ML20217M770
| ML20217M770 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 08/19/1997 |
| From: | Padovan L NRC (Affiliation Not Assigned) |
| To: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20217M774 | List: |
| References | |
| TAC-M98329, TAC-M98330, NUDOCS 9708250289 | |
| Download: ML20217M770 (3) | |
Text
_ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ - _ - _ - _
gm August 19, 1997 Mr. George A. Hunger, Jr.
Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk i
P.O. Box No. 195
{
Wayne, PA 19087-0195
SUBJECT:
AVERAGE POWER RANGE MONITOR (APRM) SURVEILLANCE INTERVAL TECHNICAL SPECIFICATIONS CHANGE, PEACH BOTTOM ATOMIC POWER STATION, UNIT NOS.
2 AND 3 (TAC NOS. M98329 AND M98330)
Dear Mr._ Hunger:
The Commission has issued the enclosed Amendments Nos. 219 and 222 to Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Bottom Atoiic Power Station,-Unit Nos. 2 and 3.
These amendments consist of changes to the Technical Specifications (TSs) in response to your March 31, 1997, application-as supplemented by your June-25,_1997, letter.
These amendments extend the APRM flow bias instrumentation surveilla.ce interval from 18 months to 24 months.
This will eliminate the need to perform i
l on-line APRM surveillance testing, which requires plant operators to place an operating unit in a half-scram configuration.
Please inform me when you have
-implemented each of these amendments.
A copy of the Safety Evaluation is also enclosed. We will. include a Notice of Issuance in the Commission's Bi-Weekly Federal Reaister Notice.
Sincerely,
/S/
L.
Mark Padovan, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-277/278
Enclosures:
1.
Amendment No. 219 to DPR-44 2.
Amendment No. 222 to DPR-56
-t 3.
Safety Evaluation cc w/encis:
See next page i
\\
g M0'Brien SMazumdar 1
$$gPUBLIC N
LPadovan ACRS n.PDI-2 Reading OGC; PSwetland, RGN-I 88 BBoger GHill(4).
g JStolz WBeckner OFF PDI-2/PM, es. RDI-2 b.1b
- 5 M
- hB
'0G M PRI-2/D NAME LPadovanM k'Brien-
'JWerm M eIo WBeher $$v/ w JSh I n /97 h /ll /97 N/$/97 h
/
/9\\ T//4'/97 T/k/97 DATE
/
-0FFICIAL RECORD COPY DOCUMENT NAME:
PB98329.AMD I,
trouq g *-
t UNITED STATES p
j NUCLEAR REGULATORY COMMISSION t
WASHINGTON, D.C. 30646-0001
%,...../
August 19, 1997 Mr. George A. Hunger, Jr.
Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19087-0195
SUBJECT:
AVERAGE' POWER RANGE MONITOR (APRM) SURVEILLANCE INTERVAL TECHNICAL SPECIFICATIONS CHANGE, PEACH BOTTOM ATOMIC POWER STATION, UNIT NOS.
2 AND 3 (TAC NOS. M98329 AND M98330)
I
Dear Mr. Hunger:
The Commission has issued the enclosed Amendments Nos. 219 and 222 to.
Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic 1
Power Station, Unit Nos. 2 and 3.
These amendments consist of changes to the Technical Specifications (TSs) in response to your March 31, 1997, application as supplemented by your June 25, 1997, letter.
i These amendments extend the APRM flow bias instrumentation surveillance interval from 18 months to 24 months. This will eliminate the need to perform on-line APRM surveillance testing, which requires plant operators to place an operating unit in a half-scram configuration.
Please inform me when you have implemented each of these amendments.
A copy of the Safety Evaluation is also enclosed. We will include a Notice of Issuance in the Commission's Bi-Weekly Federal Epaister Notice.
Sincerely, 01.------
L.
Mark Padovan, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II.
Office of Nuclear Reactor Regulation Docket Nos. 50-277/278
Enclosures:
1.
Amendment No. 219 to DPR-44 2.
Amendment No. 222 to DPR-36 3.
Safety Evaluation cc w/encls: See next page r
4
-c Mr. George A. Hunger, Jr.
Peach Bottom Atomic Power Station, PECO Energy Company-Units 2 and 3 CC:
J. W. Durham, Sr., Esquire Chief-Division of_ Nuclear Safety Sr. V.P. & General Counsel PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA. 17105-8469 PECO tnergy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township
-1848 Lay Road R. D. #1 t
Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland ATTN:
Regulatory Engineer, A4-5S Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA 17314 Baltimore, MD 21202-6806 i
Resident Inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Dr. Judith % srud 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College,-PA 16803 Department of Environment 201 West Preston Street Manager-Business & Co-owner Affairs Baltimore, MD 21201 Public Service Electric and Gas Company A. F. Kirby, III P.O. Box 236 External Operations - Nuclear Hancocks Bridge, NJ 08038-0236
-Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company Nuclear Group Headquarters Plant Manager-Correspondence Control Desk Peach Bottom Atomic Power Station P.O. Box No. 195 1848 Lay Road Wayne, PA 19087-0195 Delta, PA 17314 Muf