ML20217H696

From kanterella
Jump to navigation Jump to search
Forwards Vols 11 & 12 Conversion to Improved Tech Specs, Correcting Minor Editoral Errors & Inconsistencies within Package.Pages Should Be Substituted for Corresponding Pages in 980312 Submittal
ML20217H696
Person / Time
Site: Farley  
Issue date: 04/24/1998
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217H698 List:
References
NUDOCS 9804300044
Download: ML20217H696 (2)


Text

. _ _ _.

s Dave Morey S:uthern Nucle:r Vice President Operating Compxy i

Farley Project P.O. Box 1295 Birmingham Alabama 35201 g

Tel 205.992.5131 U

SOUTHERN COMPANY Aprt1 24, 1998 Energy ro Serve nur%rld" Docket Numbers: 50-348 10 CFR 50.90 50-364 U.S. Nuclear Regulatory Commission ATTN: Document ControlDesk Washington, DC 20555 Joseph M. Farley Nuclear Plant Request For Technical Specification Changes Conversion to the Improved Technical Soecifications - Clean-Tvoed Copy

.r Ladies and Gentlemen:

By letter dated July 1,1997, Southern Nuclear Operating Company (SNC) committed to submit the Farley Nuclear Plant (FNP) - specific Improved Technical Specifications (ITS) conversion package in March 1998. This package was submitted on March 12,1998 and included the marked-up pages of both the Farley Current Tecimical Specifications (CTS) and the Improved Standard Technical Specifications (ISTS). In addition, documentation discussing the changes made to the CTS, justifications of changes to the ISTS, and the Significant Hazards Evaluations (SHEs) for the conversion were included. The July 1 1997 letter also committed SNC to submit a clean-typed copy of the FNP-specific ITS and Bases in April 1998. Attached in two volumes is the clean-typed copy.

During review of the submitted package for the creation of the clean-typed copy, r,ome changes were made to correct minor editorial errors and inconsistencies within the package.

These changes have not affected the previously submitted SHEs. The changes are included in Attachment 1. These pages should be substituted for the corresponding pages in the March 12,1998 submittal.

I

\\x

\\

.:avae3 o'

N DO K 48 P

PDR

J' U.S. Nuclear Regulatory Commission Page 2 Mr. D. N. Morey states that he is a Vice President of Southern Nuclear Operating Company and is authorized to execute this oath on behalf of Southern Nuclear Operating Company and that, to the best of his knowledge and belief, the facts set forth in this letter and enclosures are true.

If you have any questions, please advise.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY f1 7)/guc Dave Morey Sworn to andsubscribe before me this A day of b

1998 E2klYtL, lab Notary PublM My Commission Expires:

M4 (4c /. cMdd/

'(

t WAS/ cit:itssubet. doc i : Improved Technical Specifications Conversion Revised Marked-Up Pages

Enclosures:

Clean-Typed copy (2 Volumes)

I cc: Mr. L. A. Reyes, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager l

Mr. T. M. Ross, Plant Sr. Resident Inspector Dr. D. E. Williamson, State Department ofPublic Health l

O i