Correction to Amend 221 to FOL DPR-49.Rev Due to Typographical Error Made in Paragraph 3.17.A.2 on TS Page 3.17-1 Re less-than-or-equal to Symbol Inadvertently Omitted from Paragraph
ML20217J787
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 04/02/1998
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20217J792 List:
References
NUDOCS 9804070011
Download: ML20217J787 (1)


Text

,.

f DAEC-1 LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.17 VESSEL HYDROSTATIC PRESSURE 4.17 VESSEL HYDROSTATIC PRESSURE AND LEAK TESTING AND LEAK TESTING Apphcability :

Apphcabihty-Applies to the performance of ASME Applies to the surveillance requirements required reactor vessel hydrostatic during the performance of ASME required pressure and leak testing.

reactor vessel hydrostatic pressure and leak testing.

Specification:

Specification.

A.

System Availability A.

System Availability

1. Prior to and while exceeding 212*F during 1.

Channel checks shall be performed every the performance of vessel hydrostatic 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> on the Reactor Vessel Water pressure and leak testing, the following Level - Low, Refuel Floor Exhaust Duct -

requirements must be met:

High Radiation, and Reactor Building Exhaust Shaft - High Radiation trip

a. The Reactor Vessel Water Level - Low, functions.

Refuel Floor Exhaust Duct - High Radiation, and Reactor Building Exhaust Shaft - High Radiation trip functions shall be operable

and,
b. Secondary Containment shall be operable, and
c. Secondary Containment Automatic Isolation Dampers shall be operable, and
d. Both trains of Standby Gas Treatment shall be operable, and
e. Two low pressure core cooling pumps (any combination of Core Spray and LPCI) shall be operable and capable of injecting into the vessel.
2. If Specification 3.17.A.1 cannot be met, immediately suspend activities that could increase average reactor coolant temperature or pressure and reduce the everage reactor coolant temperature to s 212*F within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

3.17-1 Amendment No. 221 9804070011 980402 ppR ADOCK 050003 i P