Text
' s-
ba mac
jt
.
.i..
UNITED STATES
i
-[
k
NUCLEAR REGULATORY COMMISSION
'
,,
!*
..
REGION IV
'S4
P[
611 RYAN PLAZA OHIVE, SUITE 400 l
' 5,, / #
ARLINGTON, TEXAS 760114064
' April 2,1988
. C. Randy Hutchinson, Vice President
Operations
. Arkansas Nuclear One
Entergy Operations, Inc.
-1448 S.R. 333
.Russellville, Arkansas 72801-0967
SUBJECT: NRC INSPECTION REPORT 50-313/98-12; 50-368/98-12 AND NOTICE OF
VIOLATION
Dear Mr. Hutchinson:
'An NRC inspection of inservice inspection program activities and steam generator previous
inspection findings was conducted from March 2-6,1998, at your Arkansas Nuclear One, Units 1
and 2 reactor facilities, with an exit meeting conducted at the conclusion of the onsite inspection.
The inspection was continued by inoffice review, with a final telephonic exit meeting conducted
on March 11,' 1998. The enclosed report presents the scope and results of that inspection.
The results of the inspection of Unit 2 steam generator tube examination activities indicate that
you have continued to satisfactorily implement the eddy current program enhancements that
I
were first utilized during Refueling Outage 2R12. Two violations were identified, however,
pertaining to the failure to provide correct phase rotation settings for analysis of plus point probe
eddy current data, and a change being made to the guidance contained in an engineering
standard without either use of a standard change notice form or revision of the engineering
standard. These issues are of concem since we believe that they are an indicator of areas
remaining where oversight of eddy' current contractor performance is not fully effective.
These violations are cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding the violations are described in detail in the enclosed report. Please note that you
are required to respond to this letter and should follow the instructions specifMxf in the enclosed
Notice when preparing your response. The NRC will use your response, in part, to determine
whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
' in accordance with.10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
. enclosures, and your response will be placed in the NRC Public Document Room (PDR).
1
.p
'
.
l
98040W)O53 990402
.!
..hDRADOCK 05000313
,
_
pop
m
,
E
_,
'
a u
_
.
~,.
3
m
'
"
Entergy Operations, Inc.
-2 "
'
, .er
- Should you have any questions concerning this inspechon, we will be pleased to discuss them
'
with you.
,
Sincerely,
//4 A.Pw
'
Dr. Dale A. Powers, Chief
,
Maintenance Branch
Division of Reactor Safety
Docket Nos.: - 50-313;50-368
,
'
.
>
- Enclosures:
1. Nohce of Violation -
2. NRC Inspection Report '
'50-313/98-12;50-368/98-12
cc w/ enclosures:,
Executive Vice President
& Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
.!
Jackson, Mississippi 39286-1995
Vice President
Operations Support
Entergy Operations', Inc.
P.O. Box 31995
Jackson, Mississippi 39286
4
Manager, Washington Nuclear Operations
ABB Combustion Engineering Nuclear
Power
12300 Twinbrook Parkway, Suite 330
Rockville, Maryland - 20852 -
'
- County Judge of Pope County.
'
Pope County Courthouse -
Russellville, Arkansas 72801-
,
f
i
[
y
'
- y
+
c
,
,>
.e
,
s
f
i
,
>
<
. o
,
,
J
. ,
, ..
,,
Entergy Operations; inc.
-3-
,
Winston & Strawn
4
1400 L Street, N.W.-
T
Washington, D.C. 20005-3502
David D.' Snellings, Jr., Director.
Division of Radiation Control and
Emergency Management
4815 West Markham Street, Mail Slot 30
-
Little Rock, Arkansas 72205-3867
..
Manager .
Rockville Nuclear Licensing
- Framatome Technologies
.1700 Rockville Pike, Suite 525
.
1
Rockville, Maryland 20852
71
- l .
t.
/
1
l
.
8
I
.
NJJ
l?
.
N.s
,.2
.-
.7
'
{
n
.
. Entergy Operations, Inc.-
-4-
'
E-Mail report to T. Frye (TJF) .
E-Mail report to 9. Lange (DJL)
,
E-Mail report to NRR Event Tracking System (IPAS)
'
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRS Director
DRS Deputy Director
DRP Director
MIS System
Branch Chief (DRP/C)
RIV File
Project Engineer (DRP/C)
DRS-PSB
Branch Chief (DRP/TSS)
'. DOCUMENT NAME: R:\\_ANO%N812RP.CAC
Tg receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:RI:MB-
TA
C:MB
E
C:PBB
C:MB
_ , ,
CAClark/imb di .gs IBameL6@*$ DAPowersg
EECollins @/tn DAPowers df
o
04h#98
to "
04/2/98
04A/98
04/7198
04/#/98
OFFICIAL RECORD COPY
,
t
S-
- T.
blC
- !'
K 6. i
Entergy Operations, Inc.
.-4-
>
.,
E Mail report to T. Frye (TJF)
,
E-Mail report to D. Lange (DJL)
l.E-Mail report to NRR Event Tracking System (IPAS)
_
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT) -
' bec to DCD (lE01)
,
_ bec distrib. by RIV:
Regional Administrator
. Resident inspector
DRS Director. '
DRS Deputy Director
, / DRP Director
MIS System
'
Branch Chief (DRP/C)
RIV File
.
Project Engineer (DRP/C)
DRS-PSB
Branch Chief (DRP/TSS)
p
-
,
!
- DOCUMENT NAME: R:\\_ANOWN812RP.CAC.
.
_
'
- To voceive copy of h -- 1 , Indicate in box:"C" = Copy without enclosures "E" = Copy wth enclosures "N" = No copy -
RIV:Rl:MB
TA'
1,, C:MB
E
C:PBB :
C:MB -
CAClark/imb . U __
IBarnes4Syks
DAPowers 0f- EECollins t@'/a DAPowers df'
o
o
"~
04/2/98--
04A/98'
04/ 198:
04/# 98-
/
04/. 48 >
6
'8
OFFICIAL RECORD COPY
fi ,
<=
f/=f
-
'
t
y
,
we 7.; s
'
<
a800091
~
>
,
i h
k<