Forwards SE Re Relief Request NDE-R004 for Third 10-yr ISI Interval for Plant.Staff Has Determined That Compliance W/Code Will Result in Hardship or Unusual Difficulty W/O Compensating Increase in Level of Quality & Safety
ML20217K004
Person / Time
Site: Duane Arnold 
Issue date: 04/01/1998
From: Savio R
NRC (Affiliation Not Assigned)
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20217K010 List:
References
TAC-M99851, NUDOCS 9804070100
Download: ML20217K004 (4)


Text

4 k>

'Apri1'1, 1998 e-

.p j g.,

I

- Mr. Lee Liu --

m

, Chairman of the Board and.

{

j Chief Executive Officery j

1

' IES Utilities Inc.

1 200 First Street, SE '

P.O. Box 351 I

Cedar Rapids, lA 52406-0351 l

SUBJECT:

EVALUAT!ON OF RELIEF REQUEST NO. NDE-R004 FOR THE THIRD TEN-

-YEAR llGPbCTION INTERVAL - DUANE ARNOLD ENERGY CENTER.

(TAC NO. M99851)

Dear Mr. Liu:

1 By letter dated October 15,1997, as supplemented on December 5,1997, you submitted a.

request for relief from the requirements of the applicable ASME Code,Section XI, for the third 10-year inservice inspection interval for the Duane Amold Energy Center (DAEC). Specifically, you requested relief from performing one out of the two radiographic inspections required by the staff following a non-code weld repair of a casting shrinkage in the "D" main steam isolation valve (MSIV).

4 The staff has reviewed and evaluated your request as documented in the enclosed safety evaluation. The staff has determined that compliance with the code will result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Your proposed attemative, to perform one more radiographic inspection of the non-code repair area on the "D" MSIV when the valve is disassembled for other reasons, will provide reasonable assurance of structuralintegrity. Accordingly, the altemative is authorized pursuant to 10 CFR 50.55a(a)(3)(ii).

Sincerely, Original signed by:

Richard P. Savio, Acting Director Project Directorate lil-3 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Docket No. 50-331

Enclosure:

' Safety Evaluation cc w/ encl: See next page DISTRIBUTION:

}l Docket File THarris (SE only)

RSavio OGC GGrant, Rill

.ACRS EAdensam (EGA1)

EBamhill R'.mfer y

PUBLIC

. PD3-3 R/F GHill(2).

GTracy

'D DOCUMENT NAME: G:\\DUANEARNiM99851.RLR *See Previous Concurrence OFFICE PD3-3:LA E PD3-3:PM E ECGB:BC OGC PD3-3:PD NAME EBamhill RLaufer F GBagchi*

MYoung*

RSavio A D DATE

,9/1 /98 4/\\ /98 3/17/98 3/27/98 4/ l /98 OFFICIAL RECORD COPY

... ) b

_a'.

9904070100 980401 PDR ADOCK 05000331 4

@C Filf CEMER COPY

i April 1, 1998

'Mr. Lee Liu Chairman of the Board and

  • ~

' Chief Executive Officer IES Utilities Inc.

200 First Street, SE-

' P.O. Box 351 Cedar Rapids, IA 52406-0351

SUBJECT:

EVALUATION OF RELIEF REQUEST NO. NDE-R004 FOR THE THIRD TEN-YEAR INSPECTION INTERVAL - DUANE ARNOLD ENERGY CENTER.

(TAC NO. M99851)

Dear Mr. Liu:

By letter dated October 15,1997, as supplemented on December 5,1997, you submitted a request for relief from the requirements of the applicable ASME Code,Section XI, for the third year inservice inspection interval for the Duane Amold Energy Center (DAEC). Specifically, you requested relief from performing one out of the two radiographic inspections required by the staff following a non-code weld repair of a casting shrinkage in the "D" main steam isolation valve (MSIV).

The staff has reviewed and evaluated your request as documented in the enclosed safety evaluation. The staff has determined that compliance with the code will result in hardship or i

unusual difficulty without a compensating increase in the level of quality and safety. Your j

proposed attemative, to perform one more radiographic inspection of the non-code repair area on the "D" MSIV when the valve is disassembled for other reasons, will provide reasonable assurance of structuralintegrity. Accordingly, the altamative is authorized pursuant to 10 CFR 50.55a(s)(3)(ii).

Sincerely, Original signed by:

Richard P. Savio, Acting Director Project Directorate ill-3 Division of Reactor Projects lil/lV i

Office of Nuclear Reactor Regulation Docket No. 50-331

Enclosure:

Safety Evaluation cc w/ encl: See next page i

DISTRIBUTION.

Docket File THarris (SE only)

RSavio OGC GGrant, Rill ACRS EAdensam (EGA1)

EBamhill RLaufer PUBLIC PD3-3 R/F GHill(2)

GTracy DOCUMENT NAME: G:\\DUANEARNW99851.RLR *See Previous Concunence OFFICE PD3-3:LA E PD3-3:PM E ECGB:BC OGC PD3-3:PD NAME EBamhill RLaufer tv GBagchi*

MYoung*

RSavio / 4)

DATE i/i /98 4/\\/98 3/17/98 3/27/98 4/ l /98 OFFICIAL RECORD COPY

W rou g*

UNITED STATES g

,j NUCLEAR REEULATORY COMMISSION l

~t WASHINGTON, D.C. 20066 4001

,%*****/

April 1, 1998 i

Mr. Lee Liu Chairman of the Board and Chief Executive Officer IES Utilities Inc.

200 First Street. SE P.O. Box 351 Cedar Rapids, IA 52406-0351

SUBJECT:

EVALUATION OF RELIEF REQUEST NO. NDE-R004 FOR THE THIRD TEN-YEAR INSPECTION INTERVAL - DUANE ARNOLD ENERGY CENTER (TAC NO. M99851)

Dear Mr. Liu:

By letter dated October 15,1997, as supplemented on December 5,1997, you submitted a request for relief from the requirements of the applicable ASME Code,Section XI, for the third 10-year inservice inspection interval for the Duane Amold Energy Center (DAEC). Specifically, you requested relief from performing one out of the two radiographic inspections required by the staff following a non-code weld repair of a casting shrinkage in the "D" main steam isolation

- valve (MSIV).

The staff has reviewed and evaluated your request as documented in the enclosed safety evaluation. The staff has determined that compliance with the code will result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Your proposed attemative, to perform one more radiographic inspection of the non-code repair area on the "D" MSIV when the valve is disassembled for other reasons, will provide reasonable assurance of structuralintegrity. Accordingly, the attemative is authorized pursuant to 10 CFR 50.55a(a)(3)(ii).

Sincerely, Ss Richard P. Savio, Acting Director Project Directorate lil-3 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-331

Enclosure:

Safety Evaluation cc w/ encl: See next page

Lee Liu Duane Amold Energy Center IES Utilities Inc.

cc:

Jack Newman, Esquire Kathleen H. Shea, Esquire Morgan, Lewis, & Bockius 1800 M Street, NW.

Washington, DC 20036-586g Chairman, Linn County Board of Supervisors Cedar Rapids, IA 52406 IES Utilities Inc.

ATTN: Gary Van Middlesworth Plant Superintendent, Nuclear 3277 DAEC Road Palo,IA 52324 John F. Franz, Jr.

Vice President, Nuclear Duane Amold Energy Center 3277 DAEC Road Palo,IA 52324 Ken Peveler Manager of Regulatory Performance Duane Amold Energy Center 3277 DAEC Road Palo,IA 52324 U.S. Nuclear Reguletory Commission Resident inspectors Office Rural Route #1 Palo,IA 52324 Regional Administrator, Rlll U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4531 Parween Baig Utilities Division Iowa Department of Commerce Lucas Office Building,5th floor Des Moines,IA 50319 j

i