table 2, sheet 1: Beside EOF Information Coordinator in Designee column, add ' Assistant to Director. ' Beside ENC Rumor Control Coordinator in Designee column delete ' Sales Rep,' add 'LocalManager,' and change ' Operating Engineer' to ' Operating Associate. ' Beside ENC Telephone Response Team in Designee column add ' Plant' before staff. Delete

  • LocalMedia Monitor' position from table.

Justification:

Position changes.

75.

Page 30 Table 2, sheet 2: Beside Facility / Operations Coordinator in Designee column, add 'LocalManager' and 'A VSpecialist.'

Delete ' Operating Supervisor,' and change ' Operating Engineer' to ' Operating Associate. ' Beside ENC News Writer in Designee column, delete Plant ClericalStaff' Beside Corporate Media Relations Coordinator in Designee column, inser: 'GPC andSCS. ' Change Emergency Position of Rumor Control Coordinator-Atlanta to ' Corporate Rumor Control Coordinator,' and insert 'GPC and SCS' beside those positions j

in the Designee column in front of Corporate Communication i

Staff. Delete position of' Media Monitoring Coordinator-Atlanta', and change position of' Corporate Facilities

\\

Assistant' to ' Corporate Facility Coordinator. '

j 1

Justification:

Position changes.

f t

I O

l ENCLOSURE 2 i

Insertion Instructions 4

O

VEGP UNIT 1 AND UNIT 2 EMERGENCY PLAN REVISION 27 02/98 INSERTION INSTRUCTIONS PAGE

-o

.l INSTRUCTIONS

..R5 move-Justification!For: Revision _26 To;The.

Replace.withiRevision i

VEGP:; Emergency PlankEnclosure; #1D (Sheets.1)

-27 (Sheets.1 through'

'throughJ12);'

12)'

TABLE OF CONTENTS Remove Pages (iii through xvil')

Replace Remove Preface,ifiguresii,7 Georgia Powerc

' Replace f

+CompanyiPlant2Alvin W; Vogtle? Site Plan?

W Remove from Section B, Table B-2 (Sheet 1 of 2)

Replace Remove-Pages:D-F through D Replace Remove Page F-5 Replace

= Replace Remove Table F-1~

s Remove Pages L-1 through L-4 Replace Remove.Page 0-1:

Replace-Remove Table 0-1, Sheet 2 of 3 Replace

)

Appendizz2 x

Table Of Contents Replace Replace r Removet letterr#5-WRDW-TV 1

Remove letter #7 Radiation Management Replace Consultants Remove = letter #8: Columbia-Augusta: Medical:

. Replace 17

Center-P Remove letter #9 Physicians' Multispecialty Replace Remove letter #10: Burke
  • County < Hospital--

Replace =

l Remove letter #12 Westinghouse Replace Replace l Removseletter-#14.WBBQ: radio' l

Remove letter #15 WGUS, WEKL, WRXR, WUUS radio Replace l Remove l'etter_#17 Framatome-

-Replace l

Remove letter #23 B.

Lamar Murray, M.D.

Replace l-Remove letter #24: Frank L.

Carter, M.D..

Replace l Appendix 8 l" Remove Pages i through iii-Replace l Remove Pages 1 through 30 Replace O