Amend 116 to License NPF-43,revising Footnote in TS Table 1.2 & * Footnote Associated W/Surveillance Requirements 4.9.1.2 & 4.9.1.3 to Allow Placing Mode Switch in Run or Startup/Hot Standby Positions
ML20217M092
Person / Time
Site: Fermi 
Issue date: 03/31/1998
From: Kugler A
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20217M097 List:
References
NUDOCS 9804080006
Download: ML20217M092 (7)


Text

.

  • %g y

UNITED STATES

f j

NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 20066 4001

%,...../

DETROIT EDISON COMPANY DOCKET NO. 50-341 FERMI 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 116 License No. NPF-43 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by the Detroit Edison Company (the licensee) dated January 28,1998, as supplemented on March 10,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

K k^

9804080006 980331 PDR ADOCK 05000341 P

PDR

2.

- Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-43 is hereby amended to read as follows:

Technical Soecifications and Environmental Pnar:,clien Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 116, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. DECO shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance with full implementation within 90 days.

FOR THE NUCLEAR REGULATORY COMMISSION Andrew J. Kugler, Project Manager Project Directorate ill-1 Division of Reactne " :,jects - lil/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of lasuance: March 31, 1998 s

h

=

ATTACHMENT TO LICENSE ANIENDMENT NO. 116 FACILITY OPERATING LICENSE NO. NPF-43 DOCKET NO. 50-341 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain verticallines indicating the area of change.

REMOVE INSERT 1-9 1-9*

1-10 1-10 3/4 9-1 3/49-1*

3/4 9-2 3/4 9-2

  • Overleaf page provided to maintain document completeness. No changes contained on these pages.

f, DEFINITIONS l

TAett 1.1 I

$URVEILLANCE FREQUENCY N0YJTION l

l l

39 6 l

NOTATION

{

At least encre per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

l 5

l At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

f D

i At least once per 7 days.

W At least ones par 31 days.

M At least once per $2 days.

Q At least once per 144 days.

SA At least once per 366 days.

A At least once per 18 months (550 days).

R Prior to each nactor startup.

S/U Prioi' to each radioactive release.

P Not applicable.

NA l

1-9 FERMI - WIT 2

DEFINTTIONS

-b TABLE 1.2 OPERATIONAL CONDITIONS MODE SWITCH AVERAGE REACTOR COM7 TIM POSITION COOLANT TEMPERATURE 1.

POWER OPERAT!0N Run Any temperature 2.

STARTUP Startup/ Hot Standby Any temperature 3.

HDT SHUTDOWN Shutdown #,***

> 200* F 8

4.

COLD SHUTDOWN Shutdown,88,***

s 200* F****

5.

REFUELING

  • Shutdown or Refuel **,8 s 140' F I

The reactor mode switch may be placed in the Run, Startup/ Hot Standby, or Refuel position to test the switch interlock functions and related instrumentation provided that the control rods are verified to remain fully i

inserted in core cells containing one or more fuel assemblies by a second licensed operator or other technically qualified member of the unit technir.al j

staff.

i 88 The reactor mode switch may be placed in the Refuel position while a single control rod drive is being removed from the reactor pressure vessel per Specification 3.9.10.1.

4

  • Fuel in the reactor vessel with the vessel head closure bolts less than full tensioned or with the head removed.
    • See Special Test Exceptions 3.10.1 and 3.10.3.
      • The reactor mode switch may be placed in the Refuel position while a si control rod is being recoupled or withdrawn provided that the one-rod-out interlock is OPERABLE.
        • See Special Test Exception 3.10.7.

I FERMI - UNIT 2 1-10 Amendment No. U, JJJ 116

~

3/4.9 REFUELING OPERATIONS 3/4.9.1 REACTOR MODE SWITCH LIMITING CONDITION FOR OPERATION 3.9.1 The reactor mode switch shall be OPERABLE and locked in the Shutdown or Refuel position.

When the reactor mode switch is locked in the Refuel position:

a.

A control rod shall not be withdrawn unless the Refuel position one-rod-out interlock is OPERABLE.

b.

CORE ALTERATIONS shall not be performed using equipment associated with a Refuel position interlock unless at least the following associ-ated Refuel position interlocks are OPERABLE for such equipment.

1.

All rods in.

2.

Refuel platform position.

3.

Refuel platform hoists / grapple fuel-loaded.

4.

Fuel grapple position.

5.

Service platform hoist fuel-loaded.

APPLICABILITY:

OPERATIONAL CONDITION 5* #

ACTI.ON:

a.

With the reactor mode switch not locked in the Shutdown or Refuel position as.specified, suspend CORE ALTERATIONS and lock the reactor mode switch in the Shutdown or Refuel position.

b.

With the one-rod-out interlock inoperable, lock the reactor mode switch in the Shutdown position.

With any of the above required Refuel position equipment interlocks c.

inoperable, suspend CORE ALTERATIONS with equipment associated with the inoperable Refuel position equipment interlock.

A See Special Test Exceptions 3.10.1 and 3.10.3.

The reactor shall be maintained in OPERATIONAL CONDITION 5 whenever fuel is in the reactor vessel with the vessel head closure bolts less than fully tensioned or with the head removed.

FERMI - UNIT 2 3/4 9-1 t

REFUELING OPERATIONS SURVEILLANCE REOUIREMENTS 4.9.1.1 The reactor mode switch shall be verified to be locked in the Shutdown or Refuel position as specified:

a.

Within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> prior to:

1.

Beginning CORE ALTERATIONS, and 2.

Resuming CORE ALTERATIONS when the reactor mode switch has been unlocked.

b.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

-4.9.1.2 Each of the above required reactor mode switch Refuel position interlocks

  • shall be demonstrated OPERABLE by performance of a CHANNEL FUNCTIONAL TEST within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the start of and at least once per 7 days during control rod.

withdrawal or CORE ALTERATIONS, as applicabla.

4.9.1.3 Each of the above required reactor mode switch Refuel position interlocks

  • that is' affected shall be demonstrated OPERABLE by performance of a. CHANNEL FUNCTIONAL TEST prior to resuming control rod. withdrawal or CORE ALTERATIONS, as applicable, following repair, maintenance or replacement of any component that could affect the Refuel position interlock.

I l

  • The reactor mode switch may be placed in the Run or Startup/ Hot Standby position to test the switch interlock functions provided that all control rods are verified to remain fully inserted in core cells containing one or more fuel ~ assemblies bv a second licensed operator or other technically l

qualified member of th'e unit. technical staff.

y FERMI - UNIT 2:

3/4 9-2 Amendment No.116

=

- -