Requests Addl Info Re Proposed Change to Peach Bottom Atomic Power Station,Units 2 & 3,TS to Extend Surveillance Interval for Calibration of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months
ML20138G388
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/01/1997
From: James Shea
NRC (Affiliation Not Assigned)
To: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
TAC-M98329, TAC-M98330, NUDOCS 9705060281
Download: ML20138G388 (4)


Text

__ .. _ __ _. _ ._ . _ _ _ _ _. __ - __. _.

.. . Mr. George A. Hunger. Jr. May 1, 1997

l. Director-Licensing. MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 l Wayne, PA 19087-0195

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) RELATED TO PROPOSED EXTENSION OF SURVEILLANCE INTERVAL FOR CALIBRATION OF AVERAGE POWER RANGE MONITOR FLOW BIAS INSTRUMENTATION, PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (TAC NOS. M98329 AND M98330) l

Dear Mr. Hunger:

l By letter dated March 31, 1997. PECO Energy Company (PECO) submitted a pro)osed change to Peach Bottom Atomic Power Station (PBAPS). Units 2 and 3.

Tec1nical Saecifications to extend the surveillance interval for calibration l of Average power Range Monitor (APRM) flow bias instrumentation from 18 months to 24 months. PECO requested NRC approval of the requested changes by August 17. 1997.

The NRC staff has initiated a review of the proposed changes and determined that additional information is needed to complete the review. The staff's RAI is included as an enclosure. The staff's RAI requests that PECO provide information of the type identified in Generic Letter (GL) 91-04, " Changes in Technical Specification Surveillance Intervals to Accommodate a 24-month Fuel Cycle," in support of its request to extend the APRM flow bias calibration

! interval. In addition to providing the information requested in the RAI.

l please provide a discussion as to why PEC0 did not follow the guidance in GL t

91-04 in preparing its submittal.

l If you have any questions regarding the RAI, please do not hesitate to contact me at (301) 415-1428.

Sincerely, J k N "I NS 'NrYjbct Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-277\278 .

Enclosure:

RAI i

l cc w/ encl: See next page NRC FRE CENTER COPY J i DESTRIRJTON jO \ J em S et

  • Te #. OGC MHart JWermiel PUBLIC JStolz ACRS l PDI-2 Reading JShea MModes, RGN-I
SVarga M0'Brien SMazumdar HICB
*SEE PREVIM S CONCURRENCE
OFFICE I Pd-/PM PDI-Ml(4 PR-2/PD HICB/C*

NAME JS M M rt MONn k1L. JWermiel DATE {/k/97 5 / i /97 i/ ?/97 04/30/97 M ICIAL RECORD COPY DOCU1ENT NAME: G:\ HART \PB98329.RAI 9705060281 970501 PDR ADOCK 05000277 P PDR _

g y~& UNITED STATES g j 2

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2006tMo01 k*****p# May 1, 1997 Mr. George A. Hunger, Jr.

Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19087-0195

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) RELATED TO PROPOSED EXTENSION OF SURVEILLANCE INTERVAL FOR CALIBRATION OF AVERAGE POWER RANGE MONITOR FLOW BIAS INSTRUMENTATION, PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (TAC NOS. M98329 AND M98330)

Dear Mr. Hunger:

By letter dated March 31, 1997. PECO Energy Company (PECO) submitted a pro)osed change to Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3.

Tec1nical S)ecifications to extend the surveillance interval for calibration of Average )ower Range Monitor (APRM) flow bias instrumentation from 18 months to 24 months. PEC0 requested NRC approval of the requested changes by August 17, 1997.

The NRC staff has initiated a review of the proposed changes and determined that additional information is needed to complete the review. The staff's RAI is included as an enclosure. The staff's RAI requests that PECO provide information of the type identified in Generic Letter (GL) 91-04, " Changes in Technical Specification Surveillance Intervals to Accommodate a 24-month Fuel Cycle," in support of its request to extend the APRM flow bias calibration interval. In addition to providing the information requested in the RAI, please provide a discussion as to why PEC0 did not follow the guidance in GL 91-04 in preparing its submittal.

If you have any questions regarding the RAI, please do not hesitate to contact me at (301) 415-1428. ,

Sinc r ,

f Jose I . Shea, Project Manager Proj t Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation j Docket Nos. 50-277/278

Enclosure:

RAI cc w/ encl: See next page I

~

1

' ' l Mr. George A. Hunger, Jr. Peach Bottom Atomic Power Station, PECO Energy Company Units 2 and 3 cc:

J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety l Sr. V.P. & General Counsel PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 8469 i Philadelphia, PA 19101 Harrisburg, PA 17105-8469 I PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township 1848 Lay Road R. D. #1 Delta, PA 17314 Delta, PA 17314 i

PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-5S Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA 17314 Baltimore, MD 21202-6806 Resident Inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 Department of Environment 201 West Preston Street Manager-Business & Co-owner Affairs Baltimore, MD 21201 Public Service Electric and Gas Company l A. F. Kirby, III P.O. Box 236 External Operations - Nuclear Hancocks Bridge, NJ 08038-0236 Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company Nuclear Group Headquarters Plant Manager Correspondence Control Desk Peach Bottom Atomic Power Station P.O. Box No. 195 1848 Lay Road Wayne, PA 19087-0195 Delta, PA 17314

l REQUEST FOR ADDITIONAL INFORMATION i

PEACH BOTTOM ATOMIC POWER STATION. UNITS 2 AND 3 l AVERAGE POWER RANGE MONITOR FLOW BIAS INSTRUMENTATION i CALIBRATION SURVEILLANCE INTERVAL EXTENSION I l

I (1) Generic Letter (GL) 91-04 " Changes in Technical Specification 3

Surveillance Intervals to Accommodate a 24-month Fuel Cycle," was issued A)ril 2, 1991. Enclosure 2 of GL 91-04 provides guidance for addressing tie effect of increased surveillance intervals on instrument drift and safety analysis assumptions. It states that licensees should address a

- number of issues to provide an acceptable basis for increasing the calibration interval for instruments that are used to aerform safety functions. GL 91-04 gives actions that the licensee s1ould address for each issue.

1 Please address each of the provisions of Enclosure 2 to GL 91-04 as they pertain to your request to extend the calibration interval for the APRM

} flow bias instrumentation.

) .

7 i l

i l

1 i 5

1 l

i i

i i

j Enclosure i

J