ML20217L728
| ML20217L728 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 08/08/1997 |
| From: | Barron H DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20217L735 | List: |
| References | |
| NUDOCS 9708190035 | |
| Download: ML20217L728 (1) | |
Text
- _ _
.~_ _
I glO Duke Power Corapeny A la I~v (*vn=r l
Mdiuirr Nwlear Sea '
d '* 8**
- MG01VP 12700 llapts f erry Rd.
llunternille, NC 28078 9340 H. R. Nrrom
% hrsbet. Mdinier (M) 875-48c0 wnct Nwlear Generanon ikprement (M)875 4809m t
August 8, 1997 U. S, Nuclear Regulatory Commission ATTH: Document Control Desk Washington, D. C. 20555
Subject:
McGuire Nuclear Station, Unit 1 Docket Number 50-369 Core Operating Limits Report for Cycle 12 Please find attached, pursuant to McGuire Technical 1
Specification 6.9.1.9, a copy of Revision 14 to the Core Operating Limits Report (COLR) for McGuire Unit 1 Cycle 12.
This revision includes changes to Figure 5, the K(BU) curve sud monitor factors in Table 1 of Appendix A.
These change. were required to compensate for an error discovered in the LOCA analysis.
A description of the error and the eJfects are described in a 10CFR50.46 notification to the NRC from Duke Energy-(July 25, 1997).
l If there are any questions, please call Virginia Owen at t
(704) 875-5113.
Very truly yours, Nkkc<.<e c.ew H. H
$1arron e
Vice President, McGuire Nuclear Station xc w/atti Mr. Victor Nerses U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation (14H25)
. Washington, D.
C.
20555 Mr. Luis A. Reyes.
h h[}
~
. Administrator, Region II j
U. S. Nuclear Regulatory Commission v
j Atlanta Federal Center y
61-Forsyth St.,
SW, suite-23T85 1qqpqm Atlanta, GA 30303 vbuY I e
Mr. Scott M. Shaeffer NRC Senior Resident Inspector-l-
McGuire Nuclear Station-t RRalsas, spy L
L
- rma 8'm2 p
POR
- - - -